Massachusetts / Worcester

Shed Permit in Worcester, Massachusetts

It depends

Sometimes, depending on the project

Before building or placing a shed larger than 200 sq ft.

Quick answer

Worcester publishes a one-line answer: "Sheds over 200 sq. ft. will require a building permit." A shed at or under 200 sq ft needs no building permit. Over that size the city classifies it as an Accessory Structure, which it describes as "a secondary structure on a property that supports the primary building ... such as garages, sheds, carports", and notes that "Requirements vary based on size, height, and structure type."

Diagram of the 200 sq ft footprint area threshold for a shed permit in Worcester, Massachusetts
Threshold illustrated: 200 sq ft. Whether Worcester requires a permit above or below this measurement is stated in the verdict on this page, verified 2026-08-15.
Typical threshold
floor area of a one-story detached storage shed
Issued by
City of Worcester Department of Inspectional Services, Building and Zoning Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a shed permit costs in Worcester

Fee schedule in force
Official scheduleRead .
  • No shed line item.
  • A shed over the threshold is filed as an Accessory Structure building permit and priced by the general formula: "$12.00 per $1,000.00 or fraction thereof of construction value", Minimum $100.00 (Department of Inspectional Services Schedule of Fees, effective March 1, 2024 per its cover page).
  • Add $50.00 if the application is filed on paper instead of through the online portal.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Worcester

General guide, not specific to this office

What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Worcester Department of Inspectional Services, Building and Zoning Division

Shed Permit in Worcester compared with nearby Massachusetts localities

LocalityPermit needed?ThresholdWhat each Massachusetts schedule saysVerified
WorcesterIt dependsfloor area of a one-story detached storage shedSee schedule
BostonIt dependsone-story detached accessory structures used as tool and storage sheds at a one- or two-family home are exempt when the floor area does not exceed 200 sq ft; the base code volume for other buildings uses 120 sq ftSheds need a Use of Premises Permit at a $50.00 primary fee, named alongside pools on the city's Use of Premises page, per the ISD building fee schedule

Permitting activity in Worcester

In 2025, Worcester authorized permits for 470 new residential housing units (57 single-family, 413 in multi-family buildings), valued at $92M, down from 945 the year before. That works out to about 2.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 184,570.

What else needs a permit in Worcester

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, where the deck is also no more than 30 inches above grade at any point, is not attached to the dwelling, and does not serve a required exit doorSee schedule
Electrical PermitPermit requiredAny sizeFlat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00"
Fence PermitIt dependsfence heightSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeResidential (up to 3 dwelling units): "Plumbing, First fixture +$15.00 each additional fixture $100.00 +$15.00"
Pool PermitIt dependspool depth, for prefabricated swimming poolsSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeThe building permit uses the general formula: "$12.00 per $1,000.00 or fraction thereof of construction value", Minimum $100.00

Frequently asked questions

Do you need a shed permit in Worcester?
It depends on the project. Floor area of a one-story detached storage shed. If you are unsure how that applies to your project, call the City of Worcester Department of Inspectional Services, Building and Zoning Division at 508-799-1198 before you start.
How much does a shed permit cost in Worcester?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Worcester Department of Inspectional Services, Building and Zoning Division at 508-799-1198.
How long does a shed permit take in Worcester?
The building official must issue or deny a building permit in writing within 30 days of filing (780 CMR 51.00 R105.3.1). The city does not publish its own turnaround. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Worcester?
You can apply through the Worcester permit portal or contact the City of Worcester Department of Inspectional Services, Building and Zoning Division directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Worcester?
Under Massachusetts law (780 CMR R105.3; 780 CMR 110.R5.1.3.1 (10th ed.); M.G.L. c. 142, s. 3; M.G.L. c. 141, s. 1A): Yes for the building permit itself: 780 CMR R105.3 says 'the owner or authorized agent shall file a permit application.' The construction supervisor license (CSL) rules contain an explicit homeowner exemption at 780 CMR 110.R5.1.3.1: 'Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work, then such homeowner shall act as supervisor.' 'Homeowner' is defined as a person who owns a parcel on which he or she resides or intends to reside with a one- or two-family dwelling; a person who constructs more than one home in a two-year period does not qualify. The exemption does not extend to the trades: plumbing and gas work requires licensure under M.G.L. c. 142, s. 3, which contains no homeowner exemption, and the electrician licensing exemptions in M.G.L. c. 141, s. 1A likewise do not include homeowners. Confirm how Worcester applies this before you apply.

From the Library

Shed Permit in other Massachusetts localities

Everything above, sourced

How this shed permit page for Worcester was verified. 1 official source: worcesterma.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Worcester Department of Inspectional Services, Building and Zoning Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project