Tennessee / Memphis

Electrical Permit in Memphis, Tennessee

Permit required

Yes, a permit is required

Before any residential electrical installation, alteration, repair, removal, conversion or replacement

Quick answer

Electrical permits in Memphis come from the local joint building department, not from the state. This is the opposite of the arrangement in unincorporated Williamson County, where electrical permits are issued by the Tennessee Department of Commerce and Insurance through the CORE system; Memphis and Shelby County adopted their own 2020 Memphis and Shelby County Electrical Code, based on the 2020 National Electrical Code with local amendments, and the Office of Construction Code Enforcement issues and inspects the permits itself. A permit is required for essentially all residential electrical work, with only three narrow exemptions. Permits are issued to licensed or registered contractors, with a homeowner exception that requires proof the house is the applicant's principal residence and a score of at least 70 percent on an examination approved by the Electrical Code Board.

Issued by
Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Memphis

Fee schedule in force
Official scheduleRead .
  • E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00, E-6.2 EXISTING RESIDENTIAL 1&2 FAMILY OCCUPANCIES $30.00 for 1 to 5 circuits and $45.00 for over 5 circuits providing 2 inspections, E6.3 service, feeder, or panel replacement $50.00, E6.4 in ground residential swimming pool $100.00, E6.5 residential low voltage $30.00, per the 2022 Fee Schedule, Electrical Permit and Inspection Fees Schedule.
  • Work commencing before permit issuance is charged double fee.
  • All fees exclude an administrative charge of $4.00 and a residential surcharge of $1.00, so $5.00 is added to the residential total, per the 2022 Fee Schedule.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Memphis compares in Tennessee

No Tennessee jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Memphisthis pagePermit requiredE-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00; the schedule has the rest
NashvillePermit requiredItemized charges for circuits, panels, services and appliances, with a $75 minimum fee per permit; the schedule has the rest
Williamson CountyPermit requiredState-issued via the TN CORE system: the issuing agent may charge up to $5.00 for the permit, plus inspection fees capped by state rule 0780-02-01-.21

How to apply in Memphis

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement)

What else needs a permit in Memphis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt depends200 square feet of deck area, taken with a 30 inch height above grade at any point, no attachment to the dwelling and no service to the exit door required by Section R311.4See schedule
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeM-0 fee issuance cost per permit $20.00; the schedule has the rest
Plumbing PermitIt dependswhether the work only stops a leak or clears a stoppage without replacing, rearranging or removing pipe, valve or fixture componentsPermit issuance $20.00, plus $4.00 for issuing each permit (data processing) and a $1.00 residential surcharge; the schedule has the rest
Pool PermitIt dependsprefabricated swimming pools, measured by the depth of the poolPOOL OR RETAINING WALL $5.00/1,000 (NO MAX) with a $70.00 minimum, per the 2022 Fee Schedule, Building Section, Residential Fees; the schedule has the rest
Roof Replacement PermitIt dependswhether decking, structural members or equipment supports are modifiedSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeResidential photovoltaic work is billed on the electrical schedule: E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00; the schedule has the rest

Frequently asked questions

Do you need an electrical permit in Memphis?
Yes, before any residential electrical installation, alteration, repair, removal, conversion or replacement. If you are unsure how that applies to your project, call the permit office at 901-222-8300 before you start.
How much does an electrical permit cost in Memphis?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 901-222-8300.
Where do you apply for an electrical permit in Memphis?
You can apply through the Memphis permit portal or contact the Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Memphis?
Under Tennessee law (T.C.A. 62-6-103; Tenn. Comp. R. & Regs. 0780-02-23-.01(1)(i), -.05(3), -.05(4)(b)2.; Tenn. Comp. R. & Regs. 0780-02-01-.05(2)(a)): Tennessee lets a homeowner act as their own builder. Under T.C.A. 62-6-103, as the State Fire Marshal's Office explains it, an owner may construct a single residence once every two years for personal use without a contractor's license, so long as the home is not for resale, lease, or rent, and anyone the homeowner hires whose portion of the work is $25,000 or more must be a licensed contractor. In state permit areas the owner pulls a property owner's permit, limited by rule to one per 24 month period, and the work is subject to the same inspections and fees as a contractor's job; proof of licensure is waived at permit purchase only when the owner personally performs the work. For electrical work, a homeowner may wire their own residence only after obtaining a residential property owner's electrical permit, which covers only the applicant and immediate family, does not authorize help from anyone unlicensed, and is limited to one per 12 month period unless the owner lost the home to fire or windstorm. Confirm how Memphis applies this before you apply.

From the Library

Electrical Permit in other Tennessee localities

Everything above, sourced

How this electrical permit page for Memphis was verified. 2 official sources: develop901.com, shelbycountytn.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement). Rules change; confirm before you build. How we verify.