Ohio / Cleveland

HVAC Permit in Cleveland, Ohio

Permit required

Yes, a permit is required

Before installing, replacing, repairing, altering, resetting, converting or moving a furnace, boiler, central air conditioning or refrigeration system, fireplace or wood burning stove, and before new, extended or repaired ductwork, hydronic lines, control wiring or fuel gas piping.

Quick answer

Cleveland requires a separate mechanical permit for HVAC, and the requirement reaches repairs as well as new installations. Codified Ordinance 3131.01 forbids constructing, installing, reinstalling, repairing, replacing, resetting, altering, converting or moving refrigeration, cooling or air conditioning systems, or heat producing systems and combustion plants in dwelling houses, without first obtaining a permit from the Commissioner. Cleveland's general minor repairs exemption cannot be used here: it expressly excludes mechanical work and any work affecting public health or general safety. HVAC contractors must be bonded, insured, licensed with the State of Ohio and registered with the City of Cleveland; do it yourselfers do not have to be registered.

Issued by
City of Cleveland Department of Building and Housing, Division of Construction Permitting
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an HVAC permit costs in Cleveland

Fee schedule in force
Official scheduleRead .
Published in
HVAC permit fee schedule effective January 2, 2014:
  • "One, two and three family dwellings: the minimum fee for any permit shall be $50.00".
  • Installation of each central heating and/or air conditioning system is $50.00;
  • repairs, alterations or extensions of central heating and/or air conditioning systems $50.00;
  • each fuel fired unit heater, space heater or decorative appliance $50.00;
  • each solid fuel burning device such as a fireplace, insert or wood burning stove $50.00;
  • fuel gas piping $13.00 for each 100 lineal feet or fraction thereof.
  • Add the 1 percent State of Ohio surcharge for 1, 2 and 3 family dwelling units.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Cleveland compares in Ohio

No Ohio jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
CincinnatiPermit requiredSee schedule
Clevelandthis pagePermit requiredHVAC permit fee schedule effective January 2, 2014: "One, two and three family dwellings: the minimum fee for any permit shall be $50.00"
ColumbusPermit requiredSee schedule
Franklin CountyPermit requiredSee schedule

How to apply in Cleveland

General guide, not specific to this office

What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Cleveland Department of Building and Housing, Division of Construction Permitting

  • Department of Building and Housing, Division of Construction Permitting, Cleveland City Hall, 601 Lakeside Ave., Room 505, Cleveland, OH 44114
  • Phone: 216.664.2910
  • Email: BHpermits@clevelandohio.gov

Permitting activity in Cleveland

In 2025, Cleveland authorized permits for 706 new residential housing units (143 single-family, 563 in multi-family buildings), valued at $142M, down from 896 the year before. That works out to about 1.9 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 378,589.

What else needs a permit in Cleveland

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredAny sizeSee schedule
Electrical PermitIt dependsBefore any electrical wiring or equipment is installed, altered or repaired, including...Electrical Wiring and Equipment fee schedule effective January 2, 2014: "the minimum fee for any permit shall be $50.00"
Fence PermitIt dependsshare of an existing fence repaired or replaced within any twelve month period, where foundations and footers are unchangedGeneral Fee Schedule effective January 2, 2014, item C(2) "Fences, guardrails, or barriers for 1, 2 and 3 family dwelling units", minimum fee $50.00
Plumbing PermitIt dependsBefore installing, altering, removing, replacing or repairing any drainage, plumbing or...Plumbing Fixtures, Appliance and Piping fee schedule effective January 2, 2014: "The minimum fee for any permit shall be: $50.00"
Pool PermitIt dependswater capacity of a private swimming pool; a depth of more than two feet also triggers the permitGeneral Fee Schedule effective January 2, 2014, item C(4) "Swimming pools (private/residential)", minimum fee $50.00
Roof Replacement PermitIt dependsshare of the roof whose shingles are replaced, where the replacement is in the same materialSee schedule
Shed PermitPermit requiredAny sizeSee schedule
Solar PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an HVAC permit in Cleveland?
Yes, before installing, replacing, repairing, altering, resetting, converting or moving a furnace, boiler, central air conditioning or refrigeration system, fireplace or wood burning stove, and before new, extended or repaired ductwork, hydronic lines, control wiring or fuel gas piping. If you are unsure how that applies to your project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910 before you start.
How much does an HVAC permit cost in Cleveland?
The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the City of Cleveland Department of Building and Housing, Division of Construction Permitting at 216.664.2910.
Where do you apply for an HVAC permit in Cleveland?
You can apply through the Cleveland permit portal or contact the City of Cleveland Department of Building and Housing, Division of Construction Permitting directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in Cleveland?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Cleveland applies this before you apply.

From the Library

HVAC Permit in other Ohio localities

Everything above, sourced

How this HVAC permit page for Cleveland was verified. 2 official sources: clevelandohio.gov, clevelandohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Cleveland Department of Building and Housing, Division of Construction Permitting. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page