Building permits in Jacksonville, Florida
Of the 10 common home projects we have verified in Jacksonville, 6 need a permit outright and 3 depend on size or scope. Click any project for the full rule, fee, and how to apply.
- Project types verified
- 10in Jacksonville
One thing Jacksonville does not make you permit
Worth knowing before you call anyone. Most jurisdictions we cover require all of these.
- Fence Permit
Not applicable for a standard fence; a Certificate of Appropriateness may still be needed in a historic district
Look up a permit in Jacksonville
Jacksonville permit records are public, and you can check a property's permit history by address or permit number online.
How to get a building permit in Jacksonville
The City of Jacksonville’s Building Inspection Division, in the Department of Public Works, issues building, electrical, mechanical and plumbing permits. Contractors and design professionals must apply online through JaxEPICS. A homeowner permitting their own primary residence applies in person at the Ed Ball Building downtown, and a small shed can be issued the same day.
Where the office is and when it is open
The division is on the 2nd Floor of the Ed Ball Building, 214 North Hogan Street, Jacksonville, FL 32202; homeowners go to Room 280. It is open 7 a.m. to 4 p.m., Monday through Friday, and plan examiners take walk-in questions from 2 p.m. to 4 p.m. daily, first come, first served. Call (904) 255-8500; Option 4 is homeowner permitting. The Clerk of Courts has a satellite office in the lobby for recording a Notice of Commencement, open 8 a.m. to 4 p.m., and a tax collector’s office on the 2nd floor takes permit fees.
Applying online in Jacksonville
- Register a profile first: email the Contractor Registration or Design Professional Registration form to BIDRegistrations@coj.net.
- In JaxEPICS, create the permit, complete the Location, Contacts and Specs tabs, then upload every document as a PDF into the matching folder on the Documents tab. Digitally sealed plans cannot be password protected.
- Upload a completed Permission to Obtain Permits form; the contractor must file one before issuance.
- Put the person who should get review emails in the Project Contact field.
- After Zoning, Concurrency and Development Services sign off, the status turns “Pending Review Payment”: pay the plan review fee to start the building review. When all reviews pass, the status becomes “Pending Payment”; pay the balance and the permit goes “Active.”
Homeowners file at the counter instead. You must own the home and live in it (not for sale or rent), sign an Owner’s Affidavit, and for work on an existing structure bring proof of Homestead Exemption. Check in at the kiosk; a permit assistant enters the project and routes you to the other agencies on the 2nd floor.
What five common projects cost here
From the City Fees schedule, Section 320.409, on the city’s fee page, which shows no effective date for it.
- HVAC: air conditioning $11.00 per ton for one to ten tons; furnaces $22.00 for the first 200,000 BTU an hour; minimum $60.00. Read 18 Nov 2026.
- Shed: not over 150 square feet and $5,000 with no final inspection, $45.00 (plan review included) plus a $15.00 Development Services Fee and a $25.00 C & D Debris fee; one inspection, $75.00 plus $25.00 and $25.00; more than one, $112.50 or $33.75 per required inspection (whichever is greater), plus a Development Services Fee of $37.50 or $11.25 per inspection and the $25.00 debris fee. That last line does not say plan review is included; the subsection’s plan review fee is 67% of the BID permit fee or $90.00, whichever is greater. Read 18 Nov 2026.
- Pool: in-ground, $1.50 per 1,000 gallons (minimum $45.00), plus $0.50 resource management and $0.50 Development Services (minimum $15.00) per 1,000 gallons, a landscape fee of 12% of the BID permit fee, a $25.00 debris fee and plan review of 67% of the BID permit fee or $60.00, whichever is greater. Above-ground, $75.00 with plan review plus $25.00. The pool’s electrical permit is a separate $120.00 (above-ground $60.00). Read 18 Nov 2026.
- Electrical: a service change at an existing home is $80.00 to 100 amperes and $100.00 for 101-150 or 151-200, plus $20.00 for each additional 50 amperes; a new single-family service is $170.00. Minimum $60.00. Read 18 Nov 2026.
- Plumbing: $11.00 per fixture roughed in or set, $11.00 per sewer connection; minimum $60.00. Read 18 Nov 2026.
Plan review fees quadruple on a fourth submission.
How long review takes
The FAQ says to expect 25-30 business days for the first review of a building permit and about 10 business days or less for resubmissions. The clock starts only after Zoning, Concurrency and Development Services approve the plans and you pay the plan review fee. A shed under 150 square feet and under $5,000 is issued during your visit; larger sheds go to a plans examiner.
Inspections, in order
Request inspections at (904) 255-8500 between 7 a.m. and 4 p.m. on weekdays, or on the Building Inspections website. Before any inspection, the permit and the recorded Notice of Commencement (required when improvements exceed $5,000, or $15,000 for mechanical work) must be posted, and the approved documents must be on site in a weatherproof container. An occupied home needs someone 18 years of age or older there to give access.
The FAQ’s typical sequence is foundation slab (before the pour), framing, insulation, drywall, plumbing and electrical rough and final, duct work, heating and air equipment, and gas. A shed with a slab needs its slab inspection before the concrete goes in. Skipping required inspections can lock down your address against future permits.
