New Mexico / Bernalillo County
Water Heater Permit in Bernalillo County, New Mexico
Permit required
Yes, a permit is required
Before installing or replacing a water heater, gas or electric.
Issued byBernalillo County Planning & Development Services, Building Section
By Mario Bailey, verified against official sources
Quick answer
Bernalillo County names installing a water heater without a permit as a common plumbing/mechanical violation and says it is unlawful to perform any plumbing installation or alteration without first obtaining a plumbing permit. The ordinance's plumbing exemptions do not cover replacing fixtures or equipment. Gas water heaters also involve gas piping and venting, which a homeowner plumbing test does not allow, so a licensed contractor handles those.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Plumbers usually pull this permit as part of the replacement. If yours failed and you are choosing a plumber under time pressure, comparing a couple of quotes still pays.
Compare plumber quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before installing or replacing a water heater, gas or electric.
What a water heater permit costs in Bernalillo County
How to apply in Bernalillo County
In Bernalillo County, replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size.
What most water heater permit applications include:
- For Bernalillo County, a permit must be obtained before an owner or contractor installs, alters, or replaces any plumbing, fuel gas, or electrical system regulated by the code, which covers putting in a new water heater (IRC R105.1).
- Water heater replacement is not on the code's short list of exempt plumbing work, and replacing defective piping with new material is expressly defined as new work that needs a permit and inspection (IRC R105.2).
- For Bernalillo County, the application itself only has to identify and describe the work and describe the location of the building or work, which is why most offices can process a water heater permit as a short form rather than a full plan set (IRC R105.3).
- Once a complete application is on file, the building official must act on it and issue the permit as soon as practicable if the proposed work conforms to code, which is the basis for the same-day or next-business-day turnaround many permit offices offer for a straight swap (IRC R105.3.1).
- For Bernalillo County, the permit only stays valid if the work starts within the code's default window before it lapses, so scheduling the replacement and its inspection soon after the permit issues matters (IRC R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1, Section R105 (Permits). Source. Bernalillo County Planning & Development Services, Building Section sets the exact checklist for Bernalillo County.
Where to apply in Bernalillo County:
Bernalillo County Planning & Development Services, Building Section
- 415 Silver Ave. SW, 2nd Floor, Albuquerque, NM 87102
- Phone: (505) 314-0350
- Email: permits@bernco.gov
Water Heater Permit in Bernalillo County compared with nearby New Mexico localities
| Locality | Permit needed? | Threshold | What each New Mexico schedule says | Verified |
|---|---|---|---|---|
| Bernalillo County | Permit required | Any size | Plumbing (Table 3-D) and mechanical (Table 3-C) each carry a $23.50 administrative charge | |
| Albuquerque | Permit required | Any size | Plumbing/mechanical permit with the $47.00 administrative charge (Tables 112-C and 112-D) |
Inspections and closing out your permit
In Bernalillo County, a water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.
- In Bernalillo County: the lifecycle has one required visit, the final inspection, made after the permitted work is complete and before the water heater goes into service; because a straight swap conceals nothing behind framing, offices typically do not schedule a separate rough-in visit for it (IRC R109.1.6).
- In Bernalillo County: the inspector confirms the water heater is protected by either a separate pressure relief valve and temperature relief valve, or one combination valve rated for the appliance (IRC P2804.1).
- In Bernalillo County: the relief valve's discharge pipe is checked for an unobstructed, un-trapped gravity path that ends through an air gap no more than 6 inches above the floor or pan, since a wrong discharge pipe is one of the most common reasons a water heater fails inspection (IRC P2804.6.1).
- In Bernalillo County: where the water heater feeds a closed system, for instance behind a backflow preventer or check valve, the inspector looks for a thermal expansion control device sized to absorb the resulting pressure increase (IRC P2903.4.2).
- In Bernalillo County: on a gas-fired unit, the inspector verifies the space provides enough combustion air, sized at 50 cubic feet per 1,000 Btu per hour of the appliance's input rating unless an engineered alternative method is used (IRC G2407.5.1).
- In Bernalillo County: the gas unit's vent must tie into an approved venting system, which the inspector checks along with the vent's physical connections and support (IRC G2427.1, G2427.2).
- In Bernalillo County: where site conditions call for them, the inspector also checks for a drain pan under a tank whose leakage would cause damage, and for seismic strapping in the upper and lower thirds of the tank in the seismic design categories and townhouse conditions where the code requires it (IRC P2801.6; P2801.8).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Bernalillo County permit portal or by phone at (505) 314-0350.
Inspection sequence from 2021 International Residential Code (IRC), Chapters 24, 28, and 29 (Fuel Gas; Water Heaters; Water Supply and Distribution). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Water Heater Permit checklist for Bernalillo County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing or replacing a water heater, gas or electric.
- Budget the fee. No water heater line item in Resolution 25-2009. Plumbing (Table 3-D) and mechanical (Table 3-C) each carry a $23.50 administrative charge; a gas outlet is $3.00 and mechanical "Each appliance, includes ducts and venting" is $7.00. Official fee schedule.
- Apply. In Bernalillo County, replacing a residential water heater needs a permit before work starts, because swapping the appliance counts as installing regulated plumbing and fuel gas work, not an exempt repair. The application itself stays light: it identifies the work and its location, and most offices only ask for extra fuel or capacity details when the replacement changes fuel type or input size. Start at the Bernalillo County permit portal.
