Florida / St. Johns County

HVAC Permit in St. Johns County, Florida

Permit required

Yes, a permit is required

Before installing, altering, or replacing a furnace, boiler, heater, or air conditioning system in unincorporated St. Johns County

Quick answer

St. Johns County's own Building Permit Application states that a separate permit must be secured for furnaces, boilers, heaters, tanks, and air conditioners, and the county's fee schedule carries a dedicated Mechanical Permit Fees section priced by system valuation. This applies to unincorporated St. Johns County; St. Augustine and St. Augustine Beach operate their own building departments. No county-published exemption for small, portable, or window-unit air conditioners was found.

Issued by
Building Services Division, Growth Management Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an HVAC permit costs in St. Johns County

Fee basis
Project valuation
Fee schedule in force
Official scheduleRead .
  • Mechanical Permit Fees (F.S. 553.80): Permit Issuance $16.00 with a minimum permit fee of $50.00;
  • valuation $0 to $5,000: $34.00;
  • $5,001 and above: $27.00 plus $2.00 for each additional $1,000, per St. Johns County's Schedule of Fees and Services, Exhibit A (amended 09/15/2026).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How St. Johns County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredFlat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025
Brevard CountyPermit requiredSee schedule
Broward CountyPermit requiredMechanical (air conditioning and ventilation) permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest
Charlotte CountyPermit requiredAt application: $90 flat building fee unless valuation is $50,000 or more (then 0.004 x ICC valuation), plus a 0.025 x building-fee surcharge
Clay CountyPermit requiredMechanical Permits (commercial and residential): minimum fee $50.00
Collier CountyPermit requiredSee schedule
St. Johns Countythis pagePermit requiredMechanical Permit Fees (F.S. 553.80): Permit Issuance $16.00 with a minimum permit fee of $50.00

How to apply in St. Johns County

General guide, not specific to this office

What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Building Services Division, Growth Management Department

  • 4040 Lewis Speedway, St. Augustine, FL 32084
  • Phone: 904-827-6800
  • Email: bldcodes@sjcfl.us

Permitting activity in St. Johns County

In 2025, St. Johns County authorized permits for 4,735 new residential housing units (3,554 single-family, 1,181 in multi-family buildings), valued at $1.2B, down from 5,575 the year before. That works out to about 13.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 346,328.

What else needs a permit in St. Johns County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeDeck permits fall under the general Building Services Fees table: Permit Issuance Fees $20.00; the schedule has the rest
Electrical PermitPermit requiredAny sizeElectrical Permit Fees (F.S. 553-80): Permit Issuance Fee $16.00; the schedule has the rest
Fence PermitPermit requiredAny sizeFence permits fall under the general Building Services Fees table: Permit Issuance Fees $20.00; the schedule has the rest
Patio PermitPermit requiredAny sizePatio permits fall under the general Building Services Fees table: Permit Issuance Fees $20.00; the schedule has the rest
Plumbing PermitPermit requiredAny sizePlumbing Permit Fees (F.S. 553-80): Permit Issuance Fee $16.00 with a minimum permit fee of $50.00, plus $6.00 for each plumbing fixture, floor drain, or trap
Pool PermitPermit requiredpool surface area per the LDC regulated-pool definition, which also uses a 2 foot depth testSwimming Pool Fees (F.S. 553-80): Permit Issuance $16.00
Roof Replacement PermitPermit requiredAny sizeRoof replacement permits fall under the general Building Services Fees table: Permit Issuance Fees $20.00; the schedule has the rest
Shed PermitPermit requiredAny sizeShed permits fall under the general Building Services Fees table: Permit Issuance Fees $20.00; the schedule has the rest
Solar PermitPermit requiredAny sizeSolar Permit Fees (F.S. 553.80): Permit Issuance $16.00 with a minimum permit fee of $50.00

Frequently asked questions

Do you need an HVAC permit in St. Johns County?
Yes, before installing, altering, or replacing a furnace, boiler, heater, or air conditioning system in unincorporated St. Johns County. If you are unsure how that applies to your project, call the Building Services Division, Growth Management Department at 904-827-6800 before you start.
How much does an HVAC permit cost in St. Johns County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the Building Services Division, Growth Management Department at 904-827-6800.
Where do you apply for an HVAC permit in St. Johns County?
You can apply through the St. Johns County permit portal or contact the Building Services Division, Growth Management Department directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in St. Johns County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how St. Johns County applies this before you apply.

From the Library

HVAC Permit in other Florida localities

Everything above, sourced

How this HVAC permit page for St. Johns County was verified. 2 official sources: sjcfl.us, sjcfl.us; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Services Division, Growth Management Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project