Florida / Palm Beach County

Electrical Permit in Palm Beach County, Florida

By Mario Bailey Last checked 2026-07-06 · 2 official sources

Verified against official sources Confirmed on official page

Permit required

Quick answer

An electrical permit is required in unincorporated Palm Beach County for new wiring, electric service changes, and other residential electrical work. 'Electric Service Change' and low-voltage electric work are listed as their own Type 1 Building Permits for 1 and 2 unit residences in the county's Permit Application Types guide, with general 'Electrical, General' work listed as a Type 2 permit for larger projects. Electrical work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help

Tell us where your project stands. Free to ask; no obligation.

Where we have a vetted local pro who handles permits in Palm Beach County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.

When a permit is usually needed

For new wiring, service-panel changes, and other residential electrical work

What electrical permit costs in Palm Beach County

Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule.

Official fee schedule

How Palm Beach County compares in Florida

No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Broward CountyPermit requiredElectrical permit is the greater of a $125 minimum base fee or 3.0% of job va...
Hillsborough CountyPermit requiredResidential Electrical (General) trade permit fee is $130 flat for inspection...
Lee CountyPermit requiredFee schedule effective 2026-04-15: $50 application fee and $35 technology fee...
Miami-Dade CountyPermit requiredResidential wiring for new construction, additions, repairs and alterations i...
Orange CountyPermit requiredMinimum Electrical Permit fee is $38 flat, scaling with service amperage for...
Palm Beach Countythis pagePermit requiredCharged by value of construction with a $75 minimum, per the PZB Building Div...
Pasco CountyIt dependsBase fee $45;

How to apply in Palm Beach County

In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Palm Beach County Planning, Zoning & Building Department, Building Division sets the exact checklist for Palm Beach County.

Where to apply in Palm Beach County:

Palm Beach County Planning, Zoning & Building Department, Building Division

  • 2300 N. Jog Road, West Palm Beach, FL 33411
  • Phone: (561) 233-5100

Inspections and closing out your permit

Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Palm Beach County permit portal or by phone at (561) 233-5100.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a electrical permit in Palm Beach County?
An electrical permit is required in unincorporated Palm Beach County for new wiring, electric service changes, and other residential electrical work. 'Electric Service Change' and low-voltage electric work are listed as their own Type 1 Building Permits for 1 and 2 unit residences in the county's Permit Application Types guide, with general 'Electrical, General' work listed as a Type 2 permit for larger projects. Electrical work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value. Always confirm with the Palm Beach County Planning, Zoning & Building Department, Building Division before starting.
How much does a electrical permit cost in Palm Beach County?
Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule. See the official fee schedule for current amounts.
Where do you apply for a electrical permit in Palm Beach County?
You can apply through the Palm Beach County permit portal or contact the Palm Beach County Planning, Zoning & Building Department, Building Division directly. The links are listed on this page.

From the Library

What else needs a permit in Palm Beach County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum, per the PZB Building Division fee...
Fence PermitPermit requiredNot specifiedFlat $125 fee for a residential fence permit, per the PZB Building Division fee schedule
HVAC PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum for a new HVAC system with duct wor...
Patio PermitIt dependsNot specifiedCharged by value of construction with a $75 minimum for a single family, duplex or town...
Plumbing PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum, per the PZB Building Division fee...
Pool PermitIt dependsPortable or manufactured pools and spas less than 24 inches deep need no permit; all in-ground pools, larger above-ground pools, and spas require a Building Permit (Type 3(E) for 1 and 2 unit dwellings) plus applicable electrical, plumbing, and pool-barrier sub-permits, and must satisfy Florida's residential pool safety-feature requirements under F.S. 515.27 before final inspection.Charged by value of construction with a $75 minimum for a site-built in-ground resident...
Roof Replacement PermitIt dependsNon-structural roof work (e.g. roof covering only, not sheathing or framing) valued under $7,500 on a single-family home outside a special flood hazard area may qualify for a written permit-exemption request under F.S. 553.79(1)(g); electrical, plumbing, structural, mechanical, and gas work are excluded regardless of value; structural roof work or any project at or above $7,500 requires a standard Type 1 Building Permit ('Reroofing') with dry-in and final inspections.Charged by value of construction with a $75 minimum for reroofing a single family, dupl...
Shed PermitPermit requiredAccessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections.Accessory Bldg under 36 sq ft site-built or prefab: $50 flat fee;
Solar PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum for a solar photovoltaic system, pe...

Electrical Permit in other Florida localities

Official sources

Verified by a person against the sources above on 2026-07-06, not confirmed with Palm Beach County Planning, Zoning & Building Department, Building Division. Rules change; confirm before you build. How we verify.

Last checked: 2026-07-06Report an error on this page

Compare Electrical Permit requirements across Florida localities