Why applications get sent back
- Plans that do not show the extent of the work: the FAQ says many are returned for exactly that. If a renovation leaves mechanical, electrical or plumbing untouched, say so clearly on the plans.
- A shed site plan that is not a scalable certified survey showing distances to two property lines, every structure, and any well or septic tank and drain field.
- A shed of 150 square feet or larger without structural drawings sealed by a Florida licensed design professional.
What needs no permit in Jacksonville
- Patio slabs.
- Replacing plumbing fixtures after the stop (not water heaters), stopping leaks, and clearing drain stoppages without changing pipes or valves.
- Self-contained refrigeration with 10 pounds or less of refrigerant and a motor of one horsepower or less.
If the work already started
Starting work without first applying for a permit is unlawful and punishable by a fine of $250, and electrical permits list a late fee of double. What Florida law says about building without a permit.
Checklist before you apply
- A JaxEPICS profile, or for a homeowner, a counter visit with photo ID.
- Your deed and, for an existing home, proof of Homestead Exemption.
- Every document as an unlocked PDF, in the right folder.
- A Permission to Obtain Permits form.
- A scalable certified survey for a shed; sealed drawings at 150 square feet or larger.
- The plan review fee to start review, the balance at issuance.
- A recorded Notice of Commencement over $5,000.
One Jacksonville project followed from application to final inspection
Jacksonville documents read for this guide
- Office page: Building Inspection Division, read
- Permit portal: Online/Electronic Permit Submission (JaxEPICS), read
- Application: Residential Permits (Homeowner Permitting), read
- Application: Residential (Single Family) Property Owner Obtained Permits: Sheds, read
- Fee schedule: City Fees: Building Inspection Division, Section 320.409, read
- Inspections: Frequently Asked Questions, read
How to actually get a permit in Jacksonville
Replacing an air conditioner needs a mechanical permit
Jacksonville’s Building Inspection Division lists replacement of air conditioning units, and installation of central heat, among the work that needs a permit. Plugging in a portable cooler or heater does not.
Who applies, and through what
The division’s online page says every permit is now submitted in JaxEPICS: contractors send a Contractor Registration form to get a profile there, and every application needs a Permission to Obtain Permits form, which the contractor submits. The division’s Residential Permits page does describe an owner route: a homeowner may permit work on a primary residence they own, that is not for sale or rent, by appearing in person at 214 N. Hogan St., Room 280 ((904) 255-8500, Option 4), with a signed Owner’s Affidavit and proof of homestead exemption. Yet the same page says heating and air conditioning work must be done only by contractors and craftsmen certified in that trade, and the online page requires online submission, so the division’s pages disagree; call Option 4 before planning to pull an AC permit yourself. To check a contractor’s license, the division points to the state’s Department of Business and Professional Regulation and the city’s Construction Trades Qualifying Board.
The sequence the portal shows
The statuses a JaxEPICS permit moves through are the clearest map of the process. A new application sits in Not Submitted while you complete the Location, Contacts and Specs tabs and upload PDFs to the right folders, then you press Submit For Review. Depending on the permit type it passes through development services, agency and sufficiency reviews, Pending Review Payment and In Review, may come back as Return for Corrections, then reaches Pending Payment. Once the balance is paid it becomes Active, which is when work may begin, and it closes as Finalized after the last inspection. Plan review time does not start, the online page adds, until Zoning, Concurrency and Development Services approve the plans for review and the review fee is paid.
The fee
The city’s mechanical fee list (Section 320.409) charges $11.00 for each ton of cooling for one to ten tons, $22.00 for heating equipment up to the first 200,000 BTU an hour, and $17.00 for a duct system handling up to the first 2,000 cubic feet a minute, with a $60.00 minimum for any mechanical permit. Add the lines your job touches; the minimum applies when they total less. A plan review fee may also apply; the city’s fee list does not price it for a changeout.
Review time
Jacksonville publishes none for a changeout on the pages we read. Florida law gives the city 5 business days to act on a complete mechanical permit application for an existing single-family home when the work is valued under $15,000, using the city’s own plans reviewer.
Inspections
Request inspections at (904) 255-8500, 7 a.m. to 4 p.m. on weekdays, or online. Before any inspection the permit must be posted on site, and the approved documents kept there in a weatherproof container. A notice of commencement is needed only above a threshold: the division’s residential page sets it at $15,000 for mechanical work, and state law exempts an AC repair or replacement contract under $15,000. An occupied home needs someone 18 years of age or older on site to give access, and the contractor must provide access to any location an inspector cannot reach. Typical inspections include air conditioning and heating equipment and duct work; the inspector’s name and phone number are printed on the permit. A permit is good for 180 days.
What we could not verify
Whether the division issues an owner permit for an AC changeout, given its conflicting pages; a list of common changeout failures; and the JaxEPICS screens behind the login.
