Ohio / Cleveland

Pool Permit in Cleveland, Ohio

It depends

Sometimes, depending on the project

Before constructing or installing a private swimming pool that holds more than 1,500 gallons of water or is deeper than two feet, whether in ground or above ground.

Quick answer

Cleveland's Pool Permits page sets the trigger at more than 1,500 gallons of water or a depth greater than two feet, and Codified Ordinance 3117.01 uses the same two tests to define a private swimming pool: more than one thousand five hundred gallons of water, or a depth of more than twenty-four inches to the top of the side wall. Four copies of the construction plan are required, and the pool may also need an Electrical Wiring and Systems Application for Permit. There is a health handoff inside the building permit: CCO 3117.02(c) says no permit shall be issued by the Commissioner of Building and Housing until the application has been approved by the Commissioner of Health as to the method of disinfection and bactericidal treatment and the type and range of water testing equipment. The Department of Building and Housing circulates plans to other City departments when additional reviews are required.

Typical threshold
water capacity of a private swimming pool; a depth of more than two feet also triggers the permit
Issued by
City of Cleveland Department of Building and Housing, Division of Construction Permitting
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Cleveland

Fee schedule in force
Official scheduleRead .
  • General Fee Schedule effective January 2, 2014, item C(4) "Swimming pools (private/residential)", minimum fee $50.00.
  • Add the $20.00 minimum plan examination fee, the $20.00 residential zoning fee, and the 1 percent State of Ohio surcharge.
  • A pool that needs power also needs an electrical permit, whose minimum fee is $50.00 under the Electrical Wiring and Equipment schedule.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cleveland compares in Ohio

JurisdictionPermit needed?Threshold
CincinnatiIt dependsdepth of a constructed pool serving a one-, two- or three-family dwelling
Clevelandthis pageIt dependswater capacity of a private swimming pool; a depth of more than two feet also triggers the permit
ColumbusIt dependsa building permit is required for any swimming or wading pool capable of a water depth of more than 24 inches, including hot tubs and spas
Franklin CountyPermit requiredAny size

How to apply in Cleveland

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Cleveland Department of Building and Housing, Division of Construction Permitting

  • Department of Building and Housing, Division of Construction Permitting, Cleveland City Hall, 601 Lakeside Ave., Room 505, Cleveland, OH 44114
  • Phone: 216.664.2910
  • Email: BHpermits@clevelandohio.gov

Permitting activity in Cleveland

In 2025, Cleveland authorized permits for 706 new residential housing units (143 single-family, 563 in multi-family buildings), valued at $142M, down from 896 the year before. That works out to about 1.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 378,589.

What else needs a permit in Cleveland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore any electrical wiring or equipment is installed, altered or repaired, including...Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00"
Fence PermitIt dependsshare of an existing fence repaired or replaced within any twelve month period, where foundations and footers are unchangedGeneral Fee Schedule effective January 2, 2014, item C(2) "Fences, guardrails, or barriers for 1, 2 and 3 family dwelling units", minimum fee $50.00
HVAC PermitPermit requiredAny sizeHVAC permit fee schedule effective January 2, 2014: "One, two and three family dwellings: the minimum fee for any permit shall be $50.00"
Plumbing PermitIt dependsBefore installing, altering, removing, replacing or repairing any drainage, plumbing or...Plumbing Fixtures, Appliance and Piping fee schedule effective January 2, 2014: "The minimum fee for any permit shall be: $50.00"
Roof Replacement PermitIt dependsshare of the roof whose shingles are replaced, where the replacement is in the same materialSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need a pool permit in Cleveland?
It depends on the project. Water capacity of a private swimming pool; a depth of more than two feet also triggers the permit. If you are unsure how that applies to your project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910 before you start.
How much does a pool permit cost in Cleveland?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910.
How long does a pool permit take in Cleveland?
In Cleveland, a pool permit typically takes 3 to 5 working days. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a pool permit in Cleveland?
You can apply through the Cleveland permit portal or contact the City of Cleveland Department of Building and Housing, Division of Construction Permitting directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Cleveland?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Cleveland applies this before you apply.

From the Library

Pool Permit in other Ohio localities

Everything above, sourced

How this pool permit page for Cleveland was verified. 2 official sources: clevelandohio.gov, clevelandohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Cleveland Department of Building and Housing, Division of Construction Permitting. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project