Electrical Permit in Tulsa, Oklahoma
It depends
Sometimes, depending on the project
Before any electrical work other than a repair that does not alter or rearrange the installation
By Mario Bailey, verified against official sources
Quick answer
Tulsa requires an electrical permit for any electrical work, with one published exemption. Title 52, Section 104.2 says no person or company shall do or cause to be done any electrical work without first having obtained an electrical permit, and Section 104.3 adds that a permit is not required for repairs that do not involve alteration or rearrangement of the electrical installation. Where an emergency replacement or repair must be done, the application is filed the next working business day. Only contractors registered with the City, holding a current State of Oklahoma license issued under 59 O.S. Section 1680 et seq., may be issued a permit, and contractors, journeymen and apprentices must carry the state license on their person while working in Tulsa.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before any electrical work other than a repair that does not alter or rearrange the installation
What an electrical permit costs in Tulsa
How to apply in Tulsa
In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. City of Tulsa Development Services Department, Permit Center sets the exact checklist for Tulsa.
Where to apply in Tulsa:
City of Tulsa Development Services Department, Permit Center
- 175 E. 2nd Street, 4th Floor, Tulsa, OK 74103
- Phone: (918) 596-9456
- Email: bldgandLic@cityoftulsa.org
Inspections and closing out your permit
Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Tulsa permit portal or by phone at (918) 596-9456.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for Tulsa
- Confirm the requirement. Sometimes, depending on the project. Usually needed: Before any electrical work other than a repair that does not alter or rearrange the installation.
- Budget the fee. Title 49, Chapter 4, Section 401 sets residential electrical permit fees for one- and two-family dwellings for new construction and additions as the electrical service fee plus a base fee by size: $230.00 for 1 to 2,000 sq. ft., $293.00 for 2,001 to 6,000 sq. ft., and $58.00 for each additional 1,000 sq. ft. Section 404 covers other electrical work: electrical service $98.00 for the first 100 amps and $18.00 per additional 100 amps, swimming pools $235.00, generator $235.00, HVAC unit $81.00, electrical equipment 1 to 25 items $81.00, reconnect fee $81.00. Per Ord. No. 25351, 7-17-2024. Every permit also carries the general administrative fees in Title 49, Chapter 1: a $5.00 permit system maintenance surcharge on each permit (Section 103), a $4.00 Uniform Building Code Commission fee plus a $0.50 city administrative fee collected under 59 O.S. Section 1000.25 (Section 100), and a minimum fee of $80.00 on any permit (Section 107). Starting work before the permit is issued adds a penalty fee of $214.00 or three times the regular fee, whichever is greater (Section 105). All Title 49 figures are from Ord. No. 25351, 7-17-2024. Official fee schedule.
- Apply. In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the Tulsa permit portal.
- Keep the office details handy. City of Tulsa Development Services Department, Permit Center. Phone: (918) 596-9456. Address: 175 E. 2nd Street, 4th Floor, Tulsa, OK 74103.
- Plan for inspections. Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need an electrical permit in Tulsa?
- Tulsa requires an electrical permit for any electrical work, with one published exemption. Title 52, Section 104.2 says no person or company shall do or cause to be done any electrical work without first having obtained an electrical permit, and Section 104.3 adds that a permit is not required for repairs that do not involve alteration or rearrangement of the electrical installation. Where an emergency replacement or repair must be done, the application is filed the next working business day. Only contractors registered with the City, holding a current State of Oklahoma license issued under 59 O.S. Section 1680 et seq., may be issued a permit, and contractors, journeymen and apprentices must carry the state license on their person while working in Tulsa. Always confirm with the City of Tulsa Development Services Department, Permit Center before starting.
- How much does an electrical permit cost in Tulsa?
- Title 49, Chapter 4, Section 401 sets residential electrical permit fees for one- and two-family dwellings for new construction and additions as the electrical service fee plus a base fee by size: $230.00 for 1 to 2,000 sq. ft., $293.00 for 2,001 to 6,000 sq. ft., and $58.00 for each additional 1,000 sq. ft. Section 404 covers other electrical work: electrical service $98.00 for the first 100 amps and $18.00 per additional 100 amps, swimming pools $235.00, generator $235.00, HVAC unit $81.00, electrical equipment 1 to 25 items $81.00, reconnect fee $81.00. Per Ord. No. 25351, 7-17-2024. Every permit also carries the general administrative fees in Title 49, Chapter 1: a $5.00 permit system maintenance surcharge on each permit (Section 103), a $4.00 Uniform Building Code Commission fee plus a $0.50 city administrative fee collected under 59 O.S. Section 1000.25 (Section 100), and a minimum fee of $80.00 on any permit (Section 107). Starting work before the permit is issued adds a penalty fee of $214.00 or three times the regular fee, whichever is greater (Section 105). All Title 49 figures are from Ord. No. 25351, 7-17-2024. See the official fee schedule for current amounts.
