New Hampshire / Manchester

Electrical Permit in Manchester, New Hampshire

Permit required

Yes, a permit is required

Before any new wiring, circuit, service or panel work, alteration or replacement.

Quick answer

Manchester requires an electrical permit from the Building Regulations Division for electrical work, and no work may start before the approved permit arrives. Applications are printed, signed and submitted by mail with the fee; the City does not accept them electronically. Multi-family, non-owner-occupied single-family and commercial work requires a licensed NH master electrician, while a resident owner of a single-family home may do the work under a permit with the City's homeowner form.

Issued by
Planning and Community Development Department, Building Regulations Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an electrical permit costs in Manchester

Fee schedule in force
Official scheduleRead .
Published in
Building Code §109.8 11) Electrical Wiring:
  • new one-unit residential dwelling $100.00, each additional unit $75.00;
  • residential additions, renovations, alterations, repairs or replacements, calculated cost of the work multiplied by 0.01;
  • low voltage and control wiring up to $2,000 of cost $10.00.
  • Plus the $25.00 application fee;
  • the application prints a $55.00 minimum including it.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Manchester

General guide, not specific to this office

What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Planning and Community Development Department, Building Regulations Division

  • One City Hall Plaza, West Wing, Manchester, NH 03101
  • Phone: (603) 624-6450
  • Email: pcd@manchesternh.gov

What else needs a permit in Manchester

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsfinish work only (painting, papering, tiling, carpeting, cabinets, countertops) versus plumbing, electrical or structural changesEach plus the $25.00 application fee (Building Code §109.8, adopted July 6, 2021)
Deck PermitPermit requiredAny sizeBuilding permit: estimated cost of the work multiplied by .010 (the Fees page lists decks under this line), plus the $25.00 application fee
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeBuilding permit fee under Building Code §109.8: estimated cost of the work multiplied by .010 for new structures, plus the $25.00 non-refundable application fee
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools; the IRC R105.2 item 7 depth limit Manchester left in placeBuilding permit: estimated cost of the work multiplied by .01, plus the $25.00 application fee
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeBuilding permit: estimated cost of the work multiplied by .010 (the Fees page lists sheds under this line), plus the $25.00 application fee
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an electrical permit in Manchester?
Yes, before any new wiring, circuit, service or panel work, alteration or replacement. If you are unsure how that applies to your project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450 before you start.
How much does an electrical permit cost in Manchester?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450.
How long does an electrical permit take in Manchester?
Normal processing is 3-5 business days, per the City's FAQ; approved permits are mailed. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an electrical permit in Manchester?
Apply through the Planning and Community Development Department, Building Regulations Division. The official permit page and contact details are listed on this page.
Can a homeowner pull an electrical permit themselves in Manchester?
Under New Hampshire law (RSA 155-A:4, I; RSA 319-C:15, II; RSA 153:36, I and VIII(c)): New Hampshire does not license general or residential contractors, so a homeowner may build without a contractor's license; the person responsible for the work must still get the building permit. State trade-licensing law expressly lets a homeowner do electrical work in a single family home they own and live in (or will live in), and lets a property owner do plumbing in their own single-family detached or townhouse residence, including new construction, provided the plumbing meets the state plumbing code. A homeowner may also do fuel gas fitting in an existing single family home that is their primary residence, subject to code, application and inspection requirements. No statute imposes a sale or occupancy restriction on owner-built homes. Confirm how Manchester applies this before you apply.

From the Library

Everything above, sourced

How this electrical permit page for Manchester was verified. 2 official sources: manchesternh.gov, manchesternh.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Planning and Community Development Department, Building Regulations Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project