Tennessee / Memphis

Plumbing Permit in Memphis, Tennessee

It depends

Sometimes, depending on the project

For new plumbing work and for any repair that requires replacing pipe or fixtures, rearranging them, or removing cover plates or access ways

Quick answer

Residential plumbing work in Memphis needs a permit from the Memphis and Shelby County Office of Construction Code Enforcement, but the 2022 Joint Plumbing Code carries two genuine exemptions a homeowner can meet: stopping a leak, and clearing a stoppage or repairing a leak where nothing has to be replaced, rearranged or opened up. The code draws the line explicitly, saying that if a concealed trap, drainpipe, water, soil, waste or vent pipe becomes defective and has to be removed and replaced with new material, that is new work and a permit is required. There is also an emergency exception: where plumbing or repairs must be performed in an emergency situation, the permit application is submitted within the next working business day. Apply through the Develop 901 Citizen Portal under Residential Plumbing Permit.

Typical threshold
whether the work only stops a leak or clears a stoppage without replacing, rearranging or removing pipe, valve or fixture components
Issued by
Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Plumbing permits are usually pulled by the plumber doing the job. If you are still choosing one, compare a few quotes first.

Compare plumber quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a plumbing permit costs in Memphis

Fee schedule in force
Official scheduleRead .

Permit issuance $20.00, plus $4.00 for issuing each permit (data processing) and a $1.00 residential surcharge, then unit fees of $7.50 for each plumbing fixture or trap or set of fixtures on one trap including water and drainage piping, $7.50 for each electric water heater, $30.00 for a residential sewer connection and $30.00 for a residential sewer repair or replacement, $20.00 for a 1 inch water service and $30.00 for 1-1/4 inch through 2 inch, per the 2022 Fee Schedule, Plumbing Permit and Inspection Fees Schedule.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Memphis compares in Tennessee

JurisdictionPermit needed?Threshold
Memphisthis pageIt dependswhether the work only stops a leak or clears a stoppage without replacing, rearranging or removing pipe, valve or fixture components
NashvillePermit requiredAny size
Williamson CountyIt dependsthe county says additional plumbing fixtures such as a new bathroom will likely require a permit and that replacing plumbing fixtures could require one; it publishes no list of exempt plumbing work

How to apply in Memphis

General guide, not specific to this office

What a plumbing permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a plumbing permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement)

What else needs a permit in Memphis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt depends200 square feet of deck area, taken with a 30 inch height above grade at any point, no attachment to the dwelling and no service to the exit door required by Section R311.4See schedule
Electrical PermitPermit requiredAny sizeE-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00; the schedule has the rest
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeM-0 fee issuance cost per permit $20.00; the schedule has the rest
Pool PermitIt dependsprefabricated swimming pools, measured by the depth of the poolPOOL OR RETAINING WALL $5.00/1,000 (NO MAX) with a $70.00 minimum, per the 2022 Fee Schedule, Building Section, Residential Fees; the schedule has the rest
Roof Replacement PermitIt dependswhether decking, structural members or equipment supports are modifiedSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeResidential photovoltaic work is billed on the electrical schedule: E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00; the schedule has the rest

Frequently asked questions

Do you need a plumbing permit in Memphis?
It depends on the project. Whether the work only stops a leak or clears a stoppage without replacing, rearranging or removing pipe, valve or fixture components. If you are unsure how that applies to your project, call the permit office at 901-222-8300 before you start.
How much does a plumbing permit cost in Memphis?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 901-222-8300.
Where do you apply for a plumbing permit in Memphis?
You can apply through the Memphis permit portal or contact the Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement) directly. The links are listed on this page.
Can a homeowner pull a plumbing permit themselves in Memphis?
Under Tennessee law (T.C.A. 62-6-103; Tenn. Comp. R. & Regs. 0780-02-23-.01(1)(i), -.05(3), -.05(4)(b)2.; Tenn. Comp. R. & Regs. 0780-02-01-.05(2)(a)): Tennessee lets a homeowner act as their own builder. Under T.C.A. 62-6-103, as the State Fire Marshal's Office explains it, an owner may construct a single residence once every two years for personal use without a contractor's license, so long as the home is not for resale, lease, or rent, and anyone the homeowner hires whose portion of the work is $25,000 or more must be a licensed contractor. In state permit areas the owner pulls a property owner's permit, limited by rule to one per 24 month period, and the work is subject to the same inspections and fees as a contractor's job; proof of licensure is waived at permit purchase only when the owner personally performs the work. For electrical work, a homeowner may wire their own residence only after obtaining a residential property owner's electrical permit, which covers only the applicant and immediate family, does not authorize help from anyone unlicensed, and is limited to one per 12 month period unless the owner lost the home to fire or windstorm. Confirm how Memphis applies this before you apply.

From the Library

Plumbing Permit in other Tennessee localities

Everything above, sourced

How this plumbing permit page for Memphis was verified. 2 official sources: develop901.com, shelbycountytn.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project