Shed Permit in Jacksonville, Florida
Permit required
Yes, a permit is required
Before installing a storage shed on residential property in the City of Jacksonville (Duval County)
Quick answer
The City of Jacksonville's consolidated Duval County Building Inspection Division requires a permit for a residential shed regardless of size; the city's own list of work exempt from a permit does not include any shed size exemption. Sheds under 150 square feet and under $5,000 in cost can often be issued at the counter during a single visit, while larger or costlier sheds need structural drawings sealed by a Florida-licensed design professional and a plan review first. This requirement applies only inside the consolidated city-county jurisdiction; the beach cities and Baldwin issue shed permits through their own building departments.
- Typical threshold
- A building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit.
- Issued by
- Building Inspection Division (City of Jacksonville Department of Public Works)
- Phone
- (904) 255-8500
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What your shed permit must meet in Florida
Florida sheds are built under the Florida Building Code, Residential, 8th Edition (2023), which requires structures to be designed for the state's wind loads, but Florida Statutes carve out two specific size-based reductions in what a shed must resist or include.
- As a structure, a shed is generally subject to the Florida Building Code's baseline wind-design requirement that applies to buildings and structures statewide (FBC Section 1609.1).
- Storage sheds not designed for human habitation with a floor area of 720 square feet or less are exempt from the code's mandatory windborne-debris-impact (opening protection) standard (F.S. 553.73(10)).
- Buildings of 400 square feet or less used in conjunction with a one- or two-family residence, which covers most sheds, are exempt from the code's door height and width requirements (F.S. 553.73(10)).
Based on Florida Statutes 553.73(10); Florida Building Code, 8th Edition (2023), Section 1609.1. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.
What a shed permit costs in Jacksonville
- Fee schedule in force
- Official scheduleRead .
- Published in
- City Fees schedule (Municipal Code Section 320.409), Building Inspection Division, exceptions to subsection (1):
- residential accessory structures not exceeding 150 square feet and $5,000, not requiring a final inspection, are $45.00 (includes plan review) plus a $15.00 Development Services Fee and a $25.00 C&D Debris fee;
- structures requiring only one inspection are $75.00 plus the same additional fees;
- structures requiring more than one inspection are $112.50 or $33.75 per required inspection, whichever is greater.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Jacksonville compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | It depends | area of a single storage shed, exemption available once per property |
| Brevard County | It depends | A permit is required for an accessory structure (shed) over 100 square feet. |
| Broward County | Permit required | Any size |
| Charlotte County | It depends | A building permit is not required for plastic or rubber manufactured type sheds 68 square feet or less in area, though they must comply with zoning setbacks and be moved and secured if there is the threat of a tropical storm. |
| Clay County | Permit required | Any size |
| Hernando County | It depends | Sheds with impervious roof coverings of 120 square feet or less do not require a Zoning permit, provided other county regulations (setbacks, floodplain rules, one detached accessory building per parcel, etc.) are met |
| Jacksonvillethis page | Permit required | A building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit. |
How to apply in Jacksonville
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Building Inspection Division (City of Jacksonville Department of Public Works)
- 214 North Hogan Street, 2nd Floor, Room 280 (Ed Ball Building), Jacksonville, FL 32202
- Phone: (904) 255-8500
Your Shed Permit checklist for Jacksonville
- Confirm the requirement. Yes, a permit is required. Typical threshold: A building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit. Read the rule where we read it: jacksonville.gov: building inspection division.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Jacksonville permit portal.
- Keep the office details handy. Building Inspection Division (City of Jacksonville Department of Public Works). Phone: (904) 255-8500. Address: 214 North Hogan Street, 2nd Floor, Room 280 (Ed Ball Building), Jacksonville, FL 32202.
Compiled from the official sources on this page. Last checked .
Permitting activity in Jacksonville
In 2025, Jacksonville authorized permits for 5,890 new residential housing units (3,611 single-family, 2,279 in multi-family buildings), valued at $1.1B, down from 6,398 the year before. That works out to about 6.4 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 920,570.
What else needs a permit in Jacksonville
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | See schedule |
| Electrical Permit | Permit required | Any size | See schedule |
| Fence Permit | No permit needed | Exempt | Not published |
| HVAC Permit | It depends | A permit is required for mechanical work such as installing or replacing air conditioning and heating equipment. It is not required for connecting portable heating, ventilation, cooling, or evaporative-cooling equipment; for replacing a part within a single existing piece of equipment; or for a self-contained refrigeration system with 10 pounds or less of refrigerant run by a motor of 1 horsepower or less. | See schedule |
| Patio Permit | It depends | No permit for a plain patio slab | Not published |
| Plumbing Permit | It depends | A permit is required for plumbing work such as fixture installation, water heater replacement, and sewer or water-service connections. It is not required for replacing plumbing fixtures after the stop (excluding water heaters), stopping leaks, or clearing drain stoppages, provided the repair does not involve or require replacing or rearranging valves, pipes, or fixtures. | See schedule |
| Pool Permit | Permit required | Any size | See schedule |
| Roof Replacement Permit | Permit required | Any size | See schedule |
| Solar Permit | Permit required | Any size | City Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees lists a Solar water heater line item at $21.00 |
Frequently asked questions
- Do you need a shed permit in Jacksonville?
- Yes, before installing a storage shed on residential property in the City of Jacksonville (Duval County). If you are unsure how that applies to your project, call the permit office at (904) 255-8500 before you start.
- How much does a shed permit cost in Jacksonville?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 17 Nov 2026. For the figure on your own project, call the permit office at (904) 255-8500.
- Where do you apply for a shed permit in Jacksonville?
- You can apply through the Jacksonville permit portal or contact the Building Inspection Division (City of Jacksonville Department of Public Works) directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Jacksonville?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Jacksonville applies this before you apply.
From the Library
Shed Permit in other Florida localities
Everything above, sourced
How this shed permit page for Jacksonville was verified. 2 official sources: jacksonville.gov, jacksonville.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Inspection Division (City of Jacksonville Department of Public Works). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page