Solar Permit in Franklin County, Ohio
Permit required
Yes, a permit is required
Before installing a roof mounted or ground mounted photovoltaic system on a residential property.
Quick answer
Franklin County requires a permit for any PV system installation, with no size floor. The county folds three approvals into one submission: the PV Systems Form acts as a building permit, an electrical permit and a Certificate of Zoning Compliance at once, and the three underlying fees are charged separately on the same application. Roof mounted systems are only accepted on lightweight roof types such as composition, lightweight masonry or metal. Two inspections follow, a rough inspection during the build and a final on completion.
- Issued by
- Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department
- Phone
- 614-525-3166
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
Ohio's owner-builder rule (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)) sets what you may do on your own home without hiring anyone. Read the statute.
What a solar permit costs in Franklin County
- Fee schedule in force
- Official scheduleRead .
- Summary of PV Systems Form Fees, published by Franklin County EDP: Certificate of Zoning Compliance, Residential, 'Roof Mounted $25.00' and 'Ground Mounted $75.00' (Commercial $275.00);
- Building Permit '$120.00' with 'Plus: Each 100 sq. ft. thereafter $10.00';
- 'Electric Permit $60.00';
- 'Plan Review Fee $50.00'. The sheet adds: 'Note: There is a 1% building permit surcharge as required by the State of Ohio.' It also states 'Fees are not being raised in order to accommodate PV Systems Permits.'
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Franklin County compares in Ohio
No Ohio jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Cincinnati | Permit required | See schedule |
| Cleveland | Permit required | See schedule |
| Columbus | Permit required | See schedule |
| Franklin Countythis page | Permit required | See schedule |
How to apply in Franklin County
General guide, not specific to this office
What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department
- Franklin County Building Department, 142 S. Front St., Columbus, OH 43215 (the Economic Development and Planning Department offices, where zoning applications are filed, are at 150 South Front Street, FSL Suite 10, Columbus, OH 43215-7104)
- Phone: 614-525-3166
- Email: building@franklincountyohio.gov
Your Solar Permit checklist for Franklin County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: franklincountyohio.gov: Building Permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Franklin County permit portal.
- Keep the office details handy. Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department. Phone: 614-525-3166. Email: building@franklincountyohio.gov. Address: Franklin County Building Department, 142 S. Front St., Columbus, OH 43215 (the Economic Development and Planning Department offices, where zoning applications are filed, are at 150 South Front Street, FSL Suite 10, Columbus, OH 43215-7104).
Compiled from the official sources on this page. Last checked .
Permitting activity in Franklin County
In 2025, Franklin County authorized permits for 10,494 new residential housing units (1,829 single-family, 8,665 in multi-family buildings), valued at $1.8B, up from 8,122 the year before. That works out to about 7.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,361,536.
What else needs a permit in Franklin County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
None of the 9 project types verified for Franklin County carry a size or scope threshold. See the Permit needed column for each project's own answer, since there is no threshold to compare here.
| Project | Permit needed? | Typical fee |
|---|---|---|
| Deck Permit | Permit required | See schedule |
| Electrical Permit | Permit required | See schedule |
| Fence Permit | Permit required | See schedule |
| HVAC Permit | Permit required | See schedule |
| Patio Permit | Permit required | See schedule |
| Plumbing Permit | Permit required | See schedule |
| Pool Permit | Permit required | See schedule |
| Roof Replacement Permit | Permit required | See schedule |
| Shed Permit | Permit required | See schedule |
Frequently asked questions
- Do you need a solar permit in Franklin County?
- Yes, before installing a roof mounted or ground mounted photovoltaic system on a residential property. If you are unsure how that applies to your project, call the permit office at 614-525-3166 before you start.
- How much does a solar permit cost in Franklin County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 614-525-3166.
- Where do you apply for a solar permit in Franklin County?
- You can apply through the Franklin County permit portal or contact the Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department directly. The links are listed on this page.
- Can a homeowner pull a solar permit themselves in Franklin County?
- Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Franklin County applies this before you apply.
From the Library
Solar Permit in other Ohio localities
Everything above, sourced
How this solar permit page for Franklin County was verified. 2 official sources: franklincountyohio.gov, franklincountyohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page