Ohio / Franklin County

Electrical Permit in Franklin County, Ohio

Permit required

Yes, a permit is required

Before any electrical installation, alteration or service change, including the bonding work on a pool, spa or hot tub.

Quick answer

An electrical permit is required, and it is a separate permit from the structural building permit, but the issuing body has changed. Franklin County's own Online Permit Center now tells residents that electrical permitting goes through the City of Columbus at 614-645-7433, alongside a matching note that plumbing goes through Franklin County Public Health. The county's older published pages still describe an in-house Franklin County electrical permit taken out by a contractor registered with the county or by a homeowner on affidavit. Whichever office issues it, a valid license is required to perform electrical work even though no license is needed to pull a structural building permit.

Issued by
Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department
From an official source Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Franklin County

Fee schedule in force
Official scheduleRead .
Published in
Franklin County EDP Fee Schedule, effective Jan. 1, 2014, Building Permit Fees:
  • Electric Permit, each outlet $1.50, each amp $0.50, minimum fee $60, Registration Fee $50;
  • these fees do not include the 1% State Building Permit Surcharge.
  • The county's PV System Fees Summary lists an Electric Permit at $60.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Franklin County compares in Ohio

JurisdictionPermit needed?Threshold
CincinnatiIt dependsBefore installing or repairing any permanent electrical wiring, including extensions to...
ClevelandIt dependsBefore any electrical wiring or equipment is installed, altered or repaired, including...
ColumbusPermit requiredAny size
Franklin Countythis pagePermit requiredAny size

How to apply in Franklin County

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department

  • Franklin County Building Department, 142 S. Front St., Columbus, OH 43215 (the Economic Development and Planning Department offices, where zoning applications are filed, are at 150 South Front Street, FSL Suite 10, Columbus, OH 43215-7104)
  • Phone: 614-525-3166
  • Email: building@franklincountyohio.gov

Permitting activity in Franklin County

In 2025, Franklin County authorized permits for 10,494 new residential housing units (1,829 single-family, 8,665 in multi-family buildings), valued at $1.8B, up from 8,122 the year before. That works out to about 7.7 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,361,536.

What else needs a permit in Franklin County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

None of the 9 project types verified for Franklin County carry a size or scope threshold. See the Permit needed column for each project's own answer, since there is no threshold to compare here.

ProjectPermit needed?Typical fee
Deck PermitPermit requiredSee schedule
Fence PermitPermit requiredSee schedule
HVAC PermitPermit requiredSee schedule
Patio PermitPermit requiredSee schedule
Plumbing PermitPermit requiredSee schedule
Pool PermitPermit requiredSee schedule
Roof Replacement PermitPermit requiredSee schedule
Shed PermitPermit requiredSee schedule
Solar PermitPermit requiredSee schedule

Frequently asked questions

Do you need an electrical permit in Franklin County?
Yes, before any electrical installation, alteration or service change, including the bonding work on a pool, spa or hot tub. If you are unsure how that applies to your project, call the permit office at 614-525-3166 before you start.
How much does an electrical permit cost in Franklin County?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 614-525-3166.
Where do you apply for an electrical permit in Franklin County?
You can apply through the Franklin County permit portal or contact the Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Franklin County?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Franklin County applies this before you apply.

From the Library

Electrical Permit in other Ohio localities

Everything above, sourced

How this electrical permit page for Franklin County was verified. 2 official sources: franklincountyohio.gov, franklincountyohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page