New Mexico / Bernalillo County
Roof Replacement Permit in Bernalillo County, New Mexico
Permit required
Yes, a permit is required
Before re-roofing, re-covering or replacing a roof.
Issued byBernalillo County Planning & Development Services, Building Section
By Mario Bailey, verified against official sources
Quick answer
Bernalillo County requires a permit for re-roofing, recovering or replacing a roof in every zone, and publishes a dedicated Re-Roof Permit Application. Its chart treats only repairing shingles or corrugated metal as permit-free. Replacing concrete or clay tile over another covering requires an architect's or engineer's certification of the roof structure.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Roofers handle the permit in most localities when one is required. Comparing bids before you sign is the useful next step.
Compare roofing quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before re-roofing, re-covering or replacing a roof.
What a roof replacement permit costs in Bernalillo County
How to apply in Bernalillo County
In Bernalillo County, a residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.
What most roof replacement permit applications include:
- State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
- For Bernalillo County, a recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
- Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
- For Bernalillo County, the materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
- If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).
General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. Bernalillo County Planning & Development Services, Building Section sets the exact checklist for Bernalillo County.
Where to apply in Bernalillo County:
Bernalillo County Planning & Development Services, Building Section
- 415 Silver Ave. SW, 2nd Floor, Albuquerque, NM 87102
- Phone: (505) 314-0350
- Email: permits@bernco.gov
Roof Replacement Permit in Bernalillo County compared with nearby New Mexico localities
| Locality | Permit needed? | Threshold | What each New Mexico schedule says | Verified |
|---|---|---|---|---|
| Bernalillo County | Permit required | Any size | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... | |
| Albuquerque | Permit required | Any size | ...PERMIT FEES", "Residential (R-3 Occupancies Only)": Administrative Fee $30.00 +... |
Inspections and closing out your permit
In Bernalillo County, most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
- In Bernalillo County: where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
- In Bernalillo County: an overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
- In Bernalillo County: flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
- In Bernalillo County: a final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
- In Bernalillo County: in some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
- In Bernalillo County: reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Bernalillo County permit portal or by phone at (505) 314-0350.
Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Roof Replacement Permit checklist for Bernalillo County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before re-roofing, re-covering or replacing a roof.
- Budget the fee. Building permit fees are valuation-based under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00 plus $4.00 per $1,000.00 Valuation" Building Permit Fee plus "$30.00 plus $2.00 per $1,000.00 Valuation" Building Plan Review Fee. Official fee schedule.
- Apply. In Bernalillo County, a residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies. Start at the Bernalillo County permit portal.
- Keep the office details handy. Bernalillo County Planning & Development Services, Building Section. Phone: (505) 314-0350. Address: 415 Silver Ave. SW, 2nd Floor, Albuquerque, NM 87102.
- Plan for inspections. In Bernalillo County, most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
Compiled from the official sources on this page. Last checked .
Permitting activity in Bernalillo County
In 2025, Bernalillo County authorized permits for 1,560 new residential housing units (668 single-family, 892 in multi-family buildings), valued at $314M, up from 1,316 the year before. That works out to about 2.3 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 667,601.
Frequently asked questions
- Do you need a roof replacement permit in Bernalillo County?
- Bernalillo County requires a permit for re-roofing, recovering or replacing a roof in every zone, and publishes a dedicated Re-Roof Permit Application. Its chart treats only repairing shingles or corrugated metal as permit-free. Replacing concrete or clay tile over another covering requires an architect's or engineer's certification of the roof structure. Always confirm with the Bernalillo County Planning & Development Services, Building Section before starting.
- How much does a roof replacement permit cost in Bernalillo County?
- Building permit fees are valuation-based under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00 plus $4.00 per $1,000.00 Valuation" Building Permit Fee plus "$30.00 plus $2.00 per $1,000.00 Valuation" Building Plan Review Fee. See the official fee schedule for current amounts.
