HVAC Permit in Albuquerque, New Mexico

Permit required

Yes, a permit is required

Before installing or replacing heating or cooling equipment or ductwork.

Confirmed on official page Verified

Issued byCity of Albuquerque Planning Department, Building Safety Division

By Mario Bailey, verified against official sources

Quick answer

Heating or cooling work needs a City plumbing/mechanical permit, and installing equipment or ductwork can only be done by a licensed contractor. The code's mechanical exemptions cover only portable heaters, coolers and fans, replacement of component parts that do not alter an appliance's approval, and self-contained refrigerating systems.

Who is pulling this permit?

Hire it out

Sponsored

HVAC contractors usually pull this permit as part of the job. If you have not picked one yet, compare a few quotes before you commit.

Compare HVAC contractor quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

When a permit is usually needed

Before installing or replacing heating or cooling equipment or ductwork.

What an HVAC permit costs in Albuquerque

Line item
HVAC permitBy formula"TABLE 112-C MECHANICAL PERMIT FEES": "Administrative charge applicable to all applications and additions to permit" $47.00 each; "Each appliance, includes plenums and venting" $14.00 each; each condensing unit "to and including 36,000 B.T.U. output" $22.00 each; "For each evaporative cooler other than portable type" $14.00 each; plan review is 25 percent of the total trade permit fee. City of Albuquerque 2024 Uniform Administrative Code (UAC), Section 112 and Tables 112-A through 112-G, cover date effective January 1, 2025.
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How to apply in Albuquerque

In Albuquerque, a residential HVAC (mechanical) permit application must identify the covered equipment and scope of work, since installing, altering, or replacing a heating or cooling system is regulated work that cannot start until the application is submitted and the permit issued. The equipment itself must be picked by a real sizing calculation rather than a rule of thumb.

What most HVAC permit applications include:

  • For Albuquerque, a mechanical permit is required before anyone may install, alter, repair, remove, convert, or replace a heating, ventilating, or air conditioning system regulated by the code, and the work may not begin until the application is submitted and the permit is issued (IRC R105.1).
  • For Albuquerque, the application identifies the specific equipment being installed, such as a furnace, heat pump, or air conditioner, since the unit must be installed according to its listing and the manufacturer's installation instructions (IRC M1401.1).
  • For Albuquerque, the proposed equipment location must leave the clearances needed to clean coils and replace filters, blowers, motors, and controls after installation (IRC M1401.2).
  • For Albuquerque, the application carries the equipment sizing basis: ACCA Manual J building loads and Manual S equipment selection, or another approved sizing method, not a rule of thumb (IRC M1401.3).
  • For a split system, the work covered by the permit includes refrigerant suction line insulation, since the piping is inspected against that standard once installed (IRC M1411.6).

General submittal guidance from International Residential Code (IRC), 2021 edition, Chapter 1 (Permits) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. City of Albuquerque Planning Department, Building Safety Division sets the exact checklist for Albuquerque.

Where to apply in Albuquerque:

City of Albuquerque Planning Department, Building Safety Division

HVAC Permit in Albuquerque compared with nearby New Mexico localities

LocalityPermit needed?ThresholdWhat each New Mexico schedule saysVerified
AlbuquerquePermit requiredAny size...charge applicable to all applications and additions to permit" $47.00...
Bernalillo CountyIt dependsBefore installing or replacing a furnace, air conditioner, heat pump, boiler...Resolution 25-2009 Table 3-C Mechanical Permit Fees: administrative charge $23.50 each

Inspections and closing out your permit

In Albuquerque, mechanical work gets a rough in inspection after the ductwork, refrigerant lines, and gas piping are in but before they are covered or concealed, followed by a final inspection that confirms the equipment operates correctly and its clearances, combustion air, and condensate disposal are in place. A straight equipment changeout with no new ductwork commonly gets a single final inspection instead of a separate rough in trip.

  1. In Albuquerque: rough inspection of the mechanical and gas systems must be made before the work is covered or concealed, before fixtures or appliances are set or installed, and before the framing inspection (IRC R109.1.2).
  2. In Albuquerque: where a cooling coil is added to an existing warm air furnace, the rough in confirms the coil is not installed upstream of the heat exchanger unless the furnace is listed for it, and that the blower can handle the added static pressure (IRC M1411.2).
  3. In Albuquerque: the rough in and final both confirm the appliance access opening and working space are large enough to service the unit (IRC M1305.1).
  4. In Albuquerque: at final inspection, the inspector verifies the equipment has adequate combustion air, with openings kept clear for the distance the code requires (IRC M1402.3).
  5. In Albuquerque: final inspection also checks that the condensate line drains to an approved point of disposal with the required slope and does not create a nuisance (IRC M1411.3).
  6. In Albuquerque: for a straight equipment changeout with no new ductwork, many permit offices require only a single final inspection, while a new installation still gets a rough in inspection before the final (common local inspection practice).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Albuquerque permit portal or by phone at (505) 924-3320.

Inspection sequence from International Residential Code (IRC), 2021 edition, Section R109 (Required Inspections) and Chapter 14 (Heating and Cooling Equipment and Appliances). Source. An open permit left un-inspected can surface later in a title search or home sale.

Permitting activity in Albuquerque

In 2025, Albuquerque authorized permits for 1,417 new residential housing units (525 single-family, 892 in multi-family buildings), valued at $219M, up from 1,099 the year before. That works out to about 2.5 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 562,540.

