Solar Permit in Palm Beach County, Florida
By Mario Bailey Last checked 2026-07-06 · 3 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
A permit is required for residential solar photovoltaic installations in unincorporated Palm Beach County. The county offers an expedited SolarAPP+ review pathway: plans are approved through the SolarAPP+ platform, then the approved plan is uploaded to the ePZB portal for a self-issued permit. Solar photovoltaic permits are charged by value with a $75 minimum per the Building Division fee schedule. Electrical work, which solar installation necessarily involves, is excluded from Florida's HB 803 $7,500 permit exemption regardless of value.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Palm Beach County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Before installing any residential solar photovoltaic system
What solar permit costs in Palm Beach County
Charged by value of construction with a $75 minimum for a solar photovoltaic system, per the PZB Building Division fee schedule.
How Palm Beach County compares in Florida
No Florida jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Hillsborough County | Permit required | Residential Photovoltaic trade permit fee is $250 flat, inspection-only with... |
| Lee County | Permit required | Fee schedule effective 2026-04-15: $50 application fee and $35 technology fee... |
| Miami-Dade County | Permit required | Roof mounted solar photovoltaic systems are $365.63 per system, or $250 per s... |
| Orange County | Permit required | No dedicated solar line; |
| Palm Beach Countythis page | Permit required | Charged by value of construction with a $75 minimum for a solar photovoltaic... |
| Pasco County | Permit required | Base permit fee $45; |
| Pinellas County | Permit required | Flat fee by system type: photovoltaic systems $250 each, solar domestic water... |
How to apply in Palm Beach County
A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit.
What most solar permit applications include:
- Both a building permit and a separate electrical permit are required, since the array must be designed and installed to the residential code's solar provisions and to the National Electrical Code (IRC R324.3).
- The plan set identifies listed equipment: PV modules listed to UL 1703 (or both UL 61730-1 and UL 61730-2), and inverters listed to UL 1741, with grid-tied inverters listed for utility interaction (IRC R324.3.1).
- Structural drawings show that the roof framing is designed to structurally support the array and withstand the gravity loads it adds (IRC R324.4.1).
- The site plan lays out roof access pathways at least 36 inches wide, plus a ridge setback sized to how much of the roof the array covers, so firefighters retain pathways and ventilation access (IRC R324.6.1, IRC R324.6.2).
- The one line electrical diagram shows the rapid shutdown method and the location of its single initiation device, since one control point must bring all system conductors down to safe levels (NEC 690.12, NEC 690.56(C)).
- Interconnecting the array to the utility grid at a defined point of connection is a separate application process from the local building or electrical permit and must be approved before the system can operate (NEC 705.12).
- Some permitting offices route applications through SolarAPP+, an automated review platform that checks the plan set against code requirements and issues eligible permits instantly (DOE SolarAPP+).
General submittal guidance from IRC 2021 R324 (Solar Energy Systems) and NEC 2020 Article 690 (Solar Photovoltaic Systems) and Article 705 (Interconnected Power Production Sources). Source. Palm Beach County Planning, Zoning & Building Department, Building Division sets the exact checklist for Palm Beach County.
Where to apply in Palm Beach County:
Palm Beach County Planning, Zoning & Building Department, Building Division
- 2300 N. Jog Road, West Palm Beach, FL 33411
- Phone: (561) 233-5100
Inspections and closing out your permit
Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.
- Where an agency runs a rough or pre-inspection, it checks the array's roof penetrations while they are still exposed, confirming they are flashed and sealed (IRC R324.4.3).
- The inspector confirms whether rapid shutdown is required, how it is accomplished, and that it is properly identified (NEC 690.12, NEC 690.56(C)).
- PV disconnecting means must be permanently marked and installed where they are readily accessible, which the inspector confirms in the field (NEC 690.13).
- Bonding and grounding of the array, including every exposed non current carrying metal part and the grounding electrode system, is checked before sign off (NEC 690.43, NEC 690.47).
- At the service equipment, the inspector looks for the required rapid shutdown placard, a labeled diagram showing the initiation device's location in the specified colors and letter sizes (NEC 690.56(C)).
- Utility interconnection is inspected and approved separately from the local building department's sign off, and the system cannot be energized until both approvals are in hand (NEC 705.12).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Palm Beach County permit portal or by phone at (561) 233-5100.
Inspection sequence from NEC 2020 Article 690 (690.12 rapid shutdown, 690.13 disconnects, 690.43/690.47 grounding, 690.56 labeling) and IRC 2021 R324.4.3 (roof penetrations). Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Solar Permit checklist for Palm Beach County
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing any residential solar photovoltaic system.
- Budget the fee. Charged by value of construction with a $75 minimum for a solar photovoltaic system, per the PZB Building Division fee schedule. Official fee schedule.
- Apply. A rooftop solar PV permit application is a combined structural and electrical plan set: a site plan and roof framing details proving the array's mounting can carry its added loads, plus a one line electrical diagram covering listed modules and inverters, disconnects, and the rapid shutdown design. Utility interconnection is a separate approval that runs in parallel with the permit. Start at the Palm Beach County permit portal.
