Tennessee / Memphis

Pool Permit in Memphis, Tennessee

It depends

Sometimes, depending on the project

For any in ground pool, and for any prefabricated pool 24 inches deep or more

Quick answer

Only one pool is exempt in Memphis: a prefabricated swimming pool less than 24 inches deep. Everything else, including any in ground pool, needs a building permit from the Memphis and Shelby County Office of Construction Code Enforcement, and an in ground residential pool also carries its own $100.00 electrical permit line covering two inspections. The locally amended residential code adds a full Section R327 covering pool design, flood hazard areas and barrier requirements, including a barrier at least 48 inches above grade. Pools are exempt from the residential plan review fee.

Typical threshold
prefabricated swimming pools, measured by the depth of the pool
Issued by
Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Memphis

Fee schedule in force
Official scheduleRead .
  • POOL OR RETAINING WALL $5.00/1,000 (NO MAX) with a $70.00 minimum, per the 2022 Fee Schedule, Building Section, Residential Fees, plus the separate electrical line E6.4 IN GROUND RESIDENTIAL SWIMMING POOL $100.00, which provides 2 inspections.
  • Construction Enforcement states the residential plan review fee does not apply to pools.
  • All fees exclude an administrative charge of $4.00 and a residential surcharge of $1.00, so $5.00 is added to the residential total, per the 2022 Fee Schedule.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Memphis compares in Tennessee

JurisdictionPermit needed?Threshold
Memphisthis pageIt dependsprefabricated swimming pools, measured by the depth of the pool
NashvillePermit requiredAny size
Williamson CountyIt dependsSwimming pools designed or able to hold water more than 30 inches deep in unincorporated Williamson County require a building permit; pools designed to hold 30 inches of water or less, temporary pools, above-ground pools with no permanent filter system or decking, and pools not left up year-round are exempt from the permit requirement.

How to apply in Memphis

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement)

What else needs a permit in Memphis

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt depends200 square feet of deck area, taken with a 30 inch height above grade at any point, no attachment to the dwelling and no service to the exit door required by Section R311.4See schedule
Electrical PermitPermit requiredAny sizeE-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00; the schedule has the rest
Fence PermitPermit requiredAny sizeSee schedule
HVAC PermitPermit requiredAny sizeM-0 fee issuance cost per permit $20.00; the schedule has the rest
Plumbing PermitIt dependswhether the work only stops a leak or clears a stoppage without replacing, rearranging or removing pipe, valve or fixture componentsPermit issuance $20.00, plus $4.00 for issuing each permit (data processing) and a $1.00 residential surcharge; the schedule has the rest
Roof Replacement PermitIt dependswhether decking, structural members or equipment supports are modifiedSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeResidential photovoltaic work is billed on the electrical schedule: E-0 fee issuance cost per permit $20.00, E3.1 minimum fee $15.00; the schedule has the rest

Frequently asked questions

Do you need a pool permit in Memphis?
It depends on the project. Prefabricated swimming pools, measured by the depth of the pool. If you are unsure how that applies to your project, call the permit office at 901-222-8300 before you start.
How much does a pool permit cost in Memphis?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Aug 2026. For the figure on your own project, call the permit office at 901-222-8300.
Where do you apply for a pool permit in Memphis?
You can apply through the Memphis permit portal or contact the Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement) directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Memphis?
Under Tennessee law (T.C.A. 62-6-103; Tenn. Comp. R. & Regs. 0780-02-23-.01(1)(i), -.05(3), -.05(4)(b)2.; Tenn. Comp. R. & Regs. 0780-02-01-.05(2)(a)): Tennessee lets a homeowner act as their own builder. Under T.C.A. 62-6-103, as the State Fire Marshal's Office explains it, an owner may construct a single residence once every two years for personal use without a contractor's license, so long as the home is not for resale, lease, or rent, and anyone the homeowner hires whose portion of the work is $25,000 or more must be a licensed contractor. In state permit areas the owner pulls a property owner's permit, limited by rule to one per 24 month period, and the work is subject to the same inspections and fees as a contractor's job; proof of licensure is waived at permit purchase only when the owner personally performs the work. For electrical work, a homeowner may wire their own residence only after obtaining a residential property owner's electrical permit, which covers only the applicant and immediate family, does not authorize help from anyone unlicensed, and is limited to one per 12 month period unless the owner lost the home to fire or windstorm. Confirm how Memphis applies this before you apply.

From the Library

Pool Permit in other Tennessee localities

Everything above, sourced

How this pool permit page for Memphis was verified. 2 official sources: develop901.com, shelbycountytn.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Memphis and Shelby County Division of Planning and Development, Office of Construction Code Enforcement (Construction Enforcement). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project