Plumbing Permit in Palm Beach County, Florida
By Mario Bailey Last checked 2026-07-06 · 2 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
A plumbing permit is required in unincorporated Palm Beach County for new water and sewer service connections, site work, and other plumbing installations and modifications. 'Water Service Connection' and 'Sewer Connection' are listed as their own Type 1 Building Permits for 1 and 2 unit residences in the county's Permit Application Types guide. Minor repairs such as an exact-replacement faucet, sink, or water closet in the same location are separately exempted under the county's Items Not Requiring a Permit brochure. Plumbing work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Palm Beach County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
For new water or sewer service, site work, or other plumbing installations and modifications
What plumbing permit costs in Palm Beach County
Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule.
How Palm Beach County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Broward County | Permit required | Plumbing permit is the greater of a $125 minimum base fee or 3.0% of job valu... |
| Hillsborough County | Permit required | Residential Plumbing (General) trade permit fee is $130 flat, inspection-only... |
| Lee County | Permit required | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee... |
| Miami-Dade County | Permit required | Single family plumbing for new construction, additions or alterations is $0.1... |
| Orange County | Permit required | Base Plumbing Permit fee for new construction, addition or alteration is $75... |
| Palm Beach Countythis page | Permit required | Charged by value of construction with a $75 minimum, per the PZB Building Div... |
| Pasco County | It depends | Base fee $45; |
How to apply in Palm Beach County
You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit.
What most plumbing permit applications include:
- A permit is required before any owner or authorized agent constructs, alters, repairs, removes, converts, or replaces a plumbing system regulated by the code (IRC R105.1).
- The application must identify and describe the work, describe the site, state the intended use and occupancy, and be signed by the applicant or an authorized agent (IRC R105.3).
- Two or more sets of construction documents must accompany the application, drawn with enough clarity to show the location, nature, and extent of the proposed plumbing work and how it will conform to code (IRC R106.1, R106.1.1).
- Minor plumbing repairs, such as clearing a stoppage or removing and resetting a water closet without rearranging pipes or fixtures, are exempt from permit (IRC R105.2).
- Once issued, a permit is only valid for a limited window, commonly 180 days, and becomes invalid if the work is not started or is abandoned within that time, though extensions can be requested (IRC R105.3.2, R105.5).
General submittal guidance from 2021 International Residential Code (IRC), Chapter 1 Scope and Administration, Sections R105 Permits and R106 Construction Documents. Source. Palm Beach County Planning, Zoning & Building Department, Building Division sets the exact checklist for Palm Beach County.
Where to apply in Palm Beach County:
Palm Beach County Planning, Zoning & Building Department, Building Division
- 2300 N. Jog Road, West Palm Beach, FL 33411
- Phone: (561) 233-5100
Inspections and closing out your permit
Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
- Piping and equipment placed under a slab or floor must be in place and inspected before any concrete is poured or floor sheathing is installed over it (IRC R109.1.1.1).
- Rough plumbing, along with the mechanical, gas, and electrical rough-in, must be inspected prior to covering or concealment and before fixtures or appliances are set (IRC R109.1.2).
- Rough drain, waste, and vent (DWV) piping is tested with water, air, or (for plastic piping) a vacuum, and must show no evidence of leakage before it is closed in (IRC P2503.5.1).
- The water-distribution piping is tested and must hold tight under the system's working pressure, or under a 50 psi air test for non-plastic piping, before it is concealed (IRC P2503.7).
- The framing inspection cannot proceed until the plumbing rough inspection, along with the mechanical and electrical rough inspections, has been approved (IRC R109.1.4).
- At the final drainage test, each fixture is filled and then drained, and its traps and fixture connections must prove watertight by visual inspection (IRC P2503.5.2).
- Final inspection is made after all work required by the permit is complete, and includes confirming backflow protection, such as vacuum breakers on hose bibbs, is installed (IRC R109.1.6, P2902.4.3).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Palm Beach County permit portal or by phone at (561) 233-5100.
Inspection sequence from 2021 International Residential Code (IRC), Section R109 Inspections and Section P2503 Inspection and Tests. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Plumbing Permit checklist for Palm Beach County
- Confirm the requirement. Yes, a permit is required. Usually needed: For new water or sewer service, site work, or other plumbing installations and modifications.
