Permit required

Yes, a permit is required

Before erecting or installing any shed or other detached accessory building on the lot.

Confirmed on official page Verified

Issued byCity of Cleveland Department of Building and Housing, Division of Construction Permitting

By Mario Bailey, verified against official sources

Quick answer

Cleveland's Permit Requirements sheet lists sheds by name among the installations that need a permit, and the Division of Construction Permitting repeats sheds under Accessory Structures and Outdoor Installations on its Projects That Require Permits list. The city publishes no square footage cutoff that would exempt a small shed, and its fee schedule carries a flat $50.00 minimum for tool sheds, so treat any shed as permit work. Drawings are required with the application: the city's drawing requirements sheet names sheds explicitly. The only size based accessory carve out Cleveland publishes is for chicken coops and beehives, which need no Building Department permit unless the coop, cage or enclosure is permanently affixed to the ground or another structure, or is more than 32 square feet in area or 8 feet in height, and those still need a Health Department license on 216.664.2300.

Who is pulling this permit?

Hire it out

Sponsored

If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.

Compare contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before erecting or installing any shed or other detached accessory building on the lot.

What a shed permit costs in Cleveland

Line item
shed permitBy formulaGeneral Fee Schedule effective January 2, 2014, item C(1) "Private garages, tool sheds, residential antennas, and other accessory structures or buildings", minimum fee $50.00. Add the plan examination fee of $20.00 per 1,000 sq ft or fraction of that, with a $20.00 minimum for anything under 1,000 sq ft, the $20.00 residential zoning fee, and the 1 percent State of Ohio surcharge.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cleveland compares in Ohio

JurisdictionPermit needed?Threshold
CincinnatiIt dependstotal floor area of a shed accessory to a one-, two- or three-family dwelling
Clevelandthis pagePermit requiredAny size
ColumbusIt dependsshed under 200 sq ft does not require a permit; shed 200 sq ft or larger requires a permit and plan review
Franklin CountyPermit requiredAny size

How to apply in Cleveland

In Cleveland, a residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • For Cleveland, a written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • For Cleveland, a scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Cleveland Department of Building and Housing, Division of Construction Permitting sets the exact checklist for Cleveland.

Where to apply in Cleveland:

City of Cleveland Department of Building and Housing, Division of Construction Permitting

  • Department of Building and Housing, Division of Construction Permitting, Cleveland City Hall, 601 Lakeside Ave., Room 505, Cleveland, OH 44114
  • Phone: 216.664.2910
  • Email: BHpermits@clevelandohio.gov

Shed Permit in Cleveland compared with nearby Ohio localities

LocalityPermit needed?ThresholdWhat each Ohio schedule saysVerified
ClevelandPermit requiredAny size...antennas, and other accessory structures or buildings", minimum fee...
CincinnatiIt dependstotal floor area of a shed accessory to a one-, two- or three-family dwelling...valuation under "NEW CONSTRUCTION - ADDITION - ALTERATION - REPAIR" (a $2,000.00...
ColumbusIt dependsshed under 200 sq ft does not require a permit; shed 200 sq ft or larger requires a permit and plan review...200 square feet bill under the alterations and accessory structures line at $385...
Franklin CountyPermit requiredAny size1, 2014': Building Permit Fees, 'Base Fee (first 1000 sq. ft.) $120.00' and 'Plus: Each...

Inspections and closing out your permit

In Cleveland, a permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection in Cleveland: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection in Cleveland: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection in Cleveland: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. In Cleveland: for a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Cleveland permit portal or by phone at 216.664.2910.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Cleveland?
Cleveland's Permit Requirements sheet lists sheds by name among the installations that need a permit, and the Division of Construction Permitting repeats sheds under Accessory Structures and Outdoor Installations on its Projects That Require Permits list. The city publishes no square footage cutoff that would exempt a small shed, and its fee schedule carries a flat $50.00 minimum for tool sheds, so treat any shed as permit work. Drawings are required with the application: the city's drawing requirements sheet names sheds explicitly. The only size based accessory carve out Cleveland publishes is for chicken coops and beehives, which need no Building Department permit unless the coop, cage or enclosure is permanently affixed to the ground or another structure, or is more than 32 square feet in area or 8 feet in height, and those still need a Health Department license on 216.664.2300. Always confirm with the City of Cleveland Department of Building and Housing, Division of Construction Permitting before starting.
How much does a shed permit cost in Cleveland?
General Fee Schedule effective January 2, 2014, item C(1) "Private garages, tool sheds, residential antennas, and other accessory structures or buildings", minimum fee $50.00. Add the plan examination fee of $20.00 per 1,000 sq ft or fraction of that, with a $20.00 minimum for anything under 1,000 sq ft, the $20.00 residential zoning fee, and the 1 percent State of Ohio surcharge. See the official fee schedule for current amounts.
How long does a shed permit take in Cleveland?
In Cleveland, a shed permit typically takes 3 to 5 working days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Cleveland?
You can apply through the Cleveland permit portal or contact the City of Cleveland Department of Building and Housing, Division of Construction Permitting directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Cleveland?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Cleveland applies this before you apply.

From the Library

What else needs a permit in Cleveland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny size...charged under section A: "New buildings and additions, or parts of the same: $10.00...
Electrical PermitIt dependsBefore any electrical wiring or equipment is installed, altered or repaired, including......schedule effective January 2, 2014: "the minimum fee for any permit shall be...
Fence PermitIt dependsshare of an existing fence repaired or replaced within any twelve month period, where foundations and footers are unchanged...guardrails, or barriers for 1, 2 and 3 family dwelling units", minimum fee...
HVAC PermitPermit requiredAny size...two and three family dwellings: the minimum fee for any permit shall be...
Plumbing PermitIt dependsBefore installing, altering, removing, replacing or repairing any drainage, plumbing or......effective January 2, 2014: "The minimum fee for any permit shall be:...
Pool PermitIt dependswater capacity of a private swimming pool; a depth of more than two feet also triggers the permit...2, 2014, item C(4) "Swimming pools (private/residential)", minimum fee...
Roof Replacement PermitIt dependsshare of the roof whose shingles are replaced, where the replacement is in the same material...family dwelling house is charged under section A(2) "Alterations or repairs: $5.00...
Solar PermitPermit requiredAny size...publishes a residential table: residential building permit for alterations at $5.00...

Shed Permit in other Ohio localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Cleveland documents; the office above sets the local rules.

How this shed permit page for Cleveland was verified. 2 official sources: clevelandohio.gov, clevelandohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Cleveland Department of Building and Housing, Division of Construction Permitting. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare Shed Permit requirements across Ohio localities

Shed permit rules nationwide

Permit required
Get quotes