Electrical Permit in Albuquerque, New Mexico
It depends
Sometimes, depending on the project
Before installing or altering wiring, devices, appliances or equipment, or upgrading service amperage.
Issued byCity of Albuquerque Planning Department, Building Safety Division
By Mario Bailey, verified against official sources
Quick answer
The City requires an electrical permit to install an appliance, device, equipment or wiring, or for additions, alterations or replacements of existing ones. The code exempts repair or replacement of receptacles with the same type and configuration, of current-carrying parts of switches, and of fixed motors or listed appliances of the same type and rating in the same location. A homeowner may pull an electrical permit only after passing a written City exam with a score of 75 percent or more; otherwise a licensed contractor must.
Typical threshold: Like-for-like repair or replacement of receptacles, switch parts and fixed listed appliances is exempt; new or altered wiring, devices and equipment needs a permit.
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
When a permit is usually needed
Before installing or altering wiring, devices, appliances or equipment, or upgrading service amperage.
What an electrical permit costs in Albuquerque
How to apply in Albuquerque
In Albuquerque, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- For Albuquerque, the written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- For Albuquerque, the application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. City of Albuquerque Planning Department, Building Safety Division sets the exact checklist for Albuquerque.
Where to apply in Albuquerque:
City of Albuquerque Planning Department, Building Safety Division
- Plaza del Sol Building, 600 Second NW, Albuquerque, NM 87102
- Phone: (505) 924-3320
- Email: planningdepartment@cabq.gov
Electrical Permit in Albuquerque compared with nearby New Mexico localities
| Locality | Permit needed? | Threshold | What each New Mexico schedule says | Verified |
|---|---|---|---|---|
| Albuquerque | It depends | Like-for-like repair or replacement of receptacles, switch parts and fixed listed appliances is exempt; new or altered wiring, devices and equipment needs a permit | ...charge applicable to all applications and additions to permits" $47.00... | |
| Bernalillo County | It depends | Before adding or altering wiring, circuits, outlets, panels or services | Resolution 25-2009 Table 3-B Electrical Permit Fees: administrative charge $23.50 each |
Inspections and closing out your permit
In Albuquerque, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- In Albuquerque: a rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- In Albuquerque: the framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- In Albuquerque: ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- In Albuquerque: arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- In Albuquerque: panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- In Albuquerque: the service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- In Albuquerque: a final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Albuquerque permit portal or by phone at (505) 924-3320.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for Albuquerque
- Confirm the requirement. Sometimes, depending on the project. Typical threshold: Like-for-like repair or replacement of receptacles, switch parts and fixed listed appliances is exempt; new or altered wiring, devices and equipment needs a permit. Usually needed: Before installing or altering wiring, devices, appliances or equipment, or upgrading service amperage.
- Budget the fee. "TABLE 112-B ELECTRICAL PERMIT FEES": "Administrative charge applicable to all applications and additions to permits" $47.00 each; "Meter loop" $40.00 each; outlets "First 20" $1.50 each and "All over 20" $0.90 each; "Panels" $8.00 each; "Residential Fixed Appliances (30 amps or over)" $8.00 each; plan review is 25 percent of the total trade permit fee. City of Albuquerque 2024 Uniform Administrative Code (UAC), Section 112 and Tables 112-A through 112-G, cover date effective January 1, 2025. Official fee schedule.
- Apply. In Albuquerque, in most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the Albuquerque permit portal.
- Keep the office details handy. City of Albuquerque Planning Department, Building Safety Division. Phone: (505) 924-3320. Address: Plaza del Sol Building, 600 Second NW, Albuquerque, NM 87102.
- Plan for inspections. In Albuquerque, electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked .
Permitting activity in Albuquerque
In 2025, Albuquerque authorized permits for 1,417 new residential housing units (525 single-family, 892 in multi-family buildings), valued at $219M, up from 1,099 the year before. That works out to about 2.5 permits per 1,000 residents.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 562,540.
Frequently asked questions
- Do you need an electrical permit in Albuquerque?
- The City requires an electrical permit to install an appliance, device, equipment or wiring, or for additions, alterations or replacements of existing ones. The code exempts repair or replacement of receptacles with the same type and configuration, of current-carrying parts of switches, and of fixed motors or listed appliances of the same type and rating in the same location. A homeowner may pull an electrical permit only after passing a written City exam with a score of 75 percent or more; otherwise a licensed contractor must. Like-for-like repair or replacement of receptacles, switch parts and fixed listed appliances is exempt; new or altered wiring, devices and equipment needs a permit. Always confirm with the office before starting.
