California / San Francisco

Electrical Permit in San Francisco, California

Permit required

Yes, a permit is required

Before installing new wiring or altering, extending or adding to an existing electrical installation.

Quick answer

San Francisco requires an electrical permit from DBI before installing new wiring or making alterations, extensions or additions to existing electrical installations. The San Francisco Electrical Code 89.121 exempts only narrow like-for-like work: replacing broken luminaires of 50 pounds or less, domestic appliances, fuses, switches and receptacles of 20 amperes or less and same-rating breakers up to 100 amperes (never the main service disconnect) where no wiring changes, plus data cable in R-3 homes. Only owners of stand-alone single-family dwellings may pull a permit to do their own electrical work, after seeing an inspector at the Permit Center.

Issued by
San Francisco Department of Building Inspection (DBI)
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in San Francisco

Fee schedule in force
Official scheduleRead .
Published in
Table 1A-E Electrical Permit Issuance and Inspection ("July 2026", fees for permits issued on and after July 12, 2026), Category 1 "General Wiring: Residential Buildings up to 10,000 sq. ft.":
  • "Up to 10 outlets and/or devices (1 inspection)" $305;
  • "11 to 20 outlets and/or devices (up to 2 inspections)" $450;
  • "Up to 40 outlets and/or devices, includes up to 200 Amp service upgrade (up to 3 inspections)" $580;
  • "More than 40 outlets and/or devices (up to 4 inspections)" $740.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How San Francisco compares in California

No California jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
Alameda CountyPermit requiredSee schedule
Contra Costa CountyPermit requiredSee schedule
Fresno CountyPermit requiredSee schedule
Los AngelesPermit requiredSee schedule
Los Angeles CountyPermit requiredSee schedule
Orange CountyPermit requiredElectrical Permit Application Flat Fee, 1 to 75 fixtures: $340 for FY 2024-25, $356 for FY 2025-26, $362 for FY 2026-27
San Franciscothis pagePermit requiredSee schedule

How to apply in San Francisco

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

San Francisco Department of Building Inspection (DBI)

What else needs a permit in San Francisco

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitPermit requiredAny sizeSee schedule
Deck PermitIt dependsheight of the deck walking surface above gradeSee schedule
EV Charger PermitIt dependsBefore installing, altering or modifying any part of the electrical system for an EV...Category 1 residential wiring applies ("Up to 10 outlets and/or devices (1 inspection)" $305)
Fence PermitIt dependsfences in a side or rear yard; the figure is 3 feet for a fence in the front yardSee schedule
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools with walls entirely above grade, accessory to a one- or two-family dwelling (Group R-3)See schedule
Roof Replacement PermitIt dependsarea reroofed in any 12-month period, with no roof sheathing installed, repaired or removedSee schedule
Shed PermitIt dependsone-story detached storage shed or playhouse; a 10-foot height limit also appliesSee schedule
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeThe residential single-unit plumbing category is "CATEGORY 1P" at $290 and "CATEGORY 11P/M" "Miscellaneous" is $320

Frequently asked questions

Do you need an electrical permit in San Francisco?
Yes, before installing new wiring or altering, extending or adding to an existing electrical installation. If you are unsure how that applies to your project, call the permit office at (628) 652-3200 before you start.
How much does an electrical permit cost in San Francisco?
The fee wording from the official schedule is in the cost table on this page, as we read it on 30 Oct 2026. For the figure on your own project, call the permit office at (628) 652-3200.
Where do you apply for an electrical permit in San Francisco?
You can apply through the San Francisco permit portal or contact the San Francisco Department of Building Inspection (DBI) directly. The links are listed on this page.
Can a homeowner pull an electrical permit themselves in San Francisco?
Under California law (Business & Professions Code 7044(a)-(b); Business & Professions Code 7031.5): California exempts an owner from contractor licensing under section 7044 when they personally perform all the work on their own property, or any work they do not perform themselves is done by their own employees paid only wages, and none of the improvements are intended or offered for sale. It also exempts an owner who directly contracts with licensed contractors for each trade, as long as no more than four of the single-family residential structures involved are intended or offered for sale in a calendar year; this route does not apply if the owner instead contracts with a general contractor for the construction. A homeowner may also improve their own principal residence without a license, as long as the work is done before any sale, they have actually resided there for the 12 months before completion, and they have not used this exemption on more than two structures more than once in any three-year period. Selling a self-built structure within one year of completion creates a rebuttable presumption that it was built for sale, which defeats the exemption, and selling five or more structures within a year makes that presumption conclusive. Separately, every city or county that requires a permit must also require the applicant to file a signed statement giving their contractor license number or the basis of their claimed exemption; a false or missing statement carries a civil penalty of up to $500. Confirm how San Francisco applies this before you apply.

From the Library

Electrical Permit in other California localities

Everything above, sourced

How this electrical permit page for San Francisco was verified. 2 official sources: sf.gov, sf.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with San Francisco Department of Building Inspection (DBI). Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page