Florida / Leon County

Solar Permit in Leon County, Florida

Permit required

Yes, a permit is required

Before installing a photovoltaic solar system or a solar water heating system in unincorporated Leon County

Quick answer

Leon County requires a building permit for solar installations, both photovoltaic panel systems and solar water heating systems, each billed as its own flat fee on the county's fee schedule and processed as a Residential Solar permit. Roof-mounted photovoltaic systems must also meet Florida Building Code Residential fire-access pathway and ridge-setback requirements published by the county. This applies to unincorporated Leon County; the City of Tallahassee runs its own building department.

Issued by
Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your Florida Department of Business and Professional Regulation license active, and under which business name? Verify it on www.myfloridalicense.com.

Florida's owner-builder rule (F.S. 489.103(7)(a)-(c)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Leon County

Fee schedule in force
Official scheduleRead .
Published in
Fee Schedule, "Solar Installation Permits" flat-fee category:

"Solar Photovoltaic Systems $180.00," "Solar Water Heating Systems $180.00."

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Leon County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alachua CountyPermit requiredNo solar-specific flat fee is published
Brevard CountyPermit requiredSee schedule
Charlotte CountyPermit requiredAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation is $50,000 or more) and a 0.025 x building-fee surcharge
Collier CountyPermit requiredSee schedule
Hernando CountyPermit requiredPhotovoltaic System (Res): $180.00
Hillsborough CountyPermit requiredResidential Photovoltaic trade permit fee is $250 flat, inspection-only with no plan review; the schedule has the rest
Leon Countythis pagePermit requiredFee Schedule, "Solar Installation Permits" flat-fee category: "Solar Photovoltaic Systems $180.00," "Solar Water Heating Systems $180.00."

How to apply in Leon County

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division

  • 435 N. Macomb Street, Renaissance Center, 2nd Floor, Tallahassee, FL 32301
  • Phone: 850-606-1300
  • Email: PooleJ@LeonCountyFL.gov

Permitting activity in Leon County

In 2025, Leon County authorized permits for 2,047 new residential housing units (617 single-family, 1,430 in multi-family buildings), valued at $437M, up from 1,765 the year before. That works out to about 6.8 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 299,048.

What else needs a permit in Leon County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsDecks greater than 100 square feet in area, or more than 30 inches above grade on any side, require a building permit (either condition alone triggers it).Fee Schedule, "Construction Not Under Roof" flat-fee category: "Decks, Docks, Ramps, Boardwalks, etc. $271.52."
Electrical PermitPermit requiredAny sizeFee Schedule, Residential Plan Review/Inspection (sq ft based): Electrical Plan Review $0.10 per sq ft, Electrical Inspection $0.09 per sq ft
Fence PermitIt dependsTraditional fences (chain link, wooden, etc.) do not need a building permit; a solid wall does.See schedule
HVAC PermitPermit requiredAny sizeFee Schedule, Residential Plan Review/Inspection (sq ft based): Mechanical Plan Review $0.07 per sq ft, Mechanical Inspection $0.06 per sq ft
Patio PermitIt dependsPatio covers, sunrooms, and screen or pool enclosures are handled as aluminum structures requiring a permit; a plain open, unroofed, at-grade patio slab is not separately addressed in any published county page found.See schedule
Plumbing PermitPermit requiredAny sizeFee Schedule, Residential Plan Review/Inspection (sq ft based): Plumbing Plan Review $0.05 per sq ft, Plumbing Inspection $0.04 per sq ft
Pool PermitPermit requiredApplies to private residential swimming pools, hot tubs, or non-portable spas containing water over 24 inches deep.See schedule
Roof Replacement PermitPermit requiredAny sizeFee Schedule, "Repair Work and Exterior Alteration Permits" flat-fee category: "Re-roof or Roof Re-cover $241.45."
Shed PermitIt dependsSheds over 100 square feet in area require a building permit; sheds of any size are still subject to Development Services and Environmental Services review for location, setbacks from boundary lines, easements, and floodplain.See schedule

Frequently asked questions

Do you need a solar permit in Leon County?
Yes, before installing a photovoltaic solar system or a solar water heating system in unincorporated Leon County. If you are unsure how that applies to your project, call the permit office at 850-606-1300 before you start.
How much does a solar permit cost in Leon County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at 850-606-1300.
Where do you apply for a solar permit in Leon County?
You can apply through the Leon County permit portal or contact the Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Leon County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Leon County applies this before you apply.

From the Library

Solar Permit in other Florida localities

Everything above, sourced

How this solar permit page for Leon County was verified. 2 official sources: cms.leoncountyfl.gov, cms.leoncountyfl.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Development Support & Environmental Management (DSEM), Building Plans Review and Inspection Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project