Electrical Permit in Palm Beach County, Florida
It depends
Sometimes, depending on the project
For new wiring, service changes and other electrical work beyond the like for like replacements the county lists as needing no permit
Quick answer
Palm Beach County's amendments to the Florida Building Code require a permit to install, enlarge, alter, repair, remove, convert or replace electrical work, and the county lists Electric Service Change as a Type 1 building permit for 1 and 2 unit residences. The county's Items Not Requiring a Permit brochure lists like for like replacement of light fixtures in an existing lighting outlet (1 and 2 family dwellings only), replacing an existing outlet or switch within the existing junction box, and replacing an existing ceiling fan using the existing fan box and wiring. Electrical work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value.
- Typical threshold
- Installing, altering or replacing electrical work needs a permit. The county lists like for like light fixture replacement in an existing lighting outlet, replacing an existing outlet or switch within the existing junction box, and replacing a ceiling fan using the existing fan box and wiring as items not requiring a permit.
- Issued by
- Palm Beach County Planning, Zoning & Building Department, Building Division
- Phone
- (561) 233-5100
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Palm Beach County
- Fee schedule in force
- Official scheduleRead .
Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How Palm Beach County compares in Florida
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Alachua County | Permit required | Any size |
| Brevard County | It depends | Permits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring. |
| Broward County | Permit required | Any size |
| Charlotte County | Permit required | Any size |
| Clay County | Permit required | Any size |
| Collier County | Permit required | Permits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices. |
| Palm Beach Countythis page | It depends | Installing, altering or replacing electrical work needs a permit. The county lists like for like light fixture replacement in an existing lighting outlet, replacing an existing outlet or switch within the existing junction box, and replacing a ceiling fan using the existing fan box and wiring as items not requiring a permit. |
How to apply in Palm Beach County
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
Palm Beach County Planning, Zoning & Building Department, Building Division
- 2300 N. Jog Road, West Palm Beach, FL 33411
- Phone: (561) 233-5100
Your Electrical Permit checklist for Palm Beach County
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Installing, altering or replacing electrical work needs a permit. The county lists like for like light fixture replacement in an existing lighting outlet, replacing an existing outlet or switch within the existing junction box, and replacing a ceiling fan using the existing fan box and wiring as items not requiring a permit. Read the rule where we read it: discover.pbcgov.org: permit types.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Palm Beach County permit portal.
- Keep the office details handy. Palm Beach County Planning, Zoning & Building Department, Building Division. Phone: (561) 233-5100. Address: 2300 N. Jog Road, West Palm Beach, FL 33411.
Compiled from the official sources on this page. Last checked .
Permitting activity in Palm Beach County
In 2025, Palm Beach County authorized permits for 4,228 new residential housing units (2,495 single-family, 1,733 in multi-family buildings), valued at $1.7B, up from 4,089 the year before. That works out to about 2.7 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 1,575,726.
What else needs a permit in Palm Beach County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Any size | Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule |
| Fence Permit | Permit required | Any size | Flat $125 fee for a residential fence permit, per the PZB Building Division fee schedule |
| HVAC Permit | It depends | A new air conditioning system and an A/C change-out need a permit. Replacing an existing window unit on an existing dedicated electrical outlet, repairing an existing system, and replacing any part that does not alter the system listing or make it unsafe are listed as not requiring a permit. | Charged by value of construction with a $75 minimum for a new HVAC system with duct work, per the PZB Building Division fee schedule |
| Patio Permit | It depends | Sand-set pavers that are not a pool or spa deck and not within five feet of a pool need no permit (1 and 2 family dwellings, excluding driveways or turnouts). A slab that is not for a future structure, has no footers and is not within 5 feet of a pool needs only a zoning Site Plan Review Permit. The county's list does not say which permit any other slab needs; it sends unlisted work to the Permit Center Help Desk at 561-233-5120. | Charged by value of construction with a $75 minimum for a single family, duplex or townhouse patio or porch enclosure; the schedule has the rest |
| Plumbing Permit | Permit required | Any size | Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule |
| Pool Permit | It depends | Portable or manufactured pools and spas less than 24 inches deep need no permit; all in-ground pools, larger above-ground pools, and spas require a Building Permit (Type 3(E) for 1 and 2 unit dwellings) plus applicable electrical, plumbing, and pool-barrier sub-permits, and must satisfy Florida's residential pool safety-feature requirements under F.S. 515.27 before final inspection. | Charged by value of construction with a $75 minimum for a site-built in-ground residential pool, per the PZB Building Division fee schedule |
| Roof Replacement Permit | Permit required | The state exemption for work valued at less than $7,500 does not apply in Palm Beach County: the county says all of Palm Beach County is designated a flood hazard area under the Florida Building Code. | Charged by value of construction with a $75 minimum for reroofing a single family, duplex or attached residence, per the PZB Building Division fee schedule |
| Shed Permit | Permit required | An accessory enclosure (shed) of at most 6 ft x 6 ft x 6 ft high, for a single-family dwelling only, needs only a Type 1 Site Plan Review Permit (zoning review, exempt from inspection and Building Code review). Larger sheds need a building permit. | Accessory Bldg under 36 sq ft site-built or prefab: $50 flat fee |
| Solar Permit | Permit required | Any size | Charged by value of construction with a $75 minimum for a solar photovoltaic system, per the PZB Building Division fee schedule |
Frequently asked questions
- Do you need an electrical permit in Palm Beach County?
- It depends on the project. Installing, altering or replacing electrical work needs a permit. The county lists like for like light fixture replacement in an existing lighting outlet, replacing an existing outlet or switch within the existing junction box, and replacing a ceiling fan using the existing fan box and wiring as items not requiring a permit. If you are unsure how that applies to your project, call the Palm Beach County Planning, Zoning & Building Department, Building Division at (561) 233-5100 before you start.
- How much does an electrical permit cost in Palm Beach County?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 11 Nov 2026. For the figure on your own project, call the Palm Beach County Planning, Zoning & Building Department, Building Division at (561) 233-5100.
- Where do you apply for an electrical permit in Palm Beach County?
- You can apply through the Palm Beach County permit portal or contact the Palm Beach County Planning, Zoning & Building Department, Building Division directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Palm Beach County?
- Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Palm Beach County applies this before you apply.
From the Library
Electrical Permit in other Florida localities
Everything above, sourced
How this electrical permit page for Palm Beach County was verified. 3 official sources: discover.pbcgov.org, discover.pbcgov.org, discover.pbcgov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Palm Beach County Planning, Zoning & Building Department, Building Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page