Tennessee / Nashville

Plumbing Permit in Nashville, Tennessee

By Mario Bailey Last checked 2026-06-18 · 2 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

A plumbing trade permit is required for residential plumbing work in Nashville. Licensed contractors apply through the ePermits system. Contact Gary Hall at the Codes department for plumbing permit questions.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Nashville, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For all residential plumbing work

What plumbing permit costs in Nashville

Flat minimum of $75 per permit plus $11 per plumbing fixture, per Metro Code 16.12.220 in the Codes fee schedule (Dec 2025).

Official fee schedule

How Nashville compares in Tennessee

No Tennessee jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Nashvillethis pagePermit requiredFlat minimum of $75 per permit plus $11 per plumbing fixture, per Metro Code...
Williamson CountyPermit requiredPlumbing Permit Fee Schedule: $10.00 for issuing each permit, plus $5.00 for...

How to apply in Nashville

You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.

What most plumbing permit applications include:

  • A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
  • The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
  • Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
  • Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
  • Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).

General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Metro Nashville Codes and Building Safety Department sets the exact checklist for Nashville.

Where to apply in Nashville:

Metro Nashville Codes and Building Safety Department

Inspections and closing out your permit

Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.

  1. Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
  2. Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
  3. Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
  4. The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
  5. The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
  6. At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
  7. Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Nashville permit portal or by phone at 615-862-6500.

Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Nashville

In 2024, Nashville authorized permits for 6,799 new residential housing units (2,662 single-family, 4,137 in multi-family buildings), valued at $1.2B, down from11,158 the year before. That works out to about 10.1 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2024 annual data · population 671,295.

About Nashville

Nashville has about 333,074 housing units. The median home is valued at $383,100, against a median household income of $75,197. About 53% of homes are owner-occupied, and the typical home was built around 1985.

Source: U.S. Census Bureau, American Community Survey 2023 5-year.

Frequently asked questions

Do you need a plumbing permit in Nashville?
A plumbing trade permit is required for residential plumbing work in Nashville. Licensed contractors apply through the ePermits system. Contact Gary Hall at the Codes department for plumbing permit questions. Always confirm with the Metro Nashville Codes and Building Safety Department before starting.
How much does a plumbing permit cost in Nashville?
Flat minimum of $75 per permit plus $11 per plumbing fixture, per Metro Code 16.12.220 in the Codes fee schedule (Dec 2025). See the official fee schedule for current amounts.
Where do you apply for a plumbing permit in Nashville?
You can apply through the Nashville permit portal or contact the Metro Nashville Codes and Building Safety Department directly. The links are listed on this page.

From the Library

What else needs a permit in Nashville

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedBilled as a residential building permit at $5 per $1,000 of total valuation plus a $25...
Electrical PermitPermit requiredNot specifiedFlat minimum of $75 per permit with itemized add-on charges for circuits, panels, servi...
Fence PermitNo permit neededNot specifiedNo permit fee;
HVAC PermitPermit requiredNot specifiedFlat minimum of $75 per gas/mechanical permit plus $32 per 100,000 Btuh or fraction for...
Patio PermitPermit requiredNot specifiedUses the same residential building permit rate as decks, $5 per $1,000 of valuation plu...
Pool PermitPermit requiredNot specifiedBilled as a residential building permit at $5 per $1,000 of valuation plus a $25 zoning...
Roof Replacement PermitNo permit neededNot specifiedRoof work beyond normal maintenance (repairs over 33 percent of roof area) is billed as...
Shed PermitIt dependsaccessory structures 100 sq ft or larger require a permit; structures under 100 sq ft may not require a permitSheds of 100 sq ft or more are billed as a residential building permit at $5 per $1,000...
Solar PermitPermit requiredNot specified$75 minimum permit fee

Plumbing Permit in other Tennessee localities

Official sources

Verified by a person against the sources above on 2026-06-18, not confirmed with Metro Nashville Codes and Building Safety Department. Rules change; confirm before you build. How we verify.

Last checked: 2026-06-18Report an error on this page

Compare Plumbing Permit requirements across Tennessee localities