Florida / St. Johns County

Electrical Permit in St. Johns County, Florida

Permit required

Yes, a permit is required

Before installing, altering, or replacing an electrical system in unincorporated St. Johns County

Confirmed on official page Verified

Issued byBuilding Services Division, Growth Management Department

By Mario Bailey, verified against official sources

Quick answer

St. Johns County's general permitting rule explicitly names electrical systems among the work requiring a permit before installation, alteration, or repair, backed by a dedicated Electrical Permit Fees section in the county's fee schedule. This applies to unincorporated St. Johns County; St. Augustine and St. Augustine Beach have their own building departments and separate electrical permitting.

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before installing, altering, or replacing an electrical system in unincorporated St. Johns County

What an electrical permit costs in St. Johns County

Line item
electrical permitBy formulaElectrical Permit Fees (F.S. 553-80): Permit Issuance Fee $11.00, plus itemized charges such as Simple Permanent Service or Feeder Panel $24.00, Construction Temporary Service $24.00, and Service Change/Increase Amps $19.00 (plus $42.00 if over 800 amps), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026).
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How St. Johns County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredAny size
Clay CountyPermit requiredAny size
Collier CountyPermit requiredPermits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices.
St. Johns Countythis pagePermit requiredAny size

How to apply in St. Johns County

In St. Johns County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • For St. Johns County, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • For St. Johns County, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Building Services Division, Growth Management Department sets the exact checklist for St. Johns County.

Where to apply in St. Johns County:

Building Services Division, Growth Management Department

  • 4040 Lewis Speedway, St. Augustine, FL 32084
  • Phone: 904-827-6800
  • Email: bldcodes@sjcfl.us

Electrical Permit in St. Johns County compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
St. Johns CountyPermit requiredAny sizeElectrical Permit Fees (F.S. 553-80): Permit Issuance Fee $11.00, plus itemized charges...
Alachua CountyPermit requiredAny sizeNo electrical-specific flat fee is published
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring....Electrical Permit Application fee table lists a Building Code Review fee of $75.00...
Broward CountyPermit requiredAny sizeElectrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per...
Charlotte CountyPermit requiredAny sizeAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation...

Inspections and closing out your permit

In St. Johns County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. In St. Johns County: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. In St. Johns County: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. In St. Johns County: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. In St. Johns County: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. In St. Johns County: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. In St. Johns County: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. In St. Johns County: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the St. Johns County permit portal or by phone at 904-827-6800.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in St. Johns County?
St. Johns County's general permitting rule explicitly names electrical systems among the work requiring a permit before installation, alteration, or repair, backed by a dedicated Electrical Permit Fees section in the county's fee schedule. This applies to unincorporated St. Johns County; St. Augustine and St. Augustine Beach have their own building departments and separate electrical permitting. Always confirm with the Building Services Division, Growth Management Department before starting.
How much does an electrical permit cost in St. Johns County?
Electrical Permit Fees (F.S. 553-80): Permit Issuance Fee $11.00, plus itemized charges such as Simple Permanent Service or Feeder Panel $24.00, Construction Temporary Service $24.00, and Service Change/Increase Amps $19.00 (plus $42.00 if over 800 amps), per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 07/21/2026). See the official fee schedule for current amounts.
Where do you apply for an electrical permit in St. Johns County?
You can apply through the St. Johns County permit portal or contact the Building Services Division, Growth Management Department directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in St. Johns County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how St. Johns County applies this before you apply.

From the Library

What else needs a permit in St. Johns County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny size...fall under the general Building Services Fees table: Permit Issuance Fee $14.00...
Fence PermitPermit requiredAny size...fall under the general Building Services Fees table: Permit Issuance Fee $14.00...
HVAC PermitPermit requiredAny sizeMechanical Permit Fees (F.S. 553.80): Permit Issuance $11.00 with a minimum permit fee...
Patio PermitPermit requiredAny size...fall under the general Building Services Fees table: Permit Issuance Fee $14.00...
Plumbing PermitPermit requiredAny sizePlumbing Permit Fees (F.S. 553-80): Permit Issuance Fee $11.00 with a minimum permit fee...
Pool PermitPermit requiredpool surface area per the LDC regulated-pool definition, which also uses a 2 foot depth testSwimming Pool Fees (F.S. 553-80): Permit Issuance $11.00
Roof Replacement PermitPermit requiredAny size...fall under the general Building Services Fees table: Permit Issuance Fee $14.00...
Shed PermitPermit requiredAny size...fall under the general Building Services Fees table: Permit Issuance Fee $14.00...
Solar PermitPermit requiredAny sizeSolar Permit Fees (F.S. 553.80): Permit Issuance $11.00 with a minimum permit fee of...

Electrical Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not St. Johns County documents; the office above sets the local rules.

How this electrical permit page for St. Johns County was verified. 2 official sources: sjcfl.us, sjcfl.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Services Division, Growth Management Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Electrical Permit requirements across Florida localities

Electrical permit rules nationwide

Look up an existing St. Johns County permit record