New Hampshire / Manchester

EV Charger Permit in Manchester, New Hampshire

Permit required

Yes, a permit is required

Before installing a Level 2 charger, new 240-volt circuit or panel upgrade.

Quick answer

Manchester publishes no EV-charger permit page, so its electrical rule decides it: installing a home charger on a new or altered circuit is electrical work, which requires an electrical permit from the Building Regulations Division, priced at the calculated cost of the work times 0.01. Rentals and non-owner-occupied homes need a licensed NH master electrician. Zoning sets siting rules for charging stations, including a five-foot setback from any lot line.

Issued by
Planning and Community Development Department, Building Regulations Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

A licensed electrician typically pulls the electrical permit as part of the install. If you have not picked one yet, compare a few quotes first.

Compare electrician quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an EV charger permit costs in Manchester

Fee schedule in force
Official scheduleRead .

Electrical permit: calculated cost of the work multiplied by 0.01 (Building Code §109.8 11)A)(2)), plus the $25.00 application fee;

the application prints a $55.00 minimum including it.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Manchester

General guide, not specific to this office

What an EV charger permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an EV charger permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Planning and Community Development Department, Building Regulations Division

  • One City Hall Plaza, West Wing, Manchester, NH 03101
  • Phone: (603) 624-6450
  • Email: pcd@manchesternh.gov

What else needs a permit in Manchester

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsfinish work only (painting, papering, tiling, carpeting, cabinets, countertops) versus plumbing, electrical or structural changesEach plus the $25.00 application fee (Building Code §109.8, adopted July 6, 2021)
Deck PermitPermit requiredAny sizeBuilding permit: estimated cost of the work multiplied by .010 (the Fees page lists decks under this line), plus the $25.00 application fee
Electrical PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeBuilding permit fee under Building Code §109.8: estimated cost of the work multiplied by .010 for new structures, plus the $25.00 non-refundable application fee
HVAC PermitPermit requiredAny sizeSee schedule
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools; the IRC R105.2 item 7 depth limit Manchester left in placeBuilding permit: estimated cost of the work multiplied by .01, plus the $25.00 application fee
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeBuilding permit: estimated cost of the work multiplied by .010 (the Fees page lists sheds under this line), plus the $25.00 application fee
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an EV charger permit in Manchester?
Yes, before installing a Level 2 charger, new 240-volt circuit or panel upgrade. If you are unsure how that applies to your project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450 before you start.
How much does an EV charger permit cost in Manchester?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450.
How long does an EV charger permit take in Manchester?
Normal processing is 3-5 business days, per the City's FAQ. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an EV charger permit in Manchester?
Apply through the Planning and Community Development Department, Building Regulations Division. The official permit page and contact details are listed on this page.
Can a homeowner pull an EV charger permit themselves in Manchester?
Under New Hampshire law (RSA 155-A:4, I; RSA 319-C:15, II; RSA 153:36, I and VIII(c)): New Hampshire does not license general or residential contractors, so a homeowner may build without a contractor's license; the person responsible for the work must still get the building permit. State trade-licensing law expressly lets a homeowner do electrical work in a single family home they own and live in (or will live in), and lets a property owner do plumbing in their own single-family detached or townhouse residence, including new construction, provided the plumbing meets the state plumbing code. A homeowner may also do fuel gas fitting in an existing single family home that is their primary residence, subject to code, application and inspection requirements. No statute imposes a sale or occupancy restriction on owner-built homes. Confirm how Manchester applies this before you apply.

From the Library

Everything above, sourced

How this EV charger permit page for Manchester was verified. 2 official sources: manchesternh.gov, manchesternh.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Planning and Community Development Department, Building Regulations Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page