Permit required

Yes, a permit is required

Before building or placing a shed, pole barn, detached garage or other accessory structure.

From an official source Verified Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department

By Mario Bailey, verified against official sources

Quick answer

A permit is always required for a shed in unincorporated Franklin County, and the size only decides which one. A Certificate of Zoning Compliance is required for any detached accessory structure, and the county's Planning and Zoning FAQ names storage sheds and detached garages among the projects that need one. On top of that, the Building Department requires a building permit once the accessory structure is larger than 200 square feet, which matches the Residential Code of Ohio exemption for one-story detached tool and storage sheds. Zoning approval comes from Franklin County EDP in the ten townships it zones and from the township or village elsewhere, but the building permit always comes from the county.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

Before building or placing a shed, pole barn, detached garage or other accessory structure.

What a shed permit costs in Franklin County

Line item
shed permitBy formulaFranklin County EDP Fee Schedule, 'Effective Jan. 1, 2014': Building Permit Fees, 'Base Fee (first 1000 sq. ft.) $120.00' and 'Plus: Each 100 sq. ft. thereafter $10.00'; Penalty Fees, 'Initial Plan Review $50.00'; footnote '* Does not include 1% State Building Permit Surcharge'. Zoning Fees on the same schedule: 'Certificate of Zoning Compliance, Residential $75.00'.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Franklin County compares in Ohio

JurisdictionPermit needed?Threshold
CincinnatiIt dependstotal floor area of a shed accessory to a one-, two- or three-family dwelling
ClevelandPermit requiredNot specified
ColumbusIt dependsshed under 200 sq ft does not require a permit; shed 200 sq ft or larger requires a permit and plan review
Franklin Countythis pagePermit requiredNot specified

How to apply in Franklin County

A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.

What most shed permit applications include:

  • A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
  • A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
  • Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
  • Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
  • Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).

General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department sets the exact checklist for Franklin County.

Where to apply in Franklin County:

Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department

  • Franklin County Building Department, 142 S. Front St., Columbus, OH 43215 (the Economic Development and Planning Department offices, where zoning applications are filed, are at 150 South Front Street, FSL Suite 10, Columbus, OH 43215-7104)
  • Phone: 614-525-3166
  • Email: building@franklincountyohio.gov

Inspections and closing out your permit

A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.

  1. Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
  2. Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
  3. Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
  4. For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Franklin County permit portal or by phone at 614-525-3166.

Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a shed permit in Franklin County?
A permit is always required for a shed in unincorporated Franklin County, and the size only decides which one. A Certificate of Zoning Compliance is required for any detached accessory structure, and the county's Planning and Zoning FAQ names storage sheds and detached garages among the projects that need one. On top of that, the Building Department requires a building permit once the accessory structure is larger than 200 square feet, which matches the Residential Code of Ohio exemption for one-story detached tool and storage sheds. Zoning approval comes from Franklin County EDP in the ten townships it zones and from the township or village elsewhere, but the building permit always comes from the county. Always confirm with the Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department before starting.
How much does a shed permit cost in Franklin County?
Franklin County EDP Fee Schedule, 'Effective Jan. 1, 2014': Building Permit Fees, 'Base Fee (first 1000 sq. ft.) $120.00' and 'Plus: Each 100 sq. ft. thereafter $10.00'; Penalty Fees, 'Initial Plan Review $50.00'; footnote '* Does not include 1% State Building Permit Surcharge'. Zoning Fees on the same schedule: 'Certificate of Zoning Compliance, Residential $75.00'. See the official fee schedule for current amounts.
How long does a shed permit take in Franklin County?
Building permits are issued 7 to 10 days after full plan approval for properties with access to public water and sewer. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a shed permit in Franklin County?
You can apply through the Franklin County permit portal or contact the Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department directly. The links are listed on this page.
Can a homeowner pull a shed permit themselves in Franklin County?
Under Ohio law (OAC 4101:8-1-01 Section 105.1; R.C. 3791.04(A)(1)(b); R.C. Chapter 4740): Ohio has no statewide general contractor license, so the Residential Code of Ohio names the property owner directly as an authorized permit applicant: an owner or authorized agent who intends to construct, alter, repair, or change the occupancy of a residential building must first make application to the local certified building department and obtain approval, meaning a homeowner may pull their own permit and act as their own contractor. Certain specialty trades, HVAC, refrigeration, and hydronics contractors, are separately licensed statewide under R.C. Chapter 4740, and no homeowner exemption from that licensing requirement could be found in the chapter's text. In a county, township, or municipality with no residential building department certified by the state Board of Building Standards, R.C. 3791.04(A)(1)(b) and the Residential Code of Ohio's administrative rule both say the owner is not required to submit construction documents, seek approval, request inspections, or obtain a certificate of occupancy at all, which removes the state permitting framework, and with it the owner-builder question, in those jurisdictions. Confirm how Franklin County applies this before you apply.

From the Library

What else needs a permit in Franklin County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedFranklin County EDP Fee Schedule, 'Effective Jan.
Electrical PermitPermit requiredNot specifiedConfirm the current fee with the City of Columbus before relying on county figures.
Fence PermitPermit requiredNot specifiedFranklin County Economic Development and Planning Department Fee Schedule, 'Effective Jan.
HVAC PermitPermit requiredNot specifiedFranklin County EDP Fee Schedule, 'Effective Jan.
Patio PermitPermit requiredNot specifiedFranklin County EDP Fee Schedule, 'Effective Jan.
Plumbing PermitPermit requiredNot specifiedFranklin County Public Health publishes no figure on its plumbing page beyond 'The costs...
Pool PermitPermit requiredNot specifiedFranklin County EDP Fee Schedule, 'Effective Jan.
Roof Replacement PermitPermit requiredNot specifiedFranklin County EDP Fee Schedule, 'Effective Jan.
Solar PermitPermit requiredNot specifiedSummary of PV Systems Form Fees, published by Franklin County EDP: Certificate of Zoning...

Shed Permit in other Ohio localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Franklin County documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with Franklin County Building Department (Division of Building), Franklin County Economic Development and Planning Department. Rules change; confirm before you build. How we verify.