What you can build without a permit in Massachusetts

Quick answer

Across the 2 Massachusetts jurisdictions we have verified, none of the 20 project rules is a flat "no permit", 8 turn on a size or scope condition the jurisdiction publishes, and 12 require a permit regardless. Deck work is where the answer most often comes with a published condition rather than a flat yes: 2 of the 2 jurisdictions that answer publish one.

Jurisdictions read
2
Rules with an answer
20
No permit needed
0
Depends on size or scope
8
Permit always required
12

How to read this page

"No permit" means the jurisdiction publishes that the work needs no building permit. "Depends" means it publishes a size, height, depth, cost or scope condition that decides the answer, quoted in its own words in the last column; the number beside it is the figure that condition turns on, and which side of the number is exempt is stated by the condition, not by us. Exempt from a building permit is not exempt from zoning, setbacks, height limits, flood rules, an HOA, or a separate electrical, plumbing or mechanical permit, and several of the conditions below say exactly that.

Deck

All 2 make the deck answer turn on a size or scope condition the jurisdiction publishes, and the 2 that state a number all publish 200 sq ft.

Jurisdiction Permit Published figure What the rule says
Boston Depends 200 sq ft decks not exceeding 200 ft2 in area, not more than 30 inches above grade at any point, not attached to a dwelling, and not serving a required exit door are exempt.
Worcester Depends 200 sq ft deck area, where the deck is also no more than 30 inches above grade at any point, is not attached to the dwelling, and does not serve a required exit door.

Fence

All 2 make the fence answer turn on a size or scope condition the jurisdiction publishes, and the 2 that state a number all publish 7 feet.

Jurisdiction Permit Published figure What the rule says
Boston Depends 7 feet a building permit under 780 CMR is not required for fences not over seven feet high; taller fences need one.
Worcester Depends 7 feet fence height.

Pool

All 2 make the pool answer turn on a size or scope condition the jurisdiction publishes, and the 2 that state a number all publish 24 inches.

Jurisdiction Permit Published figure What the rule says
Boston Depends 24 inches prefabricated swimming pools less than 24 inches deep are exempt from a building permit under the state building code; other pools need one.
Worcester Depends 24 inches pool depth, for prefabricated swimming pools.

Shed

All 2 make the shed answer turn on a size or scope condition the jurisdiction publishes, and the 2 that state a number all publish 200 sq ft.

Jurisdiction Permit Published figure What the rule says
Boston Depends 200 sq ft one-story detached accessory structures used as tool and storage sheds at a one- or two-family home are exempt when the floor area does not exceed 200 sq ft; the base code volume for other buildings uses 120 sq ft.
Worcester Depends 200 sq ft floor area of a one-story detached storage shed.

If the work is already built

Violation of the state building code is a criminal matter under M.G.L. c. 143, s. 94: punishable 'by a fine of not more than one thousand dollars or by imprisonment for not more than one year, or both, for each such violation,' and 'Each day during which a violation exists shall constitute a separate offense.' The code itself hooks into this: 780 CMR 114.4 (10th edition) makes anyone who violates 780 CMR or works in violation of a permit 'subject to penalties as prescribed by M.G.L. c. 143, s. 94(a),' and 115.3 applies the same penalties, with the per-day separate offense language, to continuing work after a stop work order.

Massachusetts penalties, the after-the-fact path, and what the statute actually says

3 of the 23 rules we hold for Massachusetts are unresolved because the jurisdiction publishes no answer; they are counted nowhere above. The 20 answered rules come from 16 official sources, each linked from the permit page behind every jurisdiction name. See the full picture for the state on the Massachusetts permit requirements page.

This page compiles what each Massachusetts jurisdiction publishes, with a last checked date. It is not legal advice, and a project that is exempt from a building permit can still need zoning approval or a trade permit. Confirm with the office linked from the jurisdiction's page before you build.