It depends

Sometimes, depending on the project

No permit for a plain patio slab; a permit is required for a patio cover or other roofed/screened patio structure

Quick answer

The City of Jacksonville's consolidated Duval County Building Inspection Division puts a plain patio slab on its official list of work that does not require a permit. A patio cover, however, is explicitly named on the same page's list of Additions that do require a permit, alongside room additions and swimming pools. So the verdict depends on what is being built: a bare concrete slab is exempt, while a roofed or screened patio structure is not. This applies only inside the consolidated city-county jurisdiction; the beach cities and Baldwin permit patio work through their own building departments.

Issued by
Building Inspection Division (City of Jacksonville Department of Public Works)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds your patio, they usually handle any required permit as part of the job. Compare a few bids before you commit.

Compare patio contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What your patio permit must meet in Florida

Florida covered patios and screened patios or lanais are built under the Florida Building Code, Residential, 8th Edition (2023), which uses its own patio-cover appendix with wind load as the governing design criterion, while aluminum-frame screen enclosures are engineered under the wind-load provisions of the Florida Building Code, Building.

  • Patio covers are governed by the FBC Residential patio-cover appendix; in the 8th Edition its design-loads section was revised to remove the snow-load reference, leaving wind load as the governing design criterion statewide (FBC-R Appendix H, AH105.1).
  • Wind loads for screen enclosures are not calculated under the normal building wind-load method; they must be determined under Florida Building Code, Building, Section 2002.4 instead, per an express exception in Section 1609.1.1 of the current code (FBC-B 1609.1.1, 2002.4).

Based on Florida Building Code, Residential, 8th Edition (2023), Appendix H (AH105.1); Florida Building Code, Building, 8th Edition (2023), Sections 1609.1.1 and 2002.4. Read the code. Local amendments can be stricter; confirm the current requirement with your office before you build.

What a patio permit costs in Jacksonville

Permit fee
Not published
Fee schedule in force
Official scheduleRead .

Jacksonville publishes no fee for this permit type in a schedule we can verify. Ask Building Inspection Division (City of Jacksonville Department of Public Works) how the fee is calculated for your project.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Jacksonville compares in Florida

JurisdictionPermit needed?Threshold
Broward CountyPermit requiredAny size
Hernando CountyIt dependsSand-set pavers that are not part of a pool or spa deck do not require a building permit; other patio construction methods are not separately addressed by name
Jacksonvillethis pageIt dependsNo permit for a plain patio slab
Lee CountyIt dependsA permit is required to construct, enlarge, alter, or repair a structure, including structural slabs, unenclosed structures, porches, and screen, glass, or vinyl rooms; the county refers residents to Florida Building Code 105.2 and Land Development Code 6-117 for work not requiring a permit.
Leon CountyIt dependsPatio covers, sunrooms, and screen or pool enclosures are handled as aluminum structures requiring a permit; a plain open, unroofed, at-grade patio slab is not separately addressed in any published county page found.
Martin CountyPermit requiredAny size
Miami-Dade CountyIt dependsopen patio slabs, walkways and pavers outside the building do not require a building permit, as long as all exempt work on the home in any 12-month period does not exceed $5,000.00; slabs for screened patios and pool slabs are not covered by that exemption; patio covers need a building permit

How to apply in Jacksonville

General guide, not specific to this office

What a patio permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a patio permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Building Inspection Division (City of Jacksonville Department of Public Works)

  • 214 North Hogan Street, 2nd Floor, Room 280 (Ed Ball Building), Jacksonville, FL 32202
  • Phone: (904) 255-8500

Permitting activity in Jacksonville

In 2025, Jacksonville authorized permits for 5,890 new residential housing units (3,611 single-family, 2,279 in multi-family buildings), valued at $1.1B, down from 6,398 the year before. That works out to about 6.4 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 920,570.

What else needs a permit in Jacksonville

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitNo permit neededExemptNot published
HVAC PermitIt dependsA permit is required for mechanical work such as installing or replacing air conditioning and heating equipment. It is not required for connecting portable heating, ventilation, cooling, or evaporative-cooling equipment; for replacing a part within a single existing piece of equipment; or for a self-contained refrigeration system with 10 pounds or less of refrigerant run by a motor of 1 horsepower or less.See schedule
Plumbing PermitIt dependsA permit is required for plumbing work such as fixture installation, water heater replacement, and sewer or water-service connections. It is not required for replacing plumbing fixtures after the stop (excluding water heaters), stopping leaks, or clearing drain stoppages, provided the repair does not involve or require replacing or rearranging valves, pipes, or fixtures.See schedule
Pool PermitPermit requiredAny sizeSee schedule
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredA building permit is required for a residential shed of any size. Sheds 150 square feet or larger (or with a job cost of $5,000 or more) additionally require structural design drawings signed and sealed by a Florida-licensed design professional and a plans-examiner review before the permit is issued; sheds under that size and cost, with no final inspection required, can often be issued the same visit.See schedule
Solar PermitPermit requiredAny sizeCity Fees schedule (Municipal Code Section 320.409): Plumbing Permit Fees lists a Solar water heater line item at $21.00

Frequently asked questions

Do you need a patio permit in Jacksonville?
It depends on the project. No permit for a plain patio slab; a permit is required for a patio cover or other roofed/screened patio structure. If you are unsure how that applies to your project, call the permit office at (904) 255-8500 before you start.
How much does a patio permit cost in Jacksonville?
We found no published fee for a patio permit in Jacksonville. To learn how it is calculated for your project, call the permit office at (904) 255-8500.
Where do you apply for a patio permit in Jacksonville?
You can apply through the Jacksonville permit portal or contact the Building Inspection Division (City of Jacksonville Department of Public Works) directly. The links are listed on this page.
Can a homeowner pull a patio permit themselves in Jacksonville?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Jacksonville applies this before you apply.

From the Library

Patio Permit in other Florida localities

Everything above, sourced

How this patio permit page for Jacksonville was verified. 2 official sources: jacksonville.gov, jacksonville.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Building Inspection Division (City of Jacksonville Department of Public Works). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project