Massachusetts / Worcester

Electrical Permit in Worcester, Massachusetts

Permit required

Yes, a permit is required

Before any electrical wiring or fixture work performed for hire, or within five days of starting it.

Quick answer

Electrical work in Worcester is a separate permit track from the building permit, governed by the Massachusetts Electrical Code at 527 CMR 12.00 and enforced by the local inspector of wires, which in Worcester sits inside the Building and Zoning Division of Inspectional Services. The city's portal states that "All work to be performed in accordance with the Massachusetts Electrical Code (MEC), 527 CMR 12.00" and requires the licensee's license and workers compensation declaration on file. Fees are flat per job type rather than valuation-based, and the city warns that working without a permit carries a penalty of triple the original permit fee with a $500.00 minimum on residential property.

Issued by
City of Worcester Department of Inspectional Services, Building and Zoning Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Worcester

Fee schedule in force
Official scheduleRead .
  • Flat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00";
  • "Single Family detached Additions, renovations, alterations, demolition $100.00" or $170.00 with a service upgrade;
  • "Service Upgrade, repairs, grounding $85.00 1st meter" plus "$30.00 each" additional meter;
  • "Boilers, HVAC units, Water Heaters $85.00";
  • "Smoke/ CO Detectors Installations $85.00";
  • "Pools (Above Ground) $85.00" and "Pools (In Ground) $85.00";
  • "Residential Solar Wiring $250.00";
  • "Residential Generator Wiring $150.00";
  • re-inspection $100.00.
  • Department of Inspectional Services Schedule of Fees, effective March 1, 2024 per its cover page.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Worcester

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Worcester Department of Inspectional Services, Building and Zoning Division

Electrical Permit in Worcester compared with nearby Massachusetts localities

LocalityPermit needed?ThresholdWhat each Massachusetts schedule saysVerified
WorcesterPermit requiredAny sizeFlat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00"
BostonPermit requiredAny size$20 application fee plus $0.25 per amp for service upgrades or $1 per fixture for other work

Permitting activity in Worcester

In 2025, Worcester authorized permits for 470 new residential housing units (57 single-family, 413 in multi-family buildings), valued at $92M, down from 945 the year before. That works out to about 2.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 184,570.

What else needs a permit in Worcester

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, where the deck is also no more than 30 inches above grade at any point, is not attached to the dwelling, and does not serve a required exit doorSee schedule
Fence PermitIt dependsfence heightSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeResidential (up to 3 dwelling units): "Plumbing, First fixture +$15.00 each additional fixture $100.00 +$15.00"
Pool PermitIt dependspool depth, for prefabricated swimming poolsSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a one-story detached storage shedSee schedule
Solar PermitPermit requiredAny sizeThe building permit uses the general formula: "$12.00 per $1,000.00 or fraction thereof of construction value", Minimum $100.00

Frequently asked questions

Do you need an electrical permit in Worcester?
Yes, before any electrical wiring or fixture work performed for hire, or within five days of starting it. If you are unsure how that applies to your project, call the City of Worcester Department of Inspectional Services, Building and Zoning Division at 508-799-1198 before you start.
How much does an electrical permit cost in Worcester?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Worcester Department of Inspectional Services, Building and Zoning Division at 508-799-1198.
Where do you apply for an electrical permit in Worcester?
You can apply through the Worcester permit portal or contact the City of Worcester Department of Inspectional Services, Building and Zoning Division directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Worcester?
Under Massachusetts law (780 CMR R105.3; 780 CMR 110.R5.1.3.1 (10th ed.); M.G.L. c. 142, s. 3; M.G.L. c. 141, s. 1A): Yes for the building permit itself: 780 CMR R105.3 says 'the owner or authorized agent shall file a permit application.' The construction supervisor license (CSL) rules contain an explicit homeowner exemption at 780 CMR 110.R5.1.3.1: 'Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work, then such homeowner shall act as supervisor.' 'Homeowner' is defined as a person who owns a parcel on which he or she resides or intends to reside with a one- or two-family dwelling; a person who constructs more than one home in a two-year period does not qualify. The exemption does not extend to the trades: plumbing and gas work requires licensure under M.G.L. c. 142, s. 3, which contains no homeowner exemption, and the electrician licensing exemptions in M.G.L. c. 141, s. 1A likewise do not include homeowners. Confirm how Worcester applies this before you apply.

From the Library

Electrical Permit in other Massachusetts localities

Everything above, sourced

How this electrical permit page for Worcester was verified. 2 official sources: worcesterma.gov, malegislature.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Worcester Department of Inspectional Services, Building and Zoning Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project