New Mexico / Bernalillo County
Bathroom Remodel Permit in Bernalillo County, New Mexico
It depends
Sometimes, depending on the project
Before moving or adding plumbing fixtures, adding circuits, or making structural changes; not for tiling, cabinets, countertops or similar finish work alone.
Issued byBernalillo County Planning & Development Services, Building Section
By Mario Bailey, verified against official sources
Quick answer
Bernalillo County publishes no bathroom-specific rule; its exemption list decides it. Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work need no building permit, but separate plumbing, electrical and mechanical permits are still required for trade work. Removing and reinstalling a toilet is exempt only when no valves, pipes or fixtures are replaced or rearranged.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Remodel contractors usually handle the permits as part of the job. Comparing a few bids before you commit is the useful next step.
Compare bathroom remodel quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before moving or adding plumbing fixtures, adding circuits, or making structural changes; not for tiling, cabinets, countertops or similar finish work alone.
What a bathroom remodel permit costs in Bernalillo County
How to apply in Bernalillo County
In Bernalillo County, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt.
What most bathroom remodel permit applications include:
- Creating a new bathroom or toilet room, or altering, moving, or replacing a plumbing, electrical, gas, or mechanical system as part of the remodel, is regulated work that requires a permit before work starts, usually filed as separate building, electrical, mechanical, and plumbing permit applications submitted together (IRC R105.1).
- For Bernalillo County, the permit application itself must identify and describe the work, describe the site, state the intended use, be accompanied by construction documents, state the valuation of the work, and be signed by the applicant or their agent (IRC R105.3).
- Those construction documents have to show the location, nature, and extent of the proposed work, which in practice means a scaled existing and proposed floor plan showing every fixture, outlet, switch, and vent fan, including the code-mandated clearances around fixtures such as the water closet (IRC R106.1.1; R307.1 fixture clearances).
- For Bernalillo County, a bathroom needs ventilation: mechanical exhaust ducted to the outside where the required openable window is absent, sized in the range of 50 cubic feet per minute intermittent (IRC R303.3; M1505).
- New or relocated bathroom receptacles must be ground-fault circuit-interrupter protected (IRC E3902.1 / NEC 210.8(A)(1)).
- Tub and shower walls have to be finished with a nonabsorbent, waterproof surface extending to a minimum height above the floor (IRC R307.2).
- Routine maintenance items such as towel bars, mirrors, paint, or floor coverings done alone are commonly permit-exempt, but that exemption ends once the work relocates fixtures or opens up wiring, piping, or walls, so a like-for-like fixture swap should be checked against the local exemption list rather than assumed (IRC R105.2).
General submittal guidance from International Residential Code (IRC), 2021 edition, Sections R105, R106, R303.3, R307, and E3902. Source. Bernalillo County Planning & Development Services, Building Section sets the exact checklist for Bernalillo County.
Where to apply in Bernalillo County:
Bernalillo County Planning & Development Services, Building Section
- 415 Silver Ave. SW, 2nd Floor, Albuquerque, NM 87102
- Phone: (505) 314-0350
- Email: permits@bernco.gov
Bathroom Remodel Permit in Bernalillo County compared with nearby New Mexico localities
| Locality | Permit needed? | Threshold | What each New Mexico schedule says | Verified |
|---|---|---|---|---|
| Bernalillo County | It depends | Before moving or adding plumbing fixtures, adding circuits, or making structural changes | Building work is valuation-based under Resolution 25-2009 Table 3-A ("$30.00 plus $4.00... | |
| Albuquerque | It depends | Finish work and same-configuration fixture swaps are exempt; altered piping, new wiring or structural changes need permits | Building permit (if structural or layout work) by valuation under "TABLE 112-A BUILDING... |
Inspections and closing out your permit
In Bernalillo County, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
- In Bernalillo County: any construction or work covered by the permit stays subject to inspection and must remain accessible and exposed until the building official approves it (IRC R109.1).
- In Bernalillo County: the plumbing, mechanical, and electrical rough-in has to be inspected and approved before it is covered or concealed, before fixtures or appliances are installed, and before the framing inspection, so the trade work behind the walls is signed off before drywall closes them up (IRC R109.1.2, R109.1.4).
- In Bernalillo County: work cannot proceed past the point covered by the last approved inspection without the building official's sign-off (IRC R109.4).
- Scheduling is on the permit holder in Bernalillo County: it is their duty to notify the building official when work is ready and to provide access for each inspection (IRC R109.3).
- In Bernalillo County: a final inspection, covering everything required by the permit including items such as GFCI protection, closes out the job once all the permitted work is complete (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Bernalillo County permit portal or by phone at (505) 314-0350.
Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Inspections). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Bathroom Remodel Permit checklist for Bernalillo County
- Confirm the requirement. Sometimes, depending on the project. Usually needed: Before moving or adding plumbing fixtures, adding circuits, or making structural changes; not for tiling, cabinets, countertops or similar finish work alone.
- Budget the fee. Building work is valuation-based under Resolution 25-2009 Table 3-A ("$30.00 plus $4.00 per $1,000.00 Valuation" plus "$30.00 plus $2.00 per $1,000.00 Valuation" plan review); trade work adds Table 3-D plumbing ($23.50 administrative charge, $5.00 per plumbing fixture) and Table 3-B electrical ($23.50 administrative charge, outlets $0.75 each for the first 20). Official fee schedule.
- Apply. In Bernalillo County, a bathroom remodel that creates a new bathroom or touches its plumbing, wiring, or walls needs a building permit application, typically filed as separate building, electrical, mechanical, and plumbing permits submitted together and backed by a floor plan showing the fixture layout. A simple like-for-like fixture swap with no other work is often exempt. Start at the Bernalillo County permit portal.
