Virginia / Loudoun County

Bathroom Remodel Permit in Loudoun County, Virginia

By Mario Bailey Last checked 2026-07-12 · 1 official source

Verified against official sources Based on building code

It depends

Quick answer

Cosmetic and like-for-like work is exempt in Virginia; relocation work is not. Exempt as ordinary repairs: replacing plumbing fixtures without altering the water supply, drainage, or vent systems; replacing switches, dimmers, standard receptacles, light fixtures, and ceiling fans in dwellings; floor finishes; interior wall or ceiling finishes; cabinetry and trim; paint and wallpaper. A permit is required for removing or adding any wall or partition, any structural component, alterations to water supply, drainage, or vent piping, or electric wiring. So moving a toilet, shower, or sink drain, adding circuits, or removing walls triggers a permit; swapping fixtures in place with new tile and paint does not.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Loudoun County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

What bathroom remodel permit costs in Loudoun County

Billed as a residential alteration: building permit fee is 1% of construction cost plus a $130 plan review fee, with separate electrical or plumbing trade permits if fixtures are relocated, per the county's Residential Additions and Alterations page.

Official fee schedule

How Loudoun County compares in Virginia

No Virginia jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Chesterfield CountyIt dependsFalls under renovation, alteration or conversion: $114 if square footage does...
Fairfax CountyIt dependsNo single line item;
Fauquier CountyIt dependsBilled as a residential alteration at $0.16 per square foot with a $100 minim...
Henrico CountyIt dependsFalls under the existing-dwelling building permit formula of $100 for the fir...
Loudoun Countythis pageIt dependsBilled as a residential alteration: building permit fee is 1% of construction...
Orange CountyIt dependsBills as the residential Alteration category at $0.25 per square foot with a...
Prince William CountyIt dependsNo dedicated line item;

How to apply in Loudoun County

A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.

What most bathroom remodel permit applications include:

  • Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
  • The permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
  • Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
  • A bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
  • New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
  • Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
  • Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Loudoun County Department of Building and Development sets the exact checklist for Loudoun County.

Where to apply in Loudoun County:

Loudoun County Department of Building and Development

  • 1 Harrison Street SE, Leesburg, VA 20175
  • Phone: (703) 777-0220

Inspections and closing out your permit

Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.

  1. Any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
  2. The plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
  3. Work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
  4. Scheduling is on the permit holder: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
  5. A final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Loudoun County permit portal or by phone at (703) 777-0220.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Loudoun County

In 2024, Loudoun County authorized permits for 3,314 new residential housing units (1,496 single-family, 1,818 in multi-family buildings), valued at $458M, up from1,782 the year before. That works out to about 7.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 443,380.

About Loudoun County

Loudoun County has about 144,804 housing units. The median home is valued at $701,000, against a median household income of $178,707. About 78% of homes are owner-occupied, and the typical home was built around 2002.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a bathroom remodel permit in Loudoun County?
Cosmetic and like-for-like work is exempt in Virginia; relocation work is not. Exempt as ordinary repairs: replacing plumbing fixtures without altering the water supply, drainage, or vent systems; replacing switches, dimmers, standard receptacles, light fixtures, and ceiling fans in dwellings; floor finishes; interior wall or ceiling finishes; cabinetry and trim; paint and wallpaper. A permit is required for removing or adding any wall or partition, any structural component, alterations to water supply, drainage, or vent piping, or electric wiring. So moving a toilet, shower, or sink drain, adding circuits, or removing walls triggers a permit; swapping fixtures in place with new tile and paint does not. Always confirm with the Loudoun County Department of Building and Development before starting.
How much does a bathroom remodel permit cost in Loudoun County?
Billed as a residential alteration: building permit fee is 1% of construction cost plus a $130 plan review fee, with separate electrical or plumbing trade permits if fixtures are relocated, per the county's Residential Additions and Alterations page. See the official fee schedule for current amounts.
Where do you apply for a bathroom remodel permit in Loudoun County?
You can apply through the Loudoun County permit portal or contact the Loudoun County Department of Building and Development directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Loudoun County?
Under Virginia law (Va. Code 54.1-1101(A); 13VAC5-63-80 (USBC Sections 108.3, 108.4)): Yes. Va. Code 54.1-1101(A) exempts any person who performs or supervises construction, removal, repair, or improvement of no more than one primary residence owned by them and for their own use during any 24-month period. The exemption covers the whole licensing chapter, including tradesman licensing for electrical, plumbing, and HVAC, so it reaches trade work on the owner's own primary residence. Under the USBC the permit applicant may be the owner or the owner's agent, and an applicant may file a written statement that they are not subject to licensure instead of proof of license. Limits: one primary residence per 24 months, for the owner's own use; rental and investment property work is not covered. Confirm how Loudoun County applies this before you apply.

From the Library

What else needs a permit in Loudoun County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedA county-typical (pre-approved design) deck under 1,000 sq ft outside an incorporated t...
Electrical PermitPermit requiredNot specifiedBase fee for adding, replacing or relocating fixtures, receptacles or circuits in a 1 o...
EV Charger PermitPermit requiredNot specifiedNo EV-specific fee line;
Fence PermitNo permit neededNot specifiedTypical residential fences are exempt from the Zoning Permit requirement so no fee appl...
HVAC PermitPermit requiredNot specifiedBase Mechanical Permit fee for adding, replacing or relocating central heating or air c...
Patio PermitIt dependson-grade concrete or paver patios need no building permit; a permit is required for covered patios, patio covers, or slabs designed to support a future structureNot published
Plumbing PermitPermit requiredNot specifiedBase fee for adding, replacing or relocating plumbing equipment in a 1 or 2 family dwel...
Pool PermitPermit requiredNot specifiedFlat $260 covers both the county building and zoning permit fees for a residential pool...
Roof Replacement PermitIt dependspermit required if replacing more than 256 sq ft of roof decking or making structural changes or changing roofing materialsNo dedicated fee line;
Shed PermitIt dependsunder 256 sq ft requires zoning permit only; 256 sq ft or larger requires a building permit in addition to zoning permitZoning-only permit is $165;
Solar PermitPermit requiredNot specifiedBuilding permit fee is $230 and electrical permit fee is $70 for rooftop systems;
Water Heater PermitIt dependsNot specifiedNo dedicated line;

Bathroom Remodel Permit in other Virginia localities

Official sources

Verified by a person against the sources above on 2026-07-12, not confirmed with Loudoun County Department of Building and Development. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-12Report an error on this page

Compare Bathroom Remodel Permit requirements across Virginia localities