Mississippi / Jackson

Electrical Permit in Jackson, Mississippi

Permit required

Yes, a permit is required

Before adding, altering or replacing wiring, outlets, fixtures, panels or service equipment.

Quick answer

Jackson issues its own electrical permits through the Building Permits Division; there is no state electrical permit. A stand-alone Electrical Permit covers jobs such as meter changes, adding outlets or fixtures, panel repairs and temporary poles; electrical work inside a larger project is permitted with that project. Permits are issued to city-licensed master electricians, and owner-occupants may do their own work but still need the permit and inspections.

Issued by
City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Jackson

  • Jackson does not publish a current permit fee schedule online.
  • Sec. 26-2 says only that the adopted schedule of fees governs;
  • the 2020 permit fee schedule pages on the city's former website are no longer online.
  • Fees are assessed in the OpenGov portal after review.

How to apply in Jackson

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division

  • Warren Hood Building, 200 S. President St, 3rd floor, Jackson, MS 39201
  • Phone: 601-960-1160

What else needs a permit in Jackson

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

Jackson does not publish a current permit fee schedule online, for every permit type below. The fee column shows what differs by project.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsBefore replacing or moving bathroom fixtures, adding or changing circuits, or altering...See schedule
Deck PermitIt dependsdeck floor area; the exemption also requires a deck not more than 30 inches above grade at any point, not attached to the dwelling, and not serving the required exit doorSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools only; site-built pools, spas and hot tubs need a permit at any depthSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a portable storage building; a permanent foundation or electrical, plumbing or gas work requires a permit at any sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an electrical permit in Jackson?
Yes, before adding, altering or replacing wiring, outlets, fixtures, panels or service equipment. If you are unsure how that applies to your project, call the permit office at 601-960-1160 before you start.
How much does an electrical permit cost in Jackson?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the permit office at 601-960-1160.
Where do you apply for an electrical permit in Jackson?
You can apply through the Jackson permit portal or contact the City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Jackson?
Under Mississippi law (Miss. Code Ann. 73-59-15(1)(b), (1)(c), (2); 73-59-17; 73-59-18): Mississippi's residential builder and remodeler licensing law does not apply to a person who builds or improves his own residence, or who acts as his own general contractor on his own residence (Miss. Code 73-59-15(1)(b)). The exemption also covers work for a close relative's home that will not be sold or rented (73-59-15(1)(c)). It is limited to one house a year: an owner using it may not apply for more than one permit to build a single residence, or build more than one, within one year, and doing so creates a rebuttable presumption that the house is being built for sale or rent (73-59-15(2)). The local building official must still see evidence that you are either licensed or exempt before issuing a permit (73-59-17), and the exemption does not excuse the permit itself, which state law requires every city and county to make a condition of construction. Confirm how Jackson applies this before you apply.

From the Library

Everything above, sourced

How this electrical permit page for Jackson was verified. 1 official source: jacksonms.gov. Last checked by Mario Bailey, not confirmed with City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project