Florida / Jacksonville

Roof Replacement Permit in Jacksonville, Florida

Permit required

Yes, a permit is required

Before re-roofing or recovering an existing roof on a residential structure in the City of Jacksonville (Duval County)

Confirmed on official page Verified Building Inspection Division (City of Jacksonville Department of Public Works)

By Mario Bailey, verified against official sources

Quick answer

The City of Jacksonville's consolidated Duval County Building Inspection Division lists re-roofs under Alterations on its official list of work that requires a building permit, and it publishes a separate roofing permit fee tier that excludes only the original roof installed with brand-new construction. Roofing contractors performing the work must be certified or registered by the State of Florida. This requirement applies only within the consolidated city-county jurisdiction; the beach cities and Baldwin issue roofing permits through their own building departments.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before re-roofing or recovering an existing roof on a residential structure in the City of Jacksonville (Duval County)

What a roof replacement permit costs in Jacksonville

Line item
roof replacement permitBy formulaCity Fees schedule (Municipal Code Section 320.409), Building Inspection Division (10) Roofing (excludes original roofing on new one- and two-family dwellings and original roofing on additions/accessory buildings for single-family dwellings): $10.00 BID permit fee per 1,000 square feet or fractional part; an $80.00 minimum for roofing permits not requiring an inspection; a $150.00 minimum where one or more inspections are required; $10.00 for roofing repairs under 500 square feet; a $17.50 C&D Debris fee.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Jacksonville compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyIt dependsarea of roof repair or replacement
Brevard CountyPermit requiredNot specified
Broward CountyIt dependsunder F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Broward County Building Code Division.
Charlotte CountyPermit requiredRoof repairs less than 100 square feet (one square) where the work does not include repairs to trusses or rafters do not require a permit.
Clay CountyPermit requiredNot specified
Collier CountyPermit requiredCollier County's locally adopted building code amendment exempts from permit only the repair of any roof covering not exceeding $1,500.00 in value of materials and labor, or repair work not exceeding two roofing squares (200 square feet) in extent; this exemption is for roof repair, not for roof replacement/reroofing (removing and replacing the covering), which requires a standard Reroof permit.
Jacksonvillethis pagePermit requiredNot specified

How to apply in Jacksonville

A residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.

What most roof replacement permit applications include:

  • State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
  • A recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
  • Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
  • The materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
  • If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).

General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. Building Inspection Division (City of Jacksonville Department of Public Works) sets the exact checklist for Jacksonville.

Where to apply in Jacksonville:

Building Inspection Division (City of Jacksonville Department of Public Works)

  • 214 North Hogan Street, 2nd Floor, Room 280 (Ed Ball Building), Jacksonville, FL 32202
  • Phone: (904) 255-8500

Inspections and closing out your permit

Most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.

  1. Where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
  2. An overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
  3. Flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
  4. A final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
  5. In some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
  6. Reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Jacksonville permit portal or by phone at (904) 255-8500.

Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a roof replacement permit in Jacksonville?
The City of Jacksonville's consolidated Duval County Building Inspection Division lists re-roofs under Alterations on its official list of work that requires a building permit, and it publishes a separate roofing permit fee tier that excludes only the original roof installed with brand-new construction. Roofing contractors performing the work must be certified or registered by the State of Florida. This requirement applies only within the consolidated city-county jurisdiction; the beach cities and Baldwin issue roofing permits through their own building departments. Always confirm with the Building Inspection Division (City of Jacksonville Department of Public Works) before starting.
How much does a roof replacement permit cost in Jacksonville?
City Fees schedule (Municipal Code Section 320.409), Building Inspection Division (10) Roofing (excludes original roofing on new one- and two-family dwellings and original roofing on additions/accessory buildings for single-family dwellings): $10.00 BID permit fee per 1,000 square feet or fractional part; an $80.00 minimum for roofing permits not requiring an inspection; a $150.00 minimum where one or more inspections are required; $10.00 for roofing repairs under 500 square feet; a $17.50 C&D Debris fee. See the official fee schedule for current amounts.
Where do you apply for a roof replacement permit in Jacksonville?
You can apply through the Jacksonville permit portal or contact the Building Inspection Division (City of Jacksonville Department of Public Works) directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Jacksonville?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Jacksonville applies this before you apply.

From the Library

What else needs a permit in Jacksonville

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedCity Fees schedule (Municipal Code Section 320.409), Building Inspection Division...
Electrical PermitPermit requiredNot specifiedCity Fees schedule (Municipal Code Section 320.409), Electrical Permit Fees, new...
Fence PermitNo permit neededNot specifiedNot published
HVAC PermitIt dependsA permit is required for mechanical work such as installing or replacing air conditioning and heating equipment. It is not required for connecting portable heating, ventilation, cooling, or evaporative-cooling equipment; for replacing a part within a single existing piece of equipment; or for a self-contained refrigeration system with 10 pounds or less of refrigerant run by a motor of 1 horsepower or less.City Fees schedule (Municipal Code Section 320.409), Mechanical Permit Fees: air...
Patio PermitIt dependsNot specifiedNot published
Plumbing PermitIt dependsA permit is required for plumbing work such as fixture installation, water heater replacement, and sewer or water-service connections. It is not required for replacing plumbing fixtures after the stop (excluding water heaters), stopping leaks, or clearing drain stoppages, provided the repair does not involve or require replacing or rearranging valves, pipes, or fixtures.City Fees schedule (Municipal Code Section 320.409), Plumbing Permit Fees: $11.00 for...
Pool PermitPermit requiredNot specifiedCity Fees schedule (Municipal Code Section 320.409), Building Inspection Division (11)...
Shed PermitPermit requiredA building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit.City Fees schedule (Municipal Code Section 320.409), Building Inspection Division...
Solar PermitPermit requiredNot specifiedCity Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees lists a Solar...

Roof Replacement Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Jacksonville documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Building Inspection Division (City of Jacksonville Department of Public Works). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Roof Replacement Permit requirements across Florida localities

Look up an existing Jacksonville permit record

Permit required
Get quotes