Roof Replacement Permit in Leon County, Florida
Permit required
Yes, a permit is required
Before replacing or re-covering a roof in unincorporated Leon County
By Mario Bailey, verified against official sources
Quick answer
Leon County requires a building permit to replace or re-cover a roof, processed as a Reroof permit and billed as a flat fee on the county's fee schedule. A licensed roofing contractor must complete the county's Reroof Scope of Work and Inspection Affidavit documenting the underlayment method, flashing, drip edge, and Florida product-approval numbers, and a final roofing inspection with site photographs referencing the permit number is required. This applies to unincorporated Leon County; the City of Tallahassee runs its own building department.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before replacing or re-covering a roof in unincorporated Leon County
What a roof replacement permit costs in Leon County
How Leon County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | It depends | area of roof repair or replacement |
| Brevard County | Permit required | Not specified |
| Broward County | It depends | under F.S. 553.79(1)(g) (HB 803, ch. 2026-63, effective 2026-07-01), work valued at less than $7,500 on a single-family dwelling qualifies for exemption upon a written exemption request with documentation of the nature and value of the work; the exemption excludes electrical, plumbing, structural, mechanical, and gas work and any property in a flood hazard area; the statute does not name roofing, so a non-structural reroof under that value can qualify; confirm with Broward County Building Code Division. |
| Charlotte County | Permit required | Roof repairs less than 100 square feet (one square) where the work does not include repairs to trusses or rafters do not require a permit. |
| Clay County | Permit required | Not specified |
| Collier County | Permit required | Collier County's locally adopted building code amendment exempts from permit only the repair of any roof covering not exceeding $1,500.00 in value of materials and labor, or repair work not exceeding two roofing squares (200 square feet) in extent; this exemption is for roof repair, not for roof replacement/reroofing (removing and replacing the covering), which requires a standard Reroof permit. |
| Leon Countythis page | Permit required | Not specified |
How to apply in Leon County
A residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.
What most roof replacement permit applications include:
- State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
- A recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
- Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
- The materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
- If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).
General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division sets the exact checklist for Leon County.
Where to apply in Leon County:
Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division
- 435 N. Macomb Street, Renaissance Center, 2nd Floor, Tallahassee, FL 32301
- Phone: 850-606-1300
- Email: PooleJ@LeonCountyFL.gov
Inspections and closing out your permit
Most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
- Where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
- An overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
- Flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
- A final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
- In some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
- Reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Leon County permit portal or by phone at 850-606-1300.
Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Roof Replacement Permit checklist for Leon County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before replacing or re-covering a roof in unincorporated Leon County.
- Budget the fee. Fee Schedule, "Repair Work and Exterior Alteration Permits" flat-fee category: "Re-roof or Roof Re-cover $241.45.". Official fee schedule.
- Apply. A residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies. Start at the Leon County permit portal.
- Keep the office details handy. Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division. Phone: 850-606-1300. Address: 435 N. Macomb Street, Renaissance Center, 2nd Floor, Tallahassee, FL 32301.
- Plan for inspections. Most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a roof replacement permit in Leon County?
- Leon County requires a building permit to replace or re-cover a roof, processed as a Reroof permit and billed as a flat fee on the county's fee schedule. A licensed roofing contractor must complete the county's Reroof Scope of Work and Inspection Affidavit documenting the underlayment method, flashing, drip edge, and Florida product-approval numbers, and a final roofing inspection with site photographs referencing the permit number is required. This applies to unincorporated Leon County; the City of Tallahassee runs its own building department. Always confirm with the Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division before starting.
- How much does a roof replacement permit cost in Leon County?
- Fee Schedule, "Repair Work and Exterior Alteration Permits" flat-fee category: "Re-roof or Roof Re-cover $241.45.". See the official fee schedule for current amounts.
- Where do you apply for a roof replacement permit in Leon County?
- You can apply through the Leon County permit portal or contact the Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division directly. The links are listed on this page.
- Can a homeowner pull a roof replacement permit themselves in Leon County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Leon County applies this before you apply.
From the Library
What else needs a permit in Leon County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Decks greater than 100 square feet in area, or more than 30 inches above grade on any side, require a building permit (either condition alone triggers it). | Fee Schedule, "Construction Not Under Roof" flat-fee category: "Decks, Docks, Ramps... |
| Electrical Permit | Permit required | Not specified | Fee Schedule, Residential Plan Review/Inspection (sq ft based): Electrical Plan Review... |
| Fence Permit | It depends | Traditional fences (chain link, wooden, etc.) do not need a building permit; a solid wall does. | The Fee Schedule (Development Support & Environmental Management Department Fee... |
| HVAC Permit | Permit required | Not specified | Fee Schedule, Residential Plan Review/Inspection (sq ft based): Mechanical Plan Review... |
| Patio Permit | It depends | Patio covers, sunrooms, and screen or pool enclosures are handled as aluminum structures requiring a permit; a plain open, unroofed, at-grade patio slab is not separately addressed in any published county page found. | The Fee Schedule has no line item named "Patio" or "Aluminum Structure" |
| Plumbing Permit | Permit required | Not specified | Fee Schedule, Residential Plan Review/Inspection (sq ft based): Plumbing Plan Review... |
| Pool Permit | Permit required | Applies to private residential swimming pools, hot tubs, or non-portable spas containing water over 24 inches deep. | Fee Schedule, "Swimming Pools" flat-fee category: "Above-Ground Pools $180.00,"... |
| Shed Permit | It depends | Sheds over 100 square feet in area require a building permit; sheds of any size are still subject to Development Services and Environmental Services review for location, setbacks from boundary lines, easements, and floodplain. | Fee Schedule, Residential One and Two-Family category, which covers "detached accessory... |
| Solar Permit | Permit required | Not specified | Fee Schedule, "Solar Installation Permits" flat-fee category: "Solar Photovoltaic... |
Roof Replacement Permit in other Florida localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Leon County documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Roof Replacement Permit requirements across Florida localities
Permit office
Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division
850-606-1300Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 ·
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 ·