Massachusetts / Boston

Bathroom Remodel Permit in Boston, Massachusetts

By Mario Bailey Last checked 2026-07-12 · 1 official source

Verified against official sources Based on building code

It depends

Quick answer

Depends on scope. Under 780 CMR R105.2 item 6, 'Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work' needs no building permit, with the code's own caveat that 'Permits may be required for Electrical, Plumbing, or Gas work.' R105.2.2 exempts ordinary repairs but requires a permit for 'the substantial cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load-bearing support, or the removal or change of any required means of egress.' Moving fixtures triggers the trade permits: any plumbing or gas alteration or replacement requires a permit issued to a licensed plumber or gas fitter (248 CMR 3.05(1)(b)), and wiring changes require the electrical permit process under M.G.L. c. 143, s. 3L.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Boston, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

What bathroom remodel permit costs in Boston

Non-structural bathroom work uses the Short-Form building permit at $20 primary plus $10 per $1,000 of estimated cost; moving walls needs Long-Form at $50 primary plus $10 per $1,000, with plumbing and electrical trade permits on top, per the ISD fee schedule effective 5/15/2023.

Official fee schedule

How to apply in Boston

A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.

What most bathroom remodel permit applications include:

  • Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
  • The permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
  • Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
  • A bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
  • New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
  • Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
  • Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).

General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Inspectional Services Department sets the exact checklist for Boston.

Where to apply in Boston:

Inspectional Services Department

  • 1010 Massachusetts Avenue, 5th Floor, Boston, MA 02118
  • Phone: (617) 635-5300
  • Email: isd@boston.gov

Inspections and closing out your permit

Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.

  1. Any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
  2. The plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
  3. Work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
  4. Scheduling is on the permit holder: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
  5. A final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Boston permit portal or by phone at (617) 635-5300.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Boston

In 2024, Boston authorized permits for 1,789 new residential housing units (72 single-family, 1,717 in multi-family buildings), valued at $812M, down from2,051 the year before. That works out to about 2.6 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 691,531.

About Boston

Boston has about 307,840 housing units. The median home is valued at $710,400, against a median household income of $94,755. About 35% of homes are owner-occupied, and the typical home was built around 1947.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a bathroom remodel permit in Boston?
Depends on scope. Under 780 CMR R105.2 item 6, 'Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work' needs no building permit, with the code's own caveat that 'Permits may be required for Electrical, Plumbing, or Gas work.' R105.2.2 exempts ordinary repairs but requires a permit for 'the substantial cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load-bearing support, or the removal or change of any required means of egress.' Moving fixtures triggers the trade permits: any plumbing or gas alteration or replacement requires a permit issued to a licensed plumber or gas fitter (248 CMR 3.05(1)(b)), and wiring changes require the electrical permit process under M.G.L. c. 143, s. 3L. Always confirm with the Inspectional Services Department before starting.
How much does a bathroom remodel permit cost in Boston?
Non-structural bathroom work uses the Short-Form building permit at $20 primary plus $10 per $1,000 of estimated cost; moving walls needs Long-Form at $50 primary plus $10 per $1,000, with plumbing and electrical trade permits on top, per the ISD fee schedule effective 5/15/2023. See the official fee schedule for current amounts.
Where do you apply for a bathroom remodel permit in Boston?
You can apply through the Boston permit portal or contact the Inspectional Services Department directly. The links are listed on this page.
Can a homeowner pull a bathroom remodel permit themselves in Boston?
Under Massachusetts law (780 CMR R105.3; 780 CMR 110.R5.1.3.1 (10th ed.); M.G.L. c. 142, s. 3; M.G.L. c. 141, s. 1A): Yes for the building permit itself: 780 CMR R105.3 says 'the owner or authorized agent shall file a permit application.' The construction supervisor license (CSL) rules contain an explicit homeowner exemption at 780 CMR 110.R5.1.3.1: 'Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work, then such homeowner shall act as supervisor.' 'Homeowner' is defined as a person who owns a parcel on which he or she resides or intends to reside with a one- or two-family dwelling; a person who constructs more than one home in a two-year period does not qualify. The exemption does not extend to the trades: plumbing and gas work requires licensure under M.G.L. c. 142, s. 3, which contains no homeowner exemption, and the electrician licensing exemptions in M.G.L. c. 141, s. 1A likewise do not include homeowners. Confirm how Boston applies this before you apply.

From the Library

What else needs a permit in Boston

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdetached decks not more than 30 inches above grade and under 200 sq ft that do not serve an exit door may be exemptBilled as building work: Short-Form at $20 primary plus $10 per $1,000 of estimated cos...
Electrical PermitPermit requiredNot specified$20 application fee plus $0.25 per amp for service upgrades or $1 per fixture for other...
EV Charger PermitPermit requiredNot specifiedAn Electrical Permit is required per Boston's EVSE installation guide, billed under the...
Fence PermitIt dependspermit required for fences over 6 feet in height per Massachusetts 780 CMRNot published
HVAC PermitPermit requiredNot specifiedNo single HVAC line;
Plumbing PermitPermit requiredNot specified$20 application fee plus $5 per fixture such as toilets and sinks
Pool PermitPermit requiredNot specifiedPools need a Use of Premises Permit at a $50 primary fee per the ISD fee schedule effec...
Roof Replacement PermitPermit requiredNot specifiedRoof replacement with no structural change uses the Short-Form building permit at $20 p...
Shed PermitIt dependsone-story detached accessory sheds used for tools or storage are exempt if floor area does not exceed 120 sq ftSheds need a Use of Premises Permit at a $50 primary fee, named alongside pools on the...
Solar PermitPermit requiredNot specifiedSystems under 20 kWh on 1-2 family homes qualify for Short-Form at $20 primary plus $10...
Water Heater PermitPermit requiredNot specifiedWater heater or boiler swaps with no other work use a Plumbing Permit at $20 primary pl...

Official sources

Verified by a person against the sources above on 2026-07-12, not confirmed with Inspectional Services Department. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-12Report an error on this page

Compare Bathroom Remodel Permit requirements across Massachusetts localities