- How much does an electrical permit cost in Albuquerque?
- "TABLE 112-B ELECTRICAL PERMIT FEES": "Administrative charge applicable to all applications and additions to permits" $47.00 each; "Meter loop" $40.00 each; outlets "First 20" $1.50 each and "All over 20" $0.90 each; "Panels" $8.00 each; "Residential Fixed Appliances (30 amps or over)" $8.00 each; plan review is 25 percent of the total trade permit fee. City of Albuquerque 2024 Uniform Administrative Code (UAC), Section 112 and Tables 112-A through 112-G, cover date effective January 1, 2025. See the official fee schedule for current amounts.
- How long does an electrical permit take in Albuquerque?
- In Albuquerque, an electrical permit typically takes 1 day for electrical permits (Building Safety dashboard, last updated October 20, 2026). Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for an electrical permit in Albuquerque?
- You can apply through the Albuquerque permit portal or contact the City of Albuquerque Planning Department, Building Safety Division directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Albuquerque?
- Under New Mexico law (NMSA 1978, 60-13-3(D)(10), (11); 14.5.2.8(B) NMAC; 14.5.2.18 NMAC): Yes, with tight limits. CILA exempts from the contractor definition an individual who, alone or with wage-paid help, builds or makes installations, alterations or repairs to a single-family dwelling he owns and occupies or will occupy (60-13-3(D)(10)), and a person building or improving a single-family residence for personal use (60-13-3(D)(11)). The work must still meet all state codes, and CID's homeowner permit (14.5.2.18 NMAC) applies only to the owner's primary residence and its garages, carports and sheds, never to rental, other owned or commercial property. The homeowner must perform the major portion of the work by dollar amount and file a signed, notarized responsibility sheet. A homeowner electrical permit requires passing a CID homeowner electrical exam (75% to pass), a plumbing permit requires a competency showing that may include a written exam, and no homeowner permit is issued for HVAC, natural gas or LP gas work. The project may not be put on the market while under construction (doing so voids the permit and can bring unlicensed contracting charges), and only one single-family homeowner permit may be issued to the same owner in any 12-month period. Confirm how Albuquerque applies this before you apply.
From the Library
What else needs a permit in Albuquerque
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Bathroom Remodel Permit | It depends | Finish work and same-configuration fixture swaps are exempt; altered piping, new wiring or structural changes need permits | Building permit (if structural or layout work) by valuation under "TABLE 112-A BUILDING... |
| Deck Permit | It depends | Platforms not over a story or basement below and not part of an accessible route | ...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to... |
| EV Charger Permit | Permit required | Any size | Electrical permit under "TABLE 112-B ELECTRICAL PERMIT FEES": $47.00 administrative... |
| Fence Permit | Permit required | Any size | ...Construction Cost Guide Per Lineal Foot" (for example "Wood Fence (Cedar)" $23.30... |
| HVAC Permit | Permit required | Any size | ...charge applicable to all applications and additions to permit" $47.00... |
| Patio Permit | It depends | Covered versus uncovered: a patio cover or porch needs a building permit; an uncovered at-grade slab falls under the exemption for platforms and walks | ...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to... |
| Plumbing Permit | It depends | Stopping leaks, clearing stoppages and replacing fixtures with the same type of configuration are exempt; new or altered piping needs a permit | ...charge applicable to all applications and additions to permit" $47.00... |
| Pool Permit | It depends | Prefabricated pools installed entirely above ground, not exceeding 5,000 gallons, accessory to a building under the International Residential Code | ...FEES" with the (.50) residential modifier, plus "Swimming pool (Private)" $60.00... |
| Roof Replacement Permit | Permit required | Any size | ...PERMIT FEES", "Residential (R-3 Occupancies Only)": Administrative Fee $30.00 +... |
| Shed Permit | It depends | Building area of a one-story detached accessory building used as a tool or storage shed, playhouse or similar use | ...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to... |
| Solar Permit | Permit required | Any size | ...the (.50) residential modifier, plus an electrical permit under Table 112-B ($47.00... |
| Water Heater Permit | Permit required | Any size | Plumbing/mechanical permit with the $47.00 administrative charge (Tables 112-C and 112-D) |
Electrical Permit in other New Mexico localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Albuquerque documents; the office above sets the local rules.
How this electrical permit page for Albuquerque was verified. 2 official sources: cabq.gov, cabq.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Albuquerque Planning Department, Building Safety Division. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page