Florida / Palm Beach County

Electrical Permit in Palm Beach County, Florida

Permit required

Yes, a permit is required

For new wiring, service-panel changes, and other residential electrical work

Confirmed on official page Verified

Issued byPalm Beach County Planning, Zoning & Building Department, Building Division

By Mario Bailey, verified against official sources

Quick answer

An electrical permit is required in unincorporated Palm Beach County for new wiring, electric service changes, and other residential electrical work. 'Electric Service Change' and low-voltage electric work are listed as their own Type 1 Building Permits for 1 and 2 unit residences in the county's Permit Application Types guide, with general 'Electrical, General' work listed as a Type 2 permit for larger projects. Electrical work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value.

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

For new wiring, service-panel changes, and other residential electrical work

What an electrical permit costs in Palm Beach County

Line item
electrical permitBy formulaCharged by value of construction with a $75 minimum, per the PZB Building Division fee schedule.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Palm Beach County compares in Florida

JurisdictionPermit needed?Threshold
Alachua CountyPermit requiredNot specified
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.
Broward CountyPermit requiredNot specified
Charlotte CountyPermit requiredNot specified
Clay CountyPermit requiredNot specified
Collier CountyPermit requiredPermits shall not be required for the following: ... Electrical: 1. Repair work performed by licensed electrical contractors that does not exceed $1,500.00 in value of materials and labor. 2. Repair or replace existing light fixtures and ceiling fans. 3. Repair or replace electrical wall switches and wall outlet devices of 20 amps or less and 120 volts. 4. Repair/replace low voltage (under 77 volts) devices.
Palm Beach Countythis pagePermit requiredNot specified

How to apply in Palm Beach County

In Palm Beach County, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.

What most electrical permit applications include:

  • Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
  • For Palm Beach County, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
  • For Palm Beach County, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
  • Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
  • Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).

General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Palm Beach County Planning, Zoning & Building Department, Building Division sets the exact checklist for Palm Beach County.

Where to apply in Palm Beach County:

Palm Beach County Planning, Zoning & Building Department, Building Division

  • 2300 N. Jog Road, West Palm Beach, FL 33411
  • Phone: (561) 233-5100

Electrical Permit in Palm Beach County compared with nearby Florida localities

LocalityPermit needed?ThresholdWhat each Florida schedule saysVerified
Palm Beach CountyPermit requiredNot specifiedCharged by value of construction with a $75 minimum, per the PZB Building Division fee...
Alachua CountyPermit requiredNot specifiedNo electrical-specific flat fee is published
Brevard CountyIt dependsPermits are required for the installation or replacement of electrical wiring, meter cans, and breaker panels; this does not include changing fixtures that do not require moving or changing wiring.Brevard's Residential Electrical Permit Application fee table lists a Building Code...
Broward CountyPermit requiredNot specifiedElectrical permit is the greater of a $125 minimum base fee or 3.0% of job value, per...
Charlotte CountyPermit requiredNot specifiedAt application: flat fee $90, plus a building fee of 0.004 x ICC valuation (if valuation...

Inspections and closing out your permit

In Palm Beach County, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.

  1. In Palm Beach County: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
  2. In Palm Beach County: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
  3. In Palm Beach County: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
  4. In Palm Beach County: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
  5. In Palm Beach County: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
  6. In Palm Beach County: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
  7. In Palm Beach County: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Palm Beach County permit portal or by phone at (561) 233-5100.

Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need an electrical permit in Palm Beach County?
An electrical permit is required in unincorporated Palm Beach County for new wiring, electric service changes, and other residential electrical work. 'Electric Service Change' and low-voltage electric work are listed as their own Type 1 Building Permits for 1 and 2 unit residences in the county's Permit Application Types guide, with general 'Electrical, General' work listed as a Type 2 permit for larger projects. Electrical work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value. Always confirm with the Palm Beach County Planning, Zoning & Building Department, Building Division before starting.
How much does an electrical permit cost in Palm Beach County?
Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule. See the official fee schedule for current amounts.
Where do you apply for an electrical permit in Palm Beach County?
You can apply through the Palm Beach County permit portal or contact the Palm Beach County Planning, Zoning & Building Department, Building Division directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in Palm Beach County?
Under Florida law (F.S. 489.103(7)(a)-(c)): Florida lets you pull your own permit as an owner-builder under section 489.103(7), Florida Statutes, which exempts property owners from the contractor licensing law when they act as their own contractor and provide direct, onsite supervision of all work not performed by licensed contractors. The exemption covers building or improving a one-family or two-family residence or a farm outbuilding for your own occupancy or use, and commercial buildings only up to a $75,000 cost, and the property may not be built or improved for sale or lease. If you sell or lease the property within 1 year after completing the work, the law presumes it was built for sale or lease, which violates the exemption. To qualify, you must personally appear and sign the building permit application and sign a state-prescribed disclosure statement acknowledging that you are the party legally and financially responsible for the construction, that you must provide direct, onsite supervision, and that unlicensed people you use must be your own employees, bringing federal tax withholding and workers' compensation obligations. You may not hire an unlicensed person to act as your contractor and may not delegate supervision to anyone who is not licensed for the work being done; if these requirements are violated, the local permitting agency shall withhold final approval, revoke the permit, or pursue unlicensed-activity remedies. A separate narrow branch of the exemption also lets an owner take over and complete a permit on a one-family or two-family residence when the original contractor substantially completed the project. Confirm how Palm Beach County applies this before you apply.

From the Library

What else needs a permit in Palm Beach County

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum, per the PZB Building Division fee...
Fence PermitPermit requiredNot specifiedFlat $125 fee for a residential fence permit, per the PZB Building Division fee schedule
HVAC PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum for a new HVAC system with duct...
Patio PermitIt dependsNot specifiedCharged by value of construction with a $75 minimum for a single family, duplex or...
Plumbing PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum, per the PZB Building Division fee...
Pool PermitIt dependsPortable or manufactured pools and spas less than 24 inches deep need no permit; all in-ground pools, larger above-ground pools, and spas require a Building Permit (Type 3(E) for 1 and 2 unit dwellings) plus applicable electrical, plumbing, and pool-barrier sub-permits, and must satisfy Florida's residential pool safety-feature requirements under F.S. 515.27 before final inspection.Charged by value of construction with a $75 minimum for a site-built in-ground...
Roof Replacement PermitIt dependsNon-structural roof work (e.g. roof covering only, not sheathing or framing) valued under $7,500 on a single-family home outside a special flood hazard area may qualify for a written permit-exemption request under F.S. 553.79(1)(g); electrical, plumbing, structural, mechanical, and gas work are excluded regardless of value; structural roof work or any project at or above $7,500 requires a standard Type 1 Building Permit ('Reroofing') with dry-in and final inspections.Charged by value of construction with a $75 minimum for reroofing a single family...
Shed PermitPermit requiredAccessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections.Accessory Bldg under 36 sq ft site-built or prefab: $50 flat fee
Solar PermitPermit requiredNot specifiedCharged by value of construction with a $75 minimum for a solar photovoltaic system, per...

Electrical Permit in other Florida localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Palm Beach County documents; the office above sets the local rules.

How this electrical permit page for Palm Beach County was verified. 2 official sources: discover.pbcgov.org, discover.pbcgov.org; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Palm Beach County Planning, Zoning & Building Department, Building Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page