Electrical Permit in Cleveland, Ohio

It depends

Sometimes, depending on the project

Before any electrical wiring or equipment is installed, altered or repaired, including temporary installations and new or repaired illuminated sign connections. Not needed for changing light bulbs or fuses, repairs to portable equipment such as lamps and fans, or servicing and like for like replacement of existing equipment at existing terminal connections.

Quick answer

Cleveland requires a separate electrical permit, and its Electrical Permits page says permits are required for electrical work and electrical fixtures along with electrical equipment and devices, both new and temporary. Codified Ordinance 3137.05 carries the requirement and the only real carve outs: minor repair, defined as installing or replacing light bulbs or fuses and repairing portable utilization equipment, and maintenance, defined as servicing existing equipment and replacing electrical equipment with equipment of like type and capacity connected to existing terminal connections. Neither covers changes or repairs to permanent wiring or extensions of terminal connections. Contractors must be bonded, insured, licensed with the State of Ohio and registered with the City; homeowners may apply with a notarized homeowner's affidavit and do not need to be registered contractors. The permit is also the route to getting power turned on: the FAQ says an electrical permit is required, the inspector named on the permit does the inspection, and once approved the city calls the power company.

Issued by
City of Cleveland Department of Building and Housing, Division of Construction Permitting
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Cleveland

Fee schedule in force
Official scheduleRead .
Published in
Electrical Wiring and Equipment fee schedule effective January 2, 2014:
  • "the minimum fee for any permit shall be $50.00".
  • New construction, additions and alterations to existing buildings are $50.00 for each 1,000 square feet or part thereof;
  • repairs to existing electrical fixtures and/or systems are $50.00;
  • a blanket electrical permit is $200.00 for each year for each premises.
  • Add the 1 percent State of Ohio surcharge for 1, 2 and 3 family dwelling units.
  • A special inspection where the work is not ready or the address is wrong costs $40.00, and an inspection outside regular working hours costs $100.00.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cleveland compares in Ohio

JurisdictionPermit needed?Threshold
CincinnatiIt dependsBefore installing or repairing any permanent electrical wiring, including extensions to...
Clevelandthis pageIt dependsBefore any electrical wiring or equipment is installed, altered or repaired, including...
ColumbusPermit requiredAny size
Franklin CountyPermit requiredAny size

How to apply in Cleveland

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Cleveland Department of Building and Housing, Division of Construction Permitting

  • Department of Building and Housing, Division of Construction Permitting, Cleveland City Hall, 601 Lakeside Ave., Room 505, Cleveland, OH 44114
  • Phone: 216.664.2910
  • Email: BHpermits@clevelandohio.gov

Permitting activity in Cleveland

In 2025, Cleveland authorized permits for 706 new residential housing units (143 single-family, 563 in multi-family buildings), valued at $142M, down from 896 the year before. That works out to about 1.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 378,589.

What else needs a permit in Cleveland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Fence PermitIt dependsshare of an existing fence repaired or replaced within any twelve month period, where foundations and footers are unchangedGeneral Fee Schedule effective January 2, 2014, item C(2) "Fences, guardrails, or barriers for 1, 2 and 3 family dwelling units", minimum fee $50.00
HVAC PermitPermit requiredAny sizeHVAC permit fee schedule effective January 2, 2014: "One, two and three family dwellings: the minimum fee for any permit shall be $50.00"
Plumbing PermitIt dependsBefore installing, altering, removing, replacing or repairing any drainage, plumbing or...Plumbing Fixtures, Appliance and Piping fee schedule effective January 2, 2014: "The minimum fee for any permit shall be: $50.00"
Pool PermitIt dependswater capacity of a private swimming pool; a depth of more than two feet also triggers the permitGeneral Fee Schedule effective January 2, 2014, item C(4) "Swimming pools (private/residential)", minimum fee $50.00
Roof Replacement PermitIt dependsshare of the roof whose shingles are replaced, where the replacement is in the same materialSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an electrical permit in Cleveland?
Sometimes: before any electrical wiring or equipment is installed, altered or repaired, including temporary installations and new or repaired illuminated sign connections. Not needed for changing light bulbs or fuses, repairs to portable equipment such as lamps and fans, or servicing and like for like replacement of existing equipment at existing terminal connections. If you are unsure how that applies to your project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910 before you start.
How much does an electrical permit cost in Cleveland?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910.
Where do you apply for an electrical permit in Cleveland?
You can apply through the Cleveland permit portal or contact the City of Cleveland Department of Building and Housing, Division of Construction Permitting directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Cleveland?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Cleveland applies this before you apply.

From the Library

Electrical Permit in other Ohio localities

Everything above, sourced

How this electrical permit page for Cleveland was verified. 2 official sources: clevelandohio.gov, web.archive.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Cleveland Department of Building and Housing, Division of Construction Permitting. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project