Shed Permit in Franklin County, Ohio
Permit required
Yes, a permit is required
Before building or placing a shed, pole barn, detached garage or other accessory structure.
Quick answer
A permit is always required for a shed in unincorporated Franklin County, and the size only decides which one. A Certificate of Zoning Compliance is required for any detached accessory structure, and the county's Planning and Zoning FAQ names storage sheds and detached garages among the projects that need one. On top of that, the Building Department requires a building permit once the accessory structure is larger than 200 square feet, which matches the Residential Code of Ohio exemption for one-story detached tool and storage sheds. Zoning approval comes from Franklin County EDP in the ten townships it zones and from the township or village elsewhere, but the building permit always comes from the county.
- Issued by
- Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department
- Phone
- 614-525-3166
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
If a contractor builds or places your shed, they usually handle any required permit. Compare a few bids before you commit.
Compare contractor quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What a shed permit costs in Franklin County
- Fee schedule in force
- Official scheduleRead .
- Published in
- Franklin County EDP Fee Schedule, 'Effective Jan. 1, 2014':
- Building Permit Fees, 'Base Fee (first 1000 sq. ft.) $120.00' and 'Plus: Each 100 sq. ft. thereafter $10.00';
- Penalty Fees, 'Initial Plan Review $50.00';
- footnote '* Does not include 1% State Building Permit Surcharge'. Zoning Fees on the same schedule: 'Certificate of Zoning Compliance, Residential $75.00'.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Franklin County compares in Ohio
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Cincinnati | It depends | total floor area of a shed accessory to a one-, two- or three-family dwelling |
| Cleveland | Permit required | Any size |
| Columbus | It depends | shed under 200 sq ft does not require a permit; shed 200 sq ft or larger requires a permit and plan review |
| Franklin Countythis page | Permit required | Any size |
How to apply in Franklin County
General guide, not specific to this office
What a shed permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a shed permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department
- Franklin County Building Department, 142 S. Front St., Columbus, OH 43215 (the Economic Development and Planning Department offices, where zoning applications are filed, are at 150 South Front Street, FSL Suite 10, Columbus, OH 43215-7104)
- Phone: 614-525-3166
- Email: building@franklincountyohio.gov
Your Shed Permit checklist for Franklin County
- Confirm the requirement. Yes, a permit is required. Read the rule where we read it: franklincountyohio.gov: Building Permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Franklin County permit portal.
- Keep the office details handy. Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department. Phone: 614-525-3166. Email: building@franklincountyohio.gov. Address: Franklin County Building Department, 142 S. Front St., Columbus, OH 43215 (the Economic Development and Planning Department offices, where zoning applications are filed, are at 150 South Front Street, FSL Suite 10, Columbus, OH 43215-7104).
Compiled from the official sources on this page. Last checked .
Permitting activity in Franklin County
In 2025, Franklin County authorized permits for 10,494 new residential housing units (1,829 single-family, 8,665 in multi-family buildings), valued at $1.8B, up from 8,122 the year before. That works out to about 7.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,361,536.
What else needs a permit in Franklin County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
None of the 9 project types verified for Franklin County carry a size or scope threshold. See the Permit needed column for each project's own answer, since there is no threshold to compare here.
| Project | Permit needed? | Typical fee |
|---|---|---|
| Deck Permit | Permit required | See schedule |
| Electrical Permit | Permit required | See schedule |
| Fence Permit | Permit required | See schedule |
| HVAC Permit | Permit required | See schedule |
| Patio Permit | Permit required | See schedule |
| Plumbing Permit | Permit required | See schedule |
| Pool Permit | Permit required | See schedule |
| Roof Replacement Permit | Permit required | See schedule |
| Solar Permit | Permit required | See schedule |
Frequently asked questions
- Do you need a shed permit in Franklin County?
- Yes, before building or placing a shed, pole barn, detached garage or other accessory structure. If you are unsure how that applies to your project, call the permit office at 614-525-3166 before you start.
- How much does a shed permit cost in Franklin County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the permit office at 614-525-3166.
- How long does a shed permit take in Franklin County?
- Building permits are issued 7 to 10 days after full plan approval for properties with access to public water and sewer. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a shed permit in Franklin County?
- You can apply through the Franklin County permit portal or contact the Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Franklin County?
- Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. 4740.01(F)): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. R.C. Chapter 4740's statewide licenses for electrical, HVAC, plumbing, refrigeration and hydronics contractors apply to 'construction projects', which R.C. 4740.01(F) defines to exclude residential buildings as defined in R.C. 3781.06, so that licensing does not reach one-, two-, or three-family home construction. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Franklin County applies this before you apply.
From the Library
Shed Permit in other Ohio localities
Everything above, sourced
How this shed permit page for Franklin County was verified. 2 official sources: franklincountyohio.gov, franklincountyohio.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page