- Keep the office details handy. Bernalillo County Planning & Development Services, Building Section. Phone: (505) 314-0350. Address: 415 Silver Ave. SW, 2nd Floor, Albuquerque, NM 87102.
- Plan for inspections. In Bernalillo County, a water heater swap normally draws one inspection, a final, since the work is exposed rather than buried behind new framing. That single visit confirms the relief valve and its discharge pipe, thermal expansion control and seismic strapping where the installation requires them, and, on gas units, adequate combustion air and an approved vent connection.
Compiled from the official sources on this page. Last checked .
Permitting activity in Bernalillo County
In 2025, Bernalillo County authorized permits for 1,560 new residential housing units (668 single-family, 892 in multi-family buildings), valued at $314M, up from 1,316 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 667,601.
Frequently asked questions
- Do you need a water heater permit in Bernalillo County?
- Bernalillo County names installing a water heater without a permit as a common plumbing/mechanical violation and says it is unlawful to perform any plumbing installation or alteration without first obtaining a plumbing permit. The ordinance's plumbing exemptions do not cover replacing fixtures or equipment. Gas water heaters also involve gas piping and venting, which a homeowner plumbing test does not allow, so a licensed contractor handles those. Always confirm with the Bernalillo County Planning & Development Services, Building Section before starting.
- How much does a water heater permit cost in Bernalillo County?
- No water heater line item in Resolution 25-2009. Plumbing (Table 3-D) and mechanical (Table 3-C) each carry a $23.50 administrative charge; a gas outlet is $3.00 and mechanical "Each appliance, includes ducts and venting" is $7.00. See the official fee schedule for current amounts.
- How long does a water heater permit take in Bernalillo County?
- The county says it will make every effort to process trade permit submittals received by 3:00 p.m. on the same day (Apply for Trade Permits page). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a water heater permit in Bernalillo County?
- You can apply through the Bernalillo County permit portal or contact the Bernalillo County Planning & Development Services, Building Section directly. The links are listed on this page.
- Can a homeowner pull a water heater permit themselves in Bernalillo County?
- Under New Mexico law (NMSA 1978, 60-13-3(D)(10), (11); 14.5.2.8(B) NMAC; 14.5.2.18 NMAC): Yes, with tight limits. CILA exempts from the contractor definition an individual who, alone or with wage-paid help, builds or makes installations, alterations or repairs to a single-family dwelling he owns and occupies or will occupy (60-13-3(D)(10)), and a person building or improving a single-family residence for personal use (60-13-3(D)(11)). The work must still meet all state codes, and CID's homeowner permit (14.5.2.18 NMAC) applies only to the owner's primary residence and its garages, carports and sheds, never to rental, other owned or commercial property. The homeowner must perform the major portion of the work by dollar amount and file a signed, notarized responsibility sheet. A homeowner electrical permit requires passing a CID homeowner electrical exam (75% to pass), a plumbing permit requires a competency showing that may include a written exam, and no homeowner permit is issued for HVAC, natural gas or LP gas work. The project may not be put on the market while under construction (doing so voids the permit and can bring unlicensed contracting charges), and only one single-family homeowner permit may be issued to the same owner in any 12-month period. Confirm how Bernalillo County applies this before you apply.
From the Library
What else needs a permit in Bernalillo County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before moving or adding plumbing fixtures, adding circuits, or making structural changes | Building work is valuation-based under Resolution 25-2009 Table 3-A ("$30.00 plus $4.00... |
| Deck Permit | It depends | height of a platform above grade; also not over a basement or story below and not part of an accessible route | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Electrical Permit | It depends | Before adding or altering wiring, circuits, outlets, panels or services | Resolution 25-2009 Table 3-B Electrical Permit Fees: administrative charge $23.50 each |
| EV Charger Permit | It depends | Before installing a hardwired charger or a new 240-volt circuit or receptacle for an... | Resolution 25-2009 Table 3-B: administrative charge $23.50 each |
| Fence Permit | It depends | height of a fence or freestanding masonry wall above grade, measured on the lowest side; open-style fences such as chain-link any height as determined by the building official | ...footage of the wall." Otherwise building permits are valuation-based: "$30.00 plus... |
| HVAC Permit | It depends | Before installing or replacing a furnace, air conditioner, heat pump, boiler... | Resolution 25-2009 Table 3-C Mechanical Permit Fees: administrative charge $23.50 each |
| Patio Permit | Permit required | Any size | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Plumbing Permit | It depends | Before installing, altering or relocating plumbing or gas piping, fixtures, sewer or... | Resolution 25-2009 Table 3-D Plumbing Permit Fees: administrative charge $23.50 each |
| Pool Permit | It depends | prefabricated pool accessory to a Group R-3 dwelling, installed entirely above ground, capacity not over 5,000 gallons | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Roof Replacement Permit | Permit required | Any size | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Shed Permit | It depends | one-story detached accessory building used as a tool or storage shed, playhouse or similar use | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Solar Permit | Permit required | Any size | ...building permit (BRSP), valuation-based under Resolution 25-2009 Table 3-A ("$30.00... |
Water Heater Permit in other New Mexico localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Bernalillo County documents; the office above sets the local rules.
How this water heater permit page for Bernalillo County was verified. 2 official sources: bernco.gov, bernco.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Bernalillo County Planning & Development Services, Building Section. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Water Heater Permit requirements across New Mexico localities