New Mexico

Building permits in Albuquerque, New Mexico

Of the 13 common home projects we have verified in Albuquerque, 6 need a permit outright and 7 depend on size or scope. Click any project for the full rule, fee, and how to apply.

By Mario Bailey Last checked · 2 official sources

Verified against official sources
Project types verified
13
in Albuquerque

City of Albuquerque Planning Department, Building Safety Division

Look up a permit in Albuquerque

Albuquerque permit records are public, and you can check a property's permit history by address or permit number online.

How to search Albuquerque permit records

What needs a permit in Albuquerque

Of the 13 common home projects we have verified in Albuquerque, 6 need a permit outright and 7 depend on size or scope. Click any project for the full rule, fee, and how to apply.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work and same-configuration fixture swaps are exempt; altered piping, new wiring or structural changes need permitsBuilding permit (if structural or layout work) by valuation under "TABLE 112-A BUILDING...
Deck PermitIt dependsPlatforms not over a story or basement below and not part of an accessible route...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to...
Electrical PermitIt dependsLike-for-like repair or replacement of receptacles, switch parts and fixed listed appliances is exempt; new or altered wiring, devices and equipment needs a permit...charge applicable to all applications and additions to permits" $47.00...
EV Charger PermitPermit requiredAny sizeElectrical permit under "TABLE 112-B ELECTRICAL PERMIT FEES": $47.00 administrative...
Fence PermitPermit requiredAny size...Construction Cost Guide Per Lineal Foot" (for example "Wood Fence (Cedar)" $23.30...
HVAC PermitPermit requiredAny size...charge applicable to all applications and additions to permit" $47.00...
Patio PermitIt dependsCovered versus uncovered: a patio cover or porch needs a building permit; an uncovered at-grade slab falls under the exemption for platforms and walks...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to...
Plumbing PermitIt dependsStopping leaks, clearing stoppages and replacing fixtures with the same type of configuration are exempt; new or altered piping needs a permit...charge applicable to all applications and additions to permit" $47.00...
Pool PermitIt dependsPrefabricated pools installed entirely above ground, not exceeding 5,000 gallons, accessory to a building under the International Residential Code...FEES" with the (.50) residential modifier, plus "Swimming pool (Private)" $60.00...
Roof Replacement PermitPermit requiredAny size...PERMIT FEES", "Residential (R-3 Occupancies Only)": Administrative Fee $30.00 +...
Shed PermitIt dependsBuilding area of a one-story detached accessory building used as a tool or storage shed, playhouse or similar use...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to...
Solar PermitPermit requiredAny size...the (.50) residential modifier, plus an electrical permit under Table 112-B ($47.00...
Water Heater PermitPermit requiredAny sizePlumbing/mechanical permit with the $47.00 administrative charge (Tables 112-C and 112-D)

Planning a project in Albuquerque?

Hire it out

Sponsored

Licensed contractors usually pull the permit as part of the job. Comparing a few local quotes before you commit is the useful next step.

Compare local contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

Planning several things at once? Check your whole project

Schedule an inspection in Albuquerque

Permitted work is not finished until it passes inspection. The permit owner schedules inspections online in ABQ-PLAN or by calling 505-924-3320. There are no set inspection times (GPS-routed); requests received before 4:15 p.m. are generally scheduled for the next business day. If a contractor pulled the permit, the contractor schedules the inspections. Re-roof and solar finals may be inspected from drone photos.

Schedule or request a Albuquerque inspection

When the portal will not take the date you need, the office still books by phone: (505) 924-3320.

Checked . If the office has changed its process, report it.

Albuquerque permit fees compared with nearby New Mexico localities

New Mexico locality Deck PermitHVAC PermitElectrical Permit
Albuquerque ...BUILDING PERMIT FEES" by total valuation ("$1.00 to... ...to all applications and additions to permit" $47.00... ...to all applications and additions to permits" $47.00...
Bernalillo County ...25-2009 (effective May 1, 2009), Table 3-A: "$30.00... ...Mechanical Permit Fees: administrative charge $23.50... ...Electrical Permit Fees: administrative charge $23.50...

Each cell is the opening clause of that New Mexico jurisdiction's own fee schedule; the full wording and source sit on each permit page.

Albuquerque permit questions, answered from the data

Do you need a permit in Albuquerque?
For most projects, yes. Of the 13 permit types we have verified for Albuquerque, 6 always require a permit (for example an EV charger permit), 7 depend on size or scope (a bathroom remodel permit, for instance). Each Albuquerque permit type's page states the exact rule and its source.
How much does a permit cost in Albuquerque?
Albuquerque publishes a fee for 13 of the 13 permit types we cover, each quoted on its page from the jurisdiction's own schedule (linked on every page that carries one). Fees are set by City of Albuquerque Planning Department, Building Safety Division; we do not estimate or mark them up.
Where do you apply for a permit in Albuquerque?
City of Albuquerque Planning Department, Building Safety Division issues permits in Albuquerque, with an online portal for applications, plan uploads and status checks, and takes questions at (505) 924-3320. The Albuquerque official page and portal are linked in the office section above.

How the Albuquerque pages were verified. 13 permit types, 4 distinct official sources, most recently checked . Every rule is read from City of Albuquerque Planning Department, Building Safety Division or the applicable code and cited on its page; anything we could not confirm for Albuquerque is marked rather than estimated. How we verify.

Permitting activity in Albuquerque

In 2025, Albuquerque authorized permits for 1,417 new residential housing units (525 single-family, 892 in multi-family buildings), valued at $219M , up from 1,099 the year before. That works out to about 2.5 permits per 1,000 residents. It is a useful gauge of how busy the local permit office is.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 562,540.

Other permit offices in New Mexico