- Budget the fee. Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule. Official fee schedule.
- Apply. You apply for a residential plumbing permit at your local building department by filing an application that describes the scope of work and site, along with construction documents, before any regulated plumbing installation, alteration, or repair begins. Minor repairs that do not touch piping or fixtures are generally exempt, and once issued the permit only stays valid if work is started within its time limit. Start at the Palm Beach County permit portal.
- Keep the office details handy. Palm Beach County Planning, Zoning & Building Department, Building Division. Phone: (561) 233-5100. Address: 2300 N. Jog Road, West Palm Beach, FL 33411.
- Plan for inspections. Plumbing inspections are timed to whatever is about to hide the pipe: underground and under-slab piping is checked before concrete covers it, rough-in piping is pressure or water tested before walls close up, and a final inspection checks every fixture and backflow protection once the work is complete.
Compiled from the official sources on this page. Last checked 2026-07-06.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a plumbing permit in Palm Beach County?
- A plumbing permit is required in unincorporated Palm Beach County for new water and sewer service connections, site work, and other plumbing installations and modifications. 'Water Service Connection' and 'Sewer Connection' are listed as their own Type 1 Building Permits for 1 and 2 unit residences in the county's Permit Application Types guide. Minor repairs such as an exact-replacement faucet, sink, or water closet in the same location are separately exempted under the county's Items Not Requiring a Permit brochure. Plumbing work is excluded from Florida's HB 803 $7,500 permit exemption regardless of project value. Always confirm with the Palm Beach County Planning, Zoning & Building Department, Building Division before starting.
- How much does a plumbing permit cost in Palm Beach County?
- Charged by value of construction with a $75 minimum, per the PZB Building Division fee schedule. See the official fee schedule for current amounts.
- Where do you apply for a plumbing permit in Palm Beach County?
- You can apply through the Palm Beach County permit portal or contact the Palm Beach County Planning, Zoning & Building Department, Building Division directly. The links are listed on this page.
From the Library
What else needs a permit in Palm Beach County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum, per the PZB Building Division fee... |
| Electrical Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum, per the PZB Building Division fee... |
| Fence Permit | Permit required | Not specified | Flat $125 fee for a residential fence permit, per the PZB Building Division fee schedule |
| HVAC Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum for a new HVAC system with duct wor... |
| Patio Permit | It depends | Not specified | Charged by value of construction with a $75 minimum for a single family, duplex or town... |
| Pool Permit | It depends | Portable or manufactured pools and spas less than 24 inches deep need no permit; all in-ground pools, larger above-ground pools, and spas require a Building Permit (Type 3(E) for 1 and 2 unit dwellings) plus applicable electrical, plumbing, and pool-barrier sub-permits, and must satisfy Florida's residential pool safety-feature requirements under F.S. 515.27 before final inspection. | Charged by value of construction with a $75 minimum for a site-built in-ground resident... |
| Roof Replacement Permit | It depends | Non-structural roof work (e.g. roof covering only, not sheathing or framing) valued under $7,500 on a single-family home outside a special flood hazard area may qualify for a written permit-exemption request under F.S. 553.79(1)(g); electrical, plumbing, structural, mechanical, and gas work are excluded regardless of value; structural roof work or any project at or above $7,500 requires a standard Type 1 Building Permit ('Reroofing') with dry-in and final inspections. | Charged by value of construction with a $75 minimum for reroofing a single family, dupl... |
| Shed Permit | Permit required | Accessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections. | Accessory Bldg under 36 sq ft site-built or prefab: $50 flat fee; |
| Solar Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum for a solar photovoltaic system, pe... |
Plumbing Permit in other Florida localities
Official sources
Verified by a person against the sources above on 2026-07-06, not confirmed with Palm Beach County Planning, Zoning & Building Department, Building Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-06Report an error on this page
Compare Plumbing Permit requirements across Florida localities
Permit office
Palm Beach County Planning, Zoning & Building Department, Building Division
(561) 233-5100Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 · 2026-07-25
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 · 2026-07-25