- Where do you apply for an electrical permit in Tulsa?
- You can apply through the Tulsa permit portal or contact the City of Tulsa Development Services Department, Permit Center directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Tulsa?
- Under Oklahoma law (11 O.S. 43-109.2(B); 59 O.S. 1692(B)(3), 1017(6), 1151.17(B), 1850.10(A) and (B)(1), 1693(A)): Oklahoma does not license general or residential contractors at the state level, which is unusual and was verified by reading the whole of Title 59: the state licenses plumbing (59 O.S. 1001 et seq.), electrical (59 O.S. 1680 through 1699), mechanical (59 O.S. 1850.1 et seq.), roofing by registration (59 O.S. 1151.1 et seq.) and building and construction inspectors (59 O.S. 1031 through 1046), and no chapter licenses a general contractor. A homeowner may pull their own permit and do their own work. 11 O.S. 43-109.2(B) exempts a person doing construction or remodeling on their own single-family or duplex structure on their own property from the insurance verification a permit office must otherwise obtain before issuing a residential building permit, and it applies even when the structure is a rental, but the exemption disappears the moment a general contractor or subcontractor performs the work and pulls the permit. The trade acts carry matching self-work exemptions: no state license is needed to do electrical work on your own property or residence (59 O.S. 1692(B)(3)) or plumbing work on your own property of residence (59 O.S. 1017(6)), and a person roofing their own property is exempt from roofing registration though they must still give the permit office the registration number of any roofing subcontractor (59 O.S. 1151.17(B)). Every one of those is a licensing exemption only, expressly subject to local ordinances in the electrical case, and none of them waives the city permit; 59 O.S. 1693(A) still bars electrical work in a city or town without a permit first being obtained. Mechanical work is the sharp exception: the property-owner exemption in 59 O.S. 1850.10(B)(1) reaches only minor repair, and 59 O.S. 1850.10(A) requires a mechanical or plumbing licensee to install, replace or repair gas piping, floor furnaces, wall heaters or radiant-floor heating with no owner carve-out. Oklahoma has no statewide owner-builder disclosure form and no sale restriction comparable to Florida's one-year rule; the term owner-builder appears nowhere in Title 11 or Title 59. Confirm how Tulsa applies this before you apply.
From the Library
What else needs a permit in Tulsa
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | Permit required | Not specified | Priced as a building permit from valuation: the application fee is $64.00 for $0 to... |
| Fence Permit | Permit required | Not specified | Residential zoning clearance permit fee is $75.50 under Tulsa Revised Ordinances Title... |
| HVAC Permit | Permit required | Not specified | Title 49, Chapter 5, Section 501 prices mechanical work by item: heating appliance, each... |
| Patio Permit | It depends | covered patios, carports and porches | A carport permit fee is $98.00 under Title 49, Chapter 3, Section 304. |
| Plumbing Permit | Permit required | Not specified | Title 49, Chapter 8, Section 801 prices plumbing work by item: backflow prevention... |
| Pool Permit | It depends | prefabricated swimming pools | Priced as a building permit from declared valuation: application fee $64.00 for $0 to... |
| Roof Replacement Permit | Permit required | Not specified | Priced as a building permit from valuation: $64.00 application fee for $0 to $15,000.00... |
| Shed Permit | Permit required | Not specified | Residential zoning clearance permit fee is $75.50 under Title 49, Chapter 3, Section... |
| Solar Permit | Permit required | Not specified | Title 49 has no solar line item. |
Electrical Permit in other Oklahoma localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Tulsa documents; the office above sets the local rules.
Verified by a person against the sources above on , not confirmed with City of Tulsa Development Services Department, Permit Center. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare Electrical Permit requirements across Oklahoma localities
Permit office
City of Tulsa Development Services Department, Permit Center
(918) 596-9456Permit portal