Bathroom Remodel Permit in Philadelphia, Pennsylvania
By Mario Bailey Last checked 2026-07-12 · 1 official source
Verified against official sources Based on building codeIt depends
Quick answer
Scope-dependent. 34 Pa. Code 403.62(d): 'An ordinary repair does not require a permit,' but the regulation lists what is not an ordinary repair, including '(1) Cutting away a load-bearing wall, partition or portion of a wall,' '(2) The removal or cutting of any structural beam or load-bearing support,' '(3) The removal or change of any required means of egress,' and '(4) The addition to, or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical.' So like-for-like fixture replacement is not permit work, while moving plumbing, wiring, or structural walls is. The statute also excludes from the act 'repairs to residential buildings' and 'alterations to residential buildings which do not make structural changes or changes to means of egress,' in each case 'except as might be required by ordinances' under sections 303(b)(1) or 503 (Act 45 Section 104(b)(5) and (6); mirrored at 34 Pa. Code 403.1(b)(8) and (9)), so stricter municipal ordinances can change the answer locally.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Philadelphia, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
What bathroom remodel permit costs in Philadelphia
Billed as a plumbing alteration permit at $50 for the first 7 fixtures plus $22.50 per additional fixture; no separate building permit under the EZ standard for a one-family dwelling, per the L&I construction fee schedule effective 1/1/2025 (rev 2/2026).
How to apply in Philadelphia
A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
What most bathroom remodel permit applications include:
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- The permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- A bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Department of Licenses and Inspections sets the exact checklist for Philadelphia.
Where to apply in Philadelphia:
Department of Licenses and Inspections
- 1401 John F. Kennedy Blvd., MSB, Philadelphia, PA 19102
- Phone: (215) 255-4040
Inspections and closing out your permit
Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- Any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- The plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- Work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- A final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Philadelphia permit portal or by phone at (215) 255-4040.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Bathroom Remodel Permit checklist for Philadelphia
- Confirm the requirement. Sometimes, depending on the project.
- Budget the fee. Billed as a plumbing alteration permit at $50 for the first 7 fixtures plus $22.50 per additional fixture; no separate building permit under the EZ standard for a one-family dwelling, per the L&I construction fee schedule effective 1/1/2025 (rev 2/2026). Official fee schedule.
- Apply. A bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt. Start at the Philadelphia permit portal.
- Keep the office details handy. Department of Licenses and Inspections. Phone: (215) 255-4040. Address: 1401 John F. Kennedy Blvd., MSB, Philadelphia, PA 19102.
- Plan for inspections. Once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
Compiled from the official sources on this page. Last checked 2026-07-12.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Permitting activity in Philadelphia
In 2024, Philadelphia authorized permits for 2,962 new residential housing units (539 single-family, 2,423 in multi-family buildings), valued at $498M, down from3,863 the year before. That works out to about 1.9 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 1,578,487.
About Philadelphia
Philadelphia has about 739,725 housing units. The median home is valued at $232,400, against a median household income of $60,698. About 52% of homes are owner-occupied, and the typical home was built around 1949.
Source: U.S. Census Bureau, American Community Survey 2023 5-year.
Frequently asked questions
- Do you need a bathroom remodel permit in Philadelphia?
- Scope-dependent. 34 Pa. Code 403.62(d): 'An ordinary repair does not require a permit,' but the regulation lists what is not an ordinary repair, including '(1) Cutting away a load-bearing wall, partition or portion of a wall,' '(2) The removal or cutting of any structural beam or load-bearing support,' '(3) The removal or change of any required means of egress,' and '(4) The addition to, or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical.' So like-for-like fixture replacement is not permit work, while moving plumbing, wiring, or structural walls is. The statute also excludes from the act 'repairs to residential buildings' and 'alterations to residential buildings which do not make structural changes or changes to means of egress,' in each case 'except as might be required by ordinances' under sections 303(b)(1) or 503 (Act 45 Section 104(b)(5) and (6); mirrored at 34 Pa. Code 403.1(b)(8) and (9)), so stricter municipal ordinances can change the answer locally. Always confirm with the Department of Licenses and Inspections before starting.