- Keep the office details handy. Bernalillo County Planning & Development Services, Building Section. Phone: (505) 314-0350. Address: 415 Silver Ave. SW, 2nd Floor, Albuquerque, NM 87102.
- Plan for inspections. In Bernalillo County, once the permit is issued, the work stays subject to inspection at each stage, and the plumbing, mechanical, and electrical rough-in must be inspected and approved before the walls are closed up. A final inspection, made after everything required by the permit is done, closes out the job.
Compiled from the official sources on this page. Last checked .
Permitting activity in Bernalillo County
In 2025, Bernalillo County authorized permits for 1,560 new residential housing units (668 single-family, 892 in multi-family buildings), valued at $314M, up from 1,316 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 667,601.
Frequently asked questions
- Do you need a bathroom remodel permit in Bernalillo County?
- Bernalillo County publishes no bathroom-specific rule; its exemption list decides it. Painting, papering, tiling, carpeting, cabinets, countertops and similar finish work need no building permit, but separate plumbing, electrical and mechanical permits are still required for trade work. Removing and reinstalling a toilet is exempt only when no valves, pipes or fixtures are replaced or rearranged. Always confirm with the Bernalillo County Planning & Development Services, Building Section before starting.
- How much does a bathroom remodel permit cost in Bernalillo County?
- Building work is valuation-based under Resolution 25-2009 Table 3-A ("$30.00 plus $4.00 per $1,000.00 Valuation" plus "$30.00 plus $2.00 per $1,000.00 Valuation" plan review); trade work adds Table 3-D plumbing ($23.50 administrative charge, $5.00 per plumbing fixture) and Table 3-B electrical ($23.50 administrative charge, outlets $0.75 each for the first 20). See the official fee schedule for current amounts.
- How long does a bathroom remodel permit take in Bernalillo County?
- The general turn-around time for a residential building permit is five working days (Building Services FAQ). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a bathroom remodel permit in Bernalillo County?
- You can apply through the Bernalillo County permit portal or contact the Bernalillo County Planning & Development Services, Building Section directly. The links are listed on this page.
- Can a homeowner pull a bathroom remodel permit themselves in Bernalillo County?
- Under New Mexico law (NMSA 1978, 60-13-3(D)(10), (11); 14.5.2.8(B) NMAC; 14.5.2.18 NMAC): Yes, with tight limits. CILA exempts from the contractor definition an individual who, alone or with wage-paid help, builds or makes installations, alterations or repairs to a single-family dwelling he owns and occupies or will occupy (60-13-3(D)(10)), and a person building or improving a single-family residence for personal use (60-13-3(D)(11)). The work must still meet all state codes, and CID's homeowner permit (14.5.2.18 NMAC) applies only to the owner's primary residence and its garages, carports and sheds, never to rental, other owned or commercial property. The homeowner must perform the major portion of the work by dollar amount and file a signed, notarized responsibility sheet. A homeowner electrical permit requires passing a CID homeowner electrical exam (75% to pass), a plumbing permit requires a competency showing that may include a written exam, and no homeowner permit is issued for HVAC, natural gas or LP gas work. The project may not be put on the market while under construction (doing so voids the permit and can bring unlicensed contracting charges), and only one single-family homeowner permit may be issued to the same owner in any 12-month period. Confirm how Bernalillo County applies this before you apply.
From the Library
What else needs a permit in Bernalillo County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of a platform above grade; also not over a basement or story below and not part of an accessible route | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Electrical Permit | It depends | Before adding or altering wiring, circuits, outlets, panels or services | Resolution 25-2009 Table 3-B Electrical Permit Fees: administrative charge $23.50 each |
| EV Charger Permit | It depends | Before installing a hardwired charger or a new 240-volt circuit or receptacle for an... | Resolution 25-2009 Table 3-B: administrative charge $23.50 each |
| Fence Permit | It depends | height of a fence or freestanding masonry wall above grade, measured on the lowest side; open-style fences such as chain-link any height as determined by the building official | ...footage of the wall." Otherwise building permits are valuation-based: "$30.00 plus... |
| HVAC Permit | It depends | Before installing or replacing a furnace, air conditioner, heat pump, boiler... | Resolution 25-2009 Table 3-C Mechanical Permit Fees: administrative charge $23.50 each |
| Patio Permit | Permit required | Any size | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Plumbing Permit | It depends | Before installing, altering or relocating plumbing or gas piping, fixtures, sewer or... | Resolution 25-2009 Table 3-D Plumbing Permit Fees: administrative charge $23.50 each |
| Pool Permit | It depends | prefabricated pool accessory to a Group R-3 dwelling, installed entirely above ground, capacity not over 5,000 gallons | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Roof Replacement Permit | Permit required | Any size | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Shed Permit | It depends | one-story detached accessory building used as a tool or storage shed, playhouse or similar use | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Solar Permit | Permit required | Any size | ...building permit (BRSP), valuation-based under Resolution 25-2009 Table 3-A ("$30.00... |
| Water Heater Permit | Permit required | Any size | Plumbing (Table 3-D) and mechanical (Table 3-C) each carry a $23.50 administrative charge |
Bathroom Remodel Permit in other New Mexico localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Bernalillo County documents; the office above sets the local rules.
How this bathroom remodel permit page for Bernalillo County was verified. 2 official sources: bernco.gov, bernco.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Bernalillo County Planning & Development Services, Building Section. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Bathroom Remodel Permit requirements across New Mexico localities