AC replacement checklist to copy
- Licensed contractor checked with DBPR or the city’s trades board
- JaxEPICS application submitted, then every review status cleared
- Fee lines: tons of cooling, heating, ducts, or the $60.00 minimum
- Permit posted, plus the notice of commencement if the AC contract is $15,000 or more; documents in a weatherproof box
- An adult home for the inspection and a clear path to the equipment
Documents read for this section
- Published guide: Building Inspection Division FAQs, read
- Permit portal: Online Permit Submission (JaxEPICS), read
- Fee schedule: City Fees: Mechanical Permit Fees, Section 320.409, read
- Published guide: Building Inspection Division: Residential Permits, read
- Inspection scheduling: Building Inspection Division FAQs: Field Inspections, read
Sources
- City of Jacksonville Building Inspection Division FAQs: when a permit is required, permit life, scheduling and what inspectors need on site (accessed )
- City of Jacksonville online permit submission page: JaxEPICS requirements, permit statuses and contractor profiles (accessed )
- City of Jacksonville fee list, Mechanical Permit Fees under Section 320.409 (accessed )
- Section 553.792, Florida Statutes: review deadlines for building permit applications (accessed )
- City of Jacksonville Building Inspection Division, Residential Permits: the homeowner route, the owner's affidavit, the trade-certification statement and the notice of commencement thresholds (accessed )
- Section 713.135, Florida Statutes: the notice of commencement rule and its exception for heating and air-conditioning repair or replacement contracts under $15,000 (accessed )
What needs a permit in Jacksonville
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | No permit needed | Exempt | Not published |
| HVAC Permit | It depends | A permit is required for mechanical work such as installing or replacing air conditioning and heating equipment. It is not required for connecting portable heating, ventilation, cooling, or evaporative-cooling equipment; for replacing a part within a single existing piece of equipment; or for a self-contained refrigeration system with 10 pounds or less of refrigerant run by a motor of 1 horsepower or less. | See schedule |
| Patio Permit | It depends | No permit for a plain patio slab | Not published |
| Plumbing Permit | It depends | A permit is required for plumbing work such as fixture installation, water heater replacement, and sewer or water-service connections. It is not required for replacing plumbing fixtures after the stop (excluding water heaters), stopping leaks, or clearing drain stoppages, provided the repair does not involve or require replacing or rearranging valves, pipes, or fixtures. | See schedule |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Shed Permit | Permit required | A building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit. | See schedule |
| Solar Permit | Permit required | Any size | City Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees lists a Solar water heater line item at $21.00 |
Planning a project in Jacksonville?
Hire it out
Sponsored
Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.
Compare local contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
Planning several things at once? Check your whole project
Schedule an inspection in Jacksonville
Permitted work is not finished until it passes inspection. Request inspections by phone at (904) 255-8500 option 4, Monday through Friday 7 a.m. to 4 p.m., or online at buildinginspections.coj.net. Results can also be tracked at JAXEPICS.coj.net by permit number, confirmation number, or address.
Schedule or request a Jacksonville inspection
When the portal will not take the date you need, the office still books by phone: (904) 255-8500.
Checked . If the office has changed its process, report it.
Jacksonville permit fees compared with nearby Florida localities
| Florida locality | Deck Permit | HVAC Permit | Electrical Permit |
|---|---|---|---|
| Jacksonville | See schedule | See schedule | See schedule |
| Alachua County | No deck-specific flat fee is published | Flat fee: Res Mechanical Alt/Repair $110.00, per the Building Fee Schedule effective 11/01/2025 | No electrical-specific flat fee is published |
| Brevard County | Not published | See schedule | See schedule |
| Broward County | See schedule | See schedule | Electrical permit is the greater of a $125 minimum base fee or 3.0% of job value; the schedule has the rest |
Each cell is taken from that Florida jurisdiction's own fee schedule; the full wording and source sit on each permit page.
Jacksonville permit questions, answered from the data
- Do you need a permit in Jacksonville?
- For most projects, yes. Of the 10 permit types we cover in Jacksonville, 6 always require a permit (for example a deck permit), 3 depend on size or scope (an HVAC permit, for instance) and 1 needs no permit at all in Jacksonville. Each Jacksonville permit type's page states the exact rule and its source.
- How much does a permit cost in Jacksonville?
- Jacksonville publishes a fee for 8 of the 10 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by Building Inspection Division (City of Jacksonville Department of Public Works); we do not estimate or mark them up.
- Where do you apply for a permit in Jacksonville?
- Building Inspection Division (City of Jacksonville Department of Public Works) issues permits in Jacksonville and has an online permit portal, and takes questions at (904) 255-8500. The Jacksonville official page and portal are linked in the office section above.
How the Jacksonville pages were verified. 10 permit types, 7 distinct official sources, most recently checked . Every rule is read from Building Inspection Division (City of Jacksonville Department of Public Works) or the applicable code and cited on its page; anything we could not confirm for Jacksonville is marked rather than estimated. How we verify.
Permitting activity in Jacksonville
In 2025, Jacksonville authorized permits for 5,890 new residential housing units (3,611 single-family, 2,279 in multi-family buildings), valued at $1.1B , down from 6,398 the year before. That works out to about 6.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 920,570.