- Keep the office details handy. Palm Beach County Planning, Zoning & Building Department, Building Division. Phone: (561) 233-5100. Address: 2300 N. Jog Road, West Palm Beach, FL 33411.
- Plan for inspections. Inspectors verify the installed array against the approved plans, and some agencies run a rough check of roof attachments and penetrations while they are still exposed before the wiring and roofing close them in. The final inspection confirms rapid shutdown, disconnects, grounding, and required labels are installed correctly, and the system cannot be energized until the utility separately approves interconnection.
Compiled from the official sources on this page. Last checked 2026-07-06.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a solar permit in Palm Beach County?
- A permit is required for residential solar photovoltaic installations in unincorporated Palm Beach County. The county offers an expedited SolarAPP+ review pathway: plans are approved through the SolarAPP+ platform, then the approved plan is uploaded to the ePZB portal for a self-issued permit. Solar photovoltaic permits are charged by value with a $75 minimum per the Building Division fee schedule. Electrical work, which solar installation necessarily involves, is excluded from Florida's HB 803 $7,500 permit exemption regardless of value. Always confirm with the Palm Beach County Planning, Zoning & Building Department, Building Division before starting.
- How much does a solar permit cost in Palm Beach County?
- Charged by value of construction with a $75 minimum for a solar photovoltaic system, per the PZB Building Division fee schedule. See the official fee schedule for current amounts.
- Where do you apply for a solar permit in Palm Beach County?
- You can apply through the Palm Beach County permit portal or contact the Palm Beach County Planning, Zoning & Building Department, Building Division directly. The links are listed on this page.
From the Library
What else needs a permit in Palm Beach County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum, per the PZB Building Division fee... |
| Electrical Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum, per the PZB Building Division fee... |
| Fence Permit | Permit required | Not specified | Flat $125 fee for a residential fence permit, per the PZB Building Division fee schedule |
| HVAC Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum for a new HVAC system with duct wor... |
| Patio Permit | It depends | Not specified | Charged by value of construction with a $75 minimum for a single family, duplex or town... |
| Plumbing Permit | Permit required | Not specified | Charged by value of construction with a $75 minimum, per the PZB Building Division fee... |
| Pool Permit | It depends | Portable or manufactured pools and spas less than 24 inches deep need no permit; all in-ground pools, larger above-ground pools, and spas require a Building Permit (Type 3(E) for 1 and 2 unit dwellings) plus applicable electrical, plumbing, and pool-barrier sub-permits, and must satisfy Florida's residential pool safety-feature requirements under F.S. 515.27 before final inspection. | Charged by value of construction with a $75 minimum for a site-built in-ground resident... |
| Roof Replacement Permit | It depends | Non-structural roof work (e.g. roof covering only, not sheathing or framing) valued under $7,500 on a single-family home outside a special flood hazard area may qualify for a written permit-exemption request under F.S. 553.79(1)(g); electrical, plumbing, structural, mechanical, and gas work are excluded regardless of value; structural roof work or any project at or above $7,500 requires a standard Type 1 Building Permit ('Reroofing') with dry-in and final inspections. | Charged by value of construction with a $75 minimum for reroofing a single family, dupl... |
| Shed Permit | Permit required | Accessory storage enclosures (sheds) up to 6 ft x 6 ft x 6 ft high, for single-family dwellings only, qualify for a Type 1 Site Plan Review Permit (zoning review only, no Building Code plan review or inspection); sheds larger than that footprint or height require a standard Type 2(A) Building Permit with plan review and inspections. | Accessory Bldg under 36 sq ft site-built or prefab: $50 flat fee; |
Solar Permit in other Florida localities
Official sources
- https://discover.pbc.gov/pzb/building/Pages/solarapp.aspx
- https://discover.pbcgov.org/pzb/PDF/Fees.pdf
- https://www.leg.state.fl.us/Statutes/index.cfm?App_mode=Display_Statute&URL=0400-0499/0489/Sections/0489.103.html
- https://lci.ca.gov/docs/20190226-Solar_Permitting_Guidebook_4th_Edition.pdf
- https://www.dli.mn.gov/sites/default/files/pdf/solar_checklist.pdf
Verified by a person against the sources above on 2026-07-06, not confirmed with Palm Beach County Planning, Zoning & Building Department, Building Division. Rules change; confirm before you build. How we verify.
Last checked: 2026-07-06Report an error on this page
Permit office
Palm Beach County Planning, Zoning & Building Department, Building Division
(561) 233-5100Permit portalFlorida rule changes
- Broward County, FL updates building permit fee schedule (Ordinance 2025-038)
Ord. 2025-038 · 2026-07-25
- Florida waives permits for small single-family jobs under $7,500 (HB 803)
ch. 2026-63 (HB 803), F.S. 553.79 · 2026-07-25
Compare
Solar Permit across Florida