- How much does a bathroom remodel permit cost in Philadelphia?
- Billed as a plumbing alteration permit at $50 for the first 7 fixtures plus $22.50 per additional fixture; no separate building permit under the EZ standard for a one-family dwelling, per the L&I construction fee schedule effective 1/1/2025 (rev 2/2026). See the official fee schedule for current amounts.
- Where do you apply for a bathroom remodel permit in Philadelphia?
- You can apply through the Philadelphia permit portal or contact the Department of Licenses and Inspections directly. The links are listed on this page.
- Can a homeowner pull a bathroom remodel permit themselves in Philadelphia?
- Under Pennsylvania law (34 Pa. Code 403.62(a); Act 132 of 2008 (HICPA), Section 2 (73 P.S. 517.2)): Yes. 34 Pa. Code 403.62(a) provides that 'An owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a residential building or erect, install, enlarge, alter, repair, remove, convert or replace an electrical, gas, mechanical or plumbing system regulated by the Uniform Construction Code shall first apply to the building code official and obtain the required permit.' The owner is a permitted applicant. The Home Improvement Consumer Protection Act (Act 132 of 2008, 73 P.S. 517.1 et seq.) is a registration and consumer-protection law for contractors: its 'Contractor' definition covers a person 'who owns and operates a home improvement business or who undertakes, offers to undertake or agrees to perform any home improvement,' so it governs people doing home improvements for others, not homeowners doing their own work. Pennsylvania has no statewide trade licensing barring homeowner work; trade licensing, where it exists, is municipal. Confirm how Philadelphia applies this before you apply.
From the Library
What else needs a permit in Philadelphia
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | residential decks up to 216 sq ft (excluding roof decks) qualify for EZ permit without plans; larger decks require full building permit with plans | New decks fall under the accessory structure and addition bucket at $75 for the first 5... |
| Electrical Permit | Permit required | Not specified | $100 filing fee (nonrefundable); |
| EV Charger Permit | It depends | Not specified | Charged as a standard electrical permit at $25 per $1,000 of estimated cost with a $63... |
| Fence Permit | It depends | permit required if fence exceeds 6 feet tall, is masonry over 2 ft, is on Historic Registry, or is in the 100-year floodplain | Zoning permit $50-$632 by lot size; |
| HVAC Permit | Permit required | Not specified | $100 filing fee (nonrefundable); |
| Patio Permit | It depends | concrete or other hard-surface paving on grade (driveways, walkways, patios not used for parking) is exempt; covered or elevated patio structures require a permit, and paving in flood protection areas requires one | No fee; |
| Plumbing Permit | Permit required | Not specified | $100 filing fee (nonrefundable); |
| Pool Permit | It depends | prefabricated swimming pools or spas less than 24 inches deep AND less than 5000 gallons do not require a permit; all larger pools require a permit | Flat $69 building permit fee for a pool or spa accessory to a one or two family dwellin... |
| Roof Replacement Permit | Permit required | Not specified | Flat $69 building permit fee to replace the roof covering on a one or two family dwelli... |
| Shed Permit | It depends | detached structures under 200 sq ft for one-or-two-family dwellings do not require a permit | Sheds 120 sq ft or less in the rear yard need no permit; |
| Solar Permit | Permit required | Not specified | Flat $200 building permit fee for the solar panel structure plus a separate electrical... |
| Water Heater Permit | Permit required | Not specified | Flat $31 plumbing permit fee to replace a water heater in a one or two family dwelling,... |
Official sources
Verified by a person against the sources above on 2026-07-12, not confirmed with Department of Licenses and Inspections. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-12Report an error on this page
Compare Bathroom Remodel Permit requirements across Pennsylvania localities