Ohio / Cleveland

Solar Permit in Cleveland, Ohio

Permit required

Yes, a permit is required

Before installing any rooftop or ground mounted solar system, residential or commercial. Both a building permit and an electrical permit must be filed.

Quick answer

Cleveland treats a solar array as an exterior alteration under the general building permitting system, so it needs a building permit, and its Solar Panel Guide states that all applicants must file for both a Building permit and an Electrical permit. Zoning review is required for every project and is conducted internally during the permit review, with no separate application. Ground mounted systems are treated as utility structures under the Ohio building codes, which is why they need a building permit in addition to the electrical permit, and their review includes a detailed foundation analysis. The guide states there are no codes or ordinances in Cleveland that specifically restrict solar; structural drawings must always be sealed by a design professional, while roof attachments are preferred but not required to be stamped and sealed for residential dwellings.

Issued by
City of Cleveland Department of Building and Housing, Division of Construction Permitting
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?

Ohio's owner-builder rule (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Cleveland

Fee schedule in force
Official scheduleRead .
  • Cleveland's Solar Panel Guide publishes a residential table: residential building permit for alterations at $5.00 per $1,000 of project cost with a $30.00 minimum, new structures at $10.00 per $1,000 of project cost, electrical permit at $50.00 per 1,000 square feet with a $50.00 minimum, plan review $20.00 and zoning $20.00.
  • It adds a 1 percent state surcharge on the plan review and permit fee for residential installations.
  • The guide notes the zoning fee is paid at the beginning, the plan review fee when zoning is approved, and the permit fees when the permits are ready to be pulled.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cleveland compares in Ohio

No Ohio jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CincinnatiPermit requiredSee schedule
Clevelandthis pagePermit requiredSee schedule
ColumbusPermit requiredSee schedule
Franklin CountyPermit requiredSee schedule

How to apply in Cleveland

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Cleveland Department of Building and Housing, Division of Construction Permitting

  • Department of Building and Housing, Division of Construction Permitting, Cleveland City Hall, 601 Lakeside Ave., Room 505, Cleveland, OH 44114
  • Phone: 216.664.2910
  • Email: BHpermits@clevelandohio.gov

Permitting activity in Cleveland

In 2025, Cleveland authorized permits for 706 new residential housing units (143 single-family, 563 in multi-family buildings), valued at $142M, down from 896 the year before. That works out to about 1.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 378,589.

What else needs a permit in Cleveland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore any electrical wiring or equipment is installed, altered or repaired, including...Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00"
Fence PermitIt dependsshare of an existing fence repaired or replaced within any twelve month period, where foundations and footers are unchangedGeneral Fee Schedule effective January 2, 2014, item C(2) "Fences, guardrails, or barriers for 1, 2 and 3 family dwelling units", minimum fee $50.00
HVAC PermitPermit requiredAny sizeHVAC permit fee schedule effective January 2, 2014: "One, two and three family dwellings: the minimum fee for any permit shall be $50.00"
Plumbing PermitIt dependsBefore installing, altering, removing, replacing or repairing any drainage, plumbing or...Plumbing Fixtures, Appliance and Piping fee schedule effective January 2, 2014: "The minimum fee for any permit shall be: $50.00"
Pool PermitIt dependswater capacity of a private swimming pool; a depth of more than two feet also triggers the permitGeneral Fee Schedule effective January 2, 2014, item C(4) "Swimming pools (private/residential)", minimum fee $50.00
Roof Replacement PermitIt dependsshare of the roof whose shingles are replaced, where the replacement is in the same materialSee schedule
Shed PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a solar permit in Cleveland?
Yes, before installing any rooftop or ground mounted solar system, residential or commercial. Both a building permit and an electrical permit must be filed. If you are unsure how that applies to your project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910 before you start.
How much does a solar permit cost in Cleveland?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910.
How long does a solar permit take in Cleveland?
In Cleveland, a solar permit typically takes 3 to 5 working days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a solar permit in Cleveland?
You can apply through the Cleveland permit portal or contact the City of Cleveland Department of Building and Housing, Division of Construction Permitting directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Cleveland?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Cleveland applies this before you apply.

From the Library

Solar Permit in other Ohio localities

Everything above, sourced

How this solar permit page for Cleveland was verified. 2 official sources: clevelandohio.gov, clevelandohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Cleveland Department of Building and Housing, Division of Construction Permitting. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project