Massachusetts / Worcester

Pool Permit in Worcester, Massachusetts

It depends

Sometimes, depending on the project

Before installing an in-ground pool, or any pool 24 inches deep or more, and separately before any pool wiring, bonding or heater work.

Quick answer

A prefabricated pool less than 24 inches deep is exempt from the building permit under the residential code Worcester enforces; anything deeper, and any in-ground pool, needs one. The electrical permit is a separate track and applies to essentially every pool: the city's own fee schedule prices "Pools (Above Ground)" and "Pools (In Ground)" at $85.00 each under residential electrical. Worcester zoning adds requirements that apply whether or not a building permit is needed: a private pool in a required rear yard must be "no closer than six (6) feet to the property lines and is enclosed by a separate four (4) foot high fence."

Typical threshold
pool depth, for prefabricated swimming pools
Issued by
City of Worcester Department of Inspectional Services, Building and Zoning Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Worcester

Fee schedule in force
Official scheduleRead .

The building permit side has no pool line item and is priced by the general formula: "$12.00 per $1,000.00 or fraction thereof of construction value", Minimum $100.00.

The electrical side does have its own lines: "Pools (Above Ground) $85.00" and "Pools (In Ground) $85.00" under Electrical - Residential (Department of Inspectional Services Schedule of Fees, effective March 1, 2024 per its cover page).

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Worcester

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Worcester Department of Inspectional Services, Building and Zoning Division

Pool Permit in Worcester compared with nearby Massachusetts localities

LocalityPermit needed?ThresholdWhat each Massachusetts schedule saysVerified
WorcesterIt dependspool depth, for prefabricated swimming poolsSee schedule
BostonIt dependsprefabricated swimming pools less than 24 inches deep are exempt from a building permit under the state building code; other pools need onePools need a Use of Premises Permit at a $50.00 primary fee, per the ISD building fee schedule

Permitting activity in Worcester

In 2025, Worcester authorized permits for 470 new residential housing units (57 single-family, 413 in multi-family buildings), valued at $92M, down from 945 the year before. That works out to about 2.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 184,570.

What else needs a permit in Worcester

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsdeck area, where the deck is also no more than 30 inches above grade at any point, is not attached to the dwelling, and does not serve a required exit doorSee schedule
Electrical PermitPermit requiredAny sizeFlat fees by job type under Electrical - Residential: "Single Family Detached Home (w/ overhead service) $180.00"
Fence PermitIt dependsfence heightSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeResidential (up to 3 dwelling units): "Plumbing, First fixture +$15.00 each additional fixture $100.00 +$15.00"
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitIt dependsfloor area of a one-story detached storage shedSee schedule
Solar PermitPermit requiredAny sizeThe building permit uses the general formula: "$12.00 per $1,000.00 or fraction thereof of construction value", Minimum $100.00

Frequently asked questions

Do you need a pool permit in Worcester?
It depends on the project. Pool depth, for prefabricated swimming pools. If you are unsure how that applies to your project, call the City of Worcester Department of Inspectional Services, Building and Zoning Division at 508-799-1198 before you start.
How much does a pool permit cost in Worcester?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Worcester Department of Inspectional Services, Building and Zoning Division at 508-799-1198.
How long does a pool permit take in Worcester?
The building official must issue or deny a building permit in writing within 30 days of filing (780 CMR 51.00 R105.3.1). The city does not publish its own turnaround. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a pool permit in Worcester?
You can apply through the Worcester permit portal or contact the City of Worcester Department of Inspectional Services, Building and Zoning Division directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Worcester?
Under Massachusetts law (780 CMR R105.3; 780 CMR 110.R5.1.3.1 (10th ed.); M.G.L. c. 142, s. 3; M.G.L. c. 141, s. 1A): Yes for the building permit itself: 780 CMR R105.3 says 'the owner or authorized agent shall file a permit application.' The construction supervisor license (CSL) rules contain an explicit homeowner exemption at 780 CMR 110.R5.1.3.1: 'Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work, then such homeowner shall act as supervisor.' 'Homeowner' is defined as a person who owns a parcel on which he or she resides or intends to reside with a one- or two-family dwelling; a person who constructs more than one home in a two-year period does not qualify. The exemption does not extend to the trades: plumbing and gas work requires licensure under M.G.L. c. 142, s. 3, which contains no homeowner exemption, and the electrician licensing exemptions in M.G.L. c. 141, s. 1A likewise do not include homeowners. Confirm how Worcester applies this before you apply.

From the Library

Pool Permit in other Massachusetts localities

Everything above, sourced

How this pool permit page for Worcester was verified. 2 official sources: worcesterma.gov, mass.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Worcester Department of Inspectional Services, Building and Zoning Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends