Mississippi / Jackson

Solar Permit in Jackson, Mississippi

Permit required

Yes, a permit is required

Before installing a solar photovoltaic system.

Quick answer

Jackson publishes no solar-specific page, but its ordinance requires a permit before anyone installs or alters any electrical system regulated by the adopted codes, and a rooftop or ground-mounted solar system is electrical work. Expect an electrical permit, pulled by a city-licensed master electrician, and a residential building permit for the structural mounting.

Issued by
City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division
From an official source Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Mississippi State Board of Contractors license active, and under which business name? Verify it on search.msboc.us.

Mississippi's owner-builder rule (Miss. Code Ann. 73-59-15(1)(b), (1)(c), (2); 73-59-17; 73-59-18) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Jackson

  • Jackson does not publish a current permit fee schedule online.
  • Sec. 26-2 says only that the adopted schedule of fees governs;
  • the 2020 permit fee schedule pages on the city's former website are no longer online.
  • Fees are assessed in the OpenGov portal after review.

How to apply in Jackson

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division

  • Warren Hood Building, 200 S. President St, 3rd floor, Jackson, MS 39201
  • Phone: 601-960-1160

What else needs a permit in Jackson

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

Jackson does not publish a current permit fee schedule online, for every permit type below. The fee column shows what differs by project.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsBefore replacing or moving bathroom fixtures, adding or changing circuits, or altering...See schedule
Deck PermitIt dependsdeck floor area; the exemption also requires a deck not more than 30 inches above grade at any point, not attached to the dwelling, and not serving the required exit doorSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools only; site-built pools, spas and hot tubs need a permit at any depthSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a portable storage building; a permanent foundation or electrical, plumbing or gas work requires a permit at any sizeSee schedule
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a solar permit in Jackson?
Yes, before installing a solar photovoltaic system. If you are unsure how that applies to your project, call the permit office at 601-960-1160 before you start.
How much does a solar permit cost in Jackson?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the permit office at 601-960-1160.
Where do you apply for a solar permit in Jackson?
You can apply through the Jackson permit portal or contact the City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Jackson?
Under Mississippi law (Miss. Code Ann. 73-59-15(1)(b), (1)(c), (2); 73-59-17; 73-59-18): Mississippi's residential builder and remodeler licensing law does not apply to a person who builds or improves his own residence, or who acts as his own general contractor on his own residence (Miss. Code 73-59-15(1)(b)). The exemption also covers work for a close relative's home that will not be sold or rented (73-59-15(1)(c)). It is limited to one house a year: an owner using it may not apply for more than one permit to build a single residence, or build more than one, within one year, and doing so creates a rebuttable presumption that the house is being built for sale or rent (73-59-15(2)). The local building official must still see evidence that you are either licensed or exempt before issuing a permit (73-59-17), and the exemption does not excuse the permit itself, which state law requires every city and county to make a condition of construction. Confirm how Jackson applies this before you apply.

From the Library

Everything above, sourced

How this solar permit page for Jackson was verified. 2 official sources: jacksonms.gov, library.municode.com. Last checked by Mario Bailey, not confirmed with City of Jackson Department of Planning and Development, Office of Code Services, Building Permits Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project