New Hampshire / Manchester

HVAC Permit in Manchester, New Hampshire

Permit required

Yes, a permit is required

Before installing or replacing a furnace, boiler, heat pump, central air system, burner, gas piping or ductwork.

Quick answer

Manchester requires a heating permit from the Building Regulations Division to install or replace a residential heating or cooling system; the City's fee schedule prices 'installation or replacement' per dwelling unit, and the FAQ says permits are required for any heating work. Separate line items cover replacing a gas or oil burner, gas piping and outlets, ventilation ductwork, and minor alterations. Gas work must be applied for by a licensed gas fitter unless the applicant is a resident single-family homeowner.

Issued by
Planning and Community Development Department, Building Regulations Division
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What an HVAC permit costs in Manchester

Fee schedule in force
Official scheduleRead .
Published in
Building Code §109.8 8) Heating Equipment (adopted July 6, 2021):
  • residential heating/cooling system installation or replacement serving one dwelling unit $40.00, two units $50.00;
  • new or replacement gas or oil burner only $30.00;
  • any other minor alteration to a heating system $15.00;
  • ventilation ductwork up to 400 CFM $15.00.
  • Gas piping: up to 50 lineal feet $20.00, each outlet $4.00.
  • Plus the $25.00 application fee;
  • the heating application prints a $55.00 minimum including it.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Manchester

General guide, not specific to this office

What an HVAC permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an HVAC permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

Planning and Community Development Department, Building Regulations Division

  • One City Hall Plaza, West Wing, Manchester, NH 03101
  • Phone: (603) 624-6450
  • Email: pcd@manchesternh.gov

What else needs a permit in Manchester

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsfinish work only (painting, papering, tiling, carpeting, cabinets, countertops) versus plumbing, electrical or structural changesEach plus the $25.00 application fee (Building Code §109.8, adopted July 6, 2021)
Deck PermitPermit requiredAny sizeBuilding permit: estimated cost of the work multiplied by .010 (the Fees page lists decks under this line), plus the $25.00 application fee
Electrical PermitPermit requiredAny sizeSee schedule
EV Charger PermitPermit requiredAny sizeSee schedule
Fence PermitPermit requiredAny sizeBuilding permit fee under Building Code §109.8: estimated cost of the work multiplied by .010 for new structures, plus the $25.00 non-refundable application fee
Plumbing PermitPermit requiredAny sizeSee schedule
Pool PermitIt dependsprefabricated pools; the IRC R105.2 item 7 depth limit Manchester left in placeBuilding permit: estimated cost of the work multiplied by .01, plus the $25.00 application fee
Roof Replacement PermitPermit requiredAny sizeSee schedule
Shed PermitPermit requiredAny sizeBuilding permit: estimated cost of the work multiplied by .010 (the Fees page lists sheds under this line), plus the $25.00 application fee
Solar PermitPermit requiredAny sizeSee schedule
Water Heater PermitPermit requiredAny sizeSee schedule

Frequently asked questions

Do you need an HVAC permit in Manchester?
Yes, before installing or replacing a furnace, boiler, heat pump, central air system, burner, gas piping or ductwork. If you are unsure how that applies to your project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450 before you start.
How much does an HVAC permit cost in Manchester?
The fee wording from the official schedule is in the cost table on this page, as we read it on 8 Nov 2026. For the figure on your own project, call the Planning and Community Development Department, Building Regulations Division at (603) 624-6450.
How long does an HVAC permit take in Manchester?
Normal processing is 3-5 business days, per the City's FAQ. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an HVAC permit in Manchester?
Apply through the Planning and Community Development Department, Building Regulations Division. The official permit page and contact details are listed on this page.
Can a homeowner pull an HVAC permit themselves in Manchester?
Under New Hampshire law (RSA 155-A:4, I; RSA 319-C:15, II; RSA 153:36, I and VIII(c)): New Hampshire does not license general or residential contractors, so a homeowner may build without a contractor's license; the person responsible for the work must still get the building permit. State trade-licensing law expressly lets a homeowner do electrical work in a single family home they own and live in (or will live in), and lets a property owner do plumbing in their own single-family detached or townhouse residence, including new construction, provided the plumbing meets the state plumbing code. A homeowner may also do fuel gas fitting in an existing single family home that is their primary residence, subject to code, application and inspection requirements. No statute imposes a sale or occupancy restriction on owner-built homes. Confirm how Manchester applies this before you apply.

From the Library

Everything above, sourced

How this HVAC permit page for Manchester was verified. 2 official sources: manchesternh.gov, manchesternh.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with Planning and Community Development Department, Building Regulations Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Permit required
Check my project