- How long does a roof replacement permit take in Bernalillo County?
- The general turn-around time for a residential building permit is five working days (Building Services FAQ). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a roof replacement permit in Bernalillo County?
- You can apply through the Bernalillo County permit portal or contact the Bernalillo County Planning & Development Services, Building Section directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Bernalillo County?
- Under New Mexico law (NMSA 1978, 60-13-3(D)(10), (11); 14.5.2.8(B) NMAC; 14.5.2.18 NMAC): Yes, with tight limits. CILA exempts from the contractor definition an individual who, alone or with wage-paid help, builds or makes installations, alterations or repairs to a single-family dwelling he owns and occupies or will occupy (60-13-3(D)(10)), and a person building or improving a single-family residence for personal use (60-13-3(D)(11)). The work must still meet all state codes, and CID's homeowner permit (14.5.2.18 NMAC) applies only to the owner's primary residence and its garages, carports and sheds, never to rental, other owned or commercial property. The homeowner must perform the major portion of the work by dollar amount and file a signed, notarized responsibility sheet. A homeowner electrical permit requires passing a CID homeowner electrical exam (75% to pass), a plumbing permit requires a competency showing that may include a written exam, and no homeowner permit is issued for HVAC, natural gas or LP gas work. The project may not be put on the market while under construction (doing so voids the permit and can bring unlicensed contracting charges), and only one single-family homeowner permit may be issued to the same owner in any 12-month period. Confirm how Bernalillo County applies this before you apply.
From the Library
What else needs a permit in Bernalillo County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Before moving or adding plumbing fixtures, adding circuits, or making structural changes | Building work is valuation-based under Resolution 25-2009 Table 3-A ("$30.00 plus $4.00... |
| Deck Permit | It depends | height of a platform above grade; also not over a basement or story below and not part of an accessible route | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Electrical Permit | It depends | Before adding or altering wiring, circuits, outlets, panels or services | Resolution 25-2009 Table 3-B Electrical Permit Fees: administrative charge $23.50 each |
| EV Charger Permit | It depends | Before installing a hardwired charger or a new 240-volt circuit or receptacle for an... | Resolution 25-2009 Table 3-B: administrative charge $23.50 each |
| Fence Permit | It depends | height of a fence or freestanding masonry wall above grade, measured on the lowest side; open-style fences such as chain-link any height as determined by the building official | ...footage of the wall." Otherwise building permits are valuation-based: "$30.00 plus... |
| HVAC Permit | It depends | Before installing or replacing a furnace, air conditioner, heat pump, boiler... | Resolution 25-2009 Table 3-C Mechanical Permit Fees: administrative charge $23.50 each |
| Patio Permit | Permit required | Any size | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Plumbing Permit | It depends | Before installing, altering or relocating plumbing or gas piping, fixtures, sewer or... | Resolution 25-2009 Table 3-D Plumbing Permit Fees: administrative charge $23.50 each |
| Pool Permit | It depends | prefabricated pool accessory to a Group R-3 dwelling, installed entirely above ground, capacity not over 5,000 gallons | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Shed Permit | It depends | one-story detached accessory building used as a tool or storage shed, playhouse or similar use | ...under Administrative Resolution 25-2009 (effective May 1, 2009), Table 3-A: "$30.00... |
| Solar Permit | Permit required | Any size | ...building permit (BRSP), valuation-based under Resolution 25-2009 Table 3-A ("$30.00... |
| Water Heater Permit | Permit required | Any size | Plumbing (Table 3-D) and mechanical (Table 3-C) each carry a $23.50 administrative charge |
Roof Replacement Permit in other New Mexico localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Bernalillo County documents; the office above sets the local rules.
How this roof replacement permit page for Bernalillo County was verified. 2 official sources: bernco.gov, bernco.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Bernalillo County Planning & Development Services, Building Section. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Roof Replacement Permit requirements across New Mexico localities