Frequently asked questions

Do you need an HVAC permit in Albuquerque?
Heating or cooling work needs a City plumbing/mechanical permit, and installing equipment or ductwork can only be done by a licensed contractor. The code's mechanical exemptions cover only portable heaters, coolers and fans, replacement of component parts that do not alter an appliance's approval, and self-contained refrigerating systems. Always confirm with the City of Albuquerque Planning Department, Building Safety Division before starting.
How much does an HVAC permit cost in Albuquerque?
"TABLE 112-C MECHANICAL PERMIT FEES": "Administrative charge applicable to all applications and additions to permit" $47.00 each; "Each appliance, includes plenums and venting" $14.00 each; each condensing unit "to and including 36,000 B.T.U. output" $22.00 each; "For each evaporative cooler other than portable type" $14.00 each; plan review is 25 percent of the total trade permit fee. City of Albuquerque 2024 Uniform Administrative Code (UAC), Section 112 and Tables 112-A through 112-G, cover date effective January 1, 2025. See the official fee schedule for current amounts.
How long does an HVAC permit take in Albuquerque?
In Albuquerque, an HVAC permit typically takes 1 day for plumbing/mechanical permits (Building Safety dashboard, last updated October 20, 2026). Times can vary by workload and project scope, so confirm with the office.
Where do you apply for an HVAC permit in Albuquerque?
You can apply through the Albuquerque permit portal or contact the City of Albuquerque Planning Department, Building Safety Division directly. The links are listed on this page.
Can a homeowner pull an HVAC permit themselves in Albuquerque?
Under New Mexico law (NMSA 1978, 60-13-3(D)(10), (11); 14.5.2.8(B) NMAC; 14.5.2.18 NMAC): Yes, with tight limits. CILA exempts from the contractor definition an individual who, alone or with wage-paid help, builds or makes installations, alterations or repairs to a single-family dwelling he owns and occupies or will occupy (60-13-3(D)(10)), and a person building or improving a single-family residence for personal use (60-13-3(D)(11)). The work must still meet all state codes, and CID's homeowner permit (14.5.2.18 NMAC) applies only to the owner's primary residence and its garages, carports and sheds, never to rental, other owned or commercial property. The homeowner must perform the major portion of the work by dollar amount and file a signed, notarized responsibility sheet. A homeowner electrical permit requires passing a CID homeowner electrical exam (75% to pass), a plumbing permit requires a competency showing that may include a written exam, and no homeowner permit is issued for HVAC, natural gas or LP gas work. The project may not be put on the market while under construction (doing so voids the permit and can bring unlicensed contracting charges), and only one single-family homeowner permit may be issued to the same owner in any 12-month period. Confirm how Albuquerque applies this before you apply.

From the Library

What else needs a permit in Albuquerque

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Bathroom Remodel PermitIt dependsFinish work and same-configuration fixture swaps are exempt; altered piping, new wiring or structural changes need permitsBuilding permit (if structural or layout work) by valuation under "TABLE 112-A BUILDING...
Deck PermitIt dependsPlatforms not over a story or basement below and not part of an accessible route...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to...
Electrical PermitIt dependsLike-for-like repair or replacement of receptacles, switch parts and fixed listed appliances is exempt; new or altered wiring, devices and equipment needs a permit...charge applicable to all applications and additions to permits" $47.00...
EV Charger PermitPermit requiredAny sizeElectrical permit under "TABLE 112-B ELECTRICAL PERMIT FEES": $47.00 administrative...
Fence PermitPermit requiredAny size...Construction Cost Guide Per Lineal Foot" (for example "Wood Fence (Cedar)" $23.30...
Patio PermitIt dependsCovered versus uncovered: a patio cover or porch needs a building permit; an uncovered at-grade slab falls under the exemption for platforms and walks...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to...
Plumbing PermitIt dependsStopping leaks, clearing stoppages and replacing fixtures with the same type of configuration are exempt; new or altered piping needs a permit...charge applicable to all applications and additions to permit" $47.00...
Pool PermitIt dependsPrefabricated pools installed entirely above ground, not exceeding 5,000 gallons, accessory to a building under the International Residential Code...FEES" with the (.50) residential modifier, plus "Swimming pool (Private)" $60.00...
Roof Replacement PermitPermit requiredAny size...PERMIT FEES", "Residential (R-3 Occupancies Only)": Administrative Fee $30.00 +...
Shed PermitIt dependsBuilding area of a one-story detached accessory building used as a tool or storage shed, playhouse or similar use...permit fee from "TABLE 112-A BUILDING PERMIT FEES" by total valuation ("$1.00 to...
Solar PermitPermit requiredAny size...the (.50) residential modifier, plus an electrical permit under Table 112-B ($47.00...
Water Heater PermitPermit requiredAny sizePlumbing/mechanical permit with the $47.00 administrative charge (Tables 112-C and 112-D)

HVAC Permit in other New Mexico localities

Everything above, sourced

cabq.gov: permitsread

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Albuquerque documents; the office above sets the local rules.

How this HVAC permit page for Albuquerque was verified. 1 official source: cabq.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Albuquerque Planning Department, Building Safety Division. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

Compare HVAC Permit requirements across New Mexico localities

HVAC permit rules nationwide

Look up an existing Albuquerque permit record

Permit required
Get quotes