Electrical Permit in Jacksonville, Florida

Permit required

Yes, a permit is required

Before installing, replacing, or altering electrical wiring, service, or equipment at a residence in the City of Jacksonville (Duval County)

Quick answer

The City of Jacksonville's consolidated Duval County Building Inspection Division lists new electrical service and rewiring among the repairs that require a building permit, and separately states electrical work must be done only by contractors and craftsmen certified in that trade and requires its own permit. Electrical permit fees are billed by service size, for example a new single-family 0 to 200 ampere service is a flat $170.00 under the current fee schedule. This applies only within the consolidated city-county limits; the beach cities and Baldwin permit electrical work through their own building departments.

Issued by
Building Inspection Division (City of Jacksonville Department of Public Works)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Jacksonville

Fee schedule in force
Official scheduleRead .
Published in
City Fees schedule (Municipal Code Section 320.409), Electrical Permit Fees, new single-family residential occupancy:

$170.00 for a 0-100, 101-150, or 151-200 ampere service, plus $20.00 for each additional 50 amperes or fractional part;

a temporary service is $80.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Jacksonville compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredAny size
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.
Broward CountyPermit requiredAny size
Charlotte CountyPermit requiredAny size
Clay CountyPermit requiredAny size
Collier CountyPermit requiredPermits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices.
Jacksonvillethis pagePermit requiredAny size

How to apply in Jacksonville

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Building Inspection Division (City of Jacksonville Department of Public Works)

  • 214 North Hogan Street, 2nd Floor, Room 280 (Ed Ball Building), Jacksonville, FL 32202
  • Phone: (904) 255-8500

Permitting activity in Jacksonville

In 2025, Jacksonville authorized permits for 5,890 new residential housing units (3,611 single-family, 2,279 in multi-family buildings), valued at $1.1B, down from 6,398 the year before. That works out to about 6.4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 920,570.

What else needs a permit in Jacksonville

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Fence PermitNo permit neededExemptNot published
HVAC PermitIt dependsA permit is required for mechanical work such as installing or replacing air conditioning and heating equipment. It is not required for connecting portable heating, ventilation, cooling, or evaporative-cooling equipment; for replacing a part within a single existing piece of equipment; or for a self-contained refrigeration system with 10 pounds or less of refrigerant run by a motor of 1 horsepower or less.See schedule
Patio PermitIt dependsNo permit for a plain patio slabNot published
Plumbing PermitIt dependsA permit is required for plumbing work such as fixture installation, water heater replacement, and sewer or water-service connections. It is not required for replacing plumbing fixtures after the stop (excluding water heaters), stopping leaks, or clearing drain stoppages, provided the repair does not involve or require replacing or rearranging valves, pipes, or fixtures.See schedule
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredA building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit.See schedule
Solar PermitPermit requiredAny sizeCity Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees lists a Solar water heater line item at $21.00

Frequently asked questions

Do you need an electrical permit in Jacksonville?
Yes, before installing, replacing, or altering electrical wiring, service, or equipment at a residence in the City of Jacksonville (Duval County). If you are unsure how that applies to your project, call the permit office at (904) 255-8500 before you start.
How much does an electrical permit cost in Jacksonville?
The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at (904) 255-8500.
Where do you apply for an electrical permit in Jacksonville?
You can apply through the Jacksonville permit portal or contact the Building Inspection Division (City of Jacksonville Department of Public Works) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Jacksonville?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Jacksonville applies this before you apply.

From the Library

Electrical Permit in other Florida localities

Everything above, sourced

How this electrical permit page for Jacksonville was verified. 2 official sources: jacksonville.gov, jacksonville.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Inspection Division (City of Jacksonville Department of Public Works). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page