Electrical Permit in Clark County, Washington
By Mario Bailey Last checked 2026-07-19 · 3 official sources
Verified against official sources Confirmed on official pagePermit required
Quick answer
Clark County does not issue electrical permits. Electrical permits, plan review and inspections in unincorporated Clark County are handled by the Washington State Department of Labor and Industries; the county directs applicants to lni.wa.gov or 360.896.2300. L&I states that electrical work in Washington requires a permit and inspection, with a few exceptions listed in chapter 296-46B-901 WAC.
Typical threshold: Electrical work in Washington requires a permit and inspection, with a few exceptions listed in chapter 296-46B-901 WAC; in unincorporated Clark County electrical permits are issued by state Labor and Industries, not the county.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
Want a pro to handle this permit? Request free help
Tell us where your project stands. Free to ask; no obligation.
Where we have a vetted local pro who handles permits in Clark County, we connect you; otherwise we reply with the exact steps and office links for your situation. PermitNotebook is not a government agency and does not file permits. This is a free referral request; we may earn a fee if you hire a pro we introduce. Partners never influence our permit data. Privacy policy.
When a permit is usually needed
Any electrical work; permit issued by Washington State L&I not the county
What electrical permit costs in Clark County
No county fee; electrical permits in unincorporated Clark County are issued by the Washington State Department of Labor and Industries, so fees follow the state L&I electrical permit fee schedule.
How Clark County compares in Washington
No Washington jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.
| Jurisdiction | Permit needed? | Typical fee |
|---|---|---|
| Bellevue | Permit required | Electrical permit fee by valuation per Table 6 of Ordinance 6879, $79 inspect... |
| Clark Countythis page | Permit required | No county fee; |
| King County | Permit required | Set by state L&I, not King County, under WAC 296-46B-906 (effective 7/1/2026)... |
| Pierce County | Permit required | No county fee; |
| Seattle | Permit required | Itemized per Fee Subtitle Table D-15: minimum $105.12 for a standard online s... |
| Snohomish County | Permit required | No county fee; |
| Tacoma | Permit required | No Planning and Development Services fee; |
How to apply in Clark County
In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished.
What most electrical permit applications include:
- Before any electrical work begins, the owner or an authorized agent must first apply to the building official and obtain the required permit (IRC R105.1).
- The written application must identify and describe the electrical work covered by the permit and describe the property, such as by street address, well enough to locate the job (IRC R105.3).
- The application must be accompanied by construction documents (plans) and any other information the permit office requires, and must be signed by the applicant or an authorized agent (IRC R105.3).
- Certain minor or like-for-like electrical jobs, such as replacing a branch-circuit breaker of the required capacity in the same location, are commonly exempt from needing a separate permit (IRC R105.2).
- Once issued, the building permit or a copy of it must be kept at the job site until the project is complete (IRC R105.7).
General submittal guidance from International Residential Code (IRC), Section R105, Permits (2015 and 2021 editions, as locally adopted). Source. Washington State Department of Labor and Industries (Clark County does not issue electrical permits) sets the exact checklist for Clark County.
Where to apply in Clark County:
Washington State Department of Labor and Industries (Clark County does not issue electrical permits)
- Phone: 360.896.2300
Inspections and closing out your permit
Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
- A rough-in inspection of the electrical wiring is required before it is covered or concealed by insulation, drywall, or other finish material, and before fixtures or appliances are set (IRC R109.1.2).
- The framing inspection cannot proceed until the plumbing, mechanical, and electrical rough-in inspections have all been approved (IRC R109.1.4).
- Ground-fault circuit-interrupter (GFCI) protection is checked at receptacles in bathrooms, kitchens, garages, basements, crawl spaces, outdoors, and other damp or wet locations (NEC 210.8(A)).
- Arc-fault circuit-interrupter (AFCI) protection is verified on branch circuits serving bedrooms, living areas, and most other habitable rooms (NEC 210.12(A)).
- Panelboards must carry a circuit directory that legibly and specifically identifies the purpose of each circuit, not a vague label (NEC 408.4).
- The service disconnect must be installed in a readily accessible location, either outside the structure or just inside the point where the service conductors enter (NEC 230.70).
- A final inspection is made only after all permitted electrical work is complete, and the wiring cannot be used or the space occupied until it passes (IRC R109.1.6).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Call Clark County at 360.896.2300 to schedule.
Inspection sequence from International Residential Code (IRC), Section R109, Required Inspections, and NFPA 70 National Electrical Code (NEC), 2020 and 2023 editions. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Electrical Permit checklist for Clark County
- Confirm the requirement. Yes, a permit is required. Typical threshold: Electrical work in Washington requires a permit and inspection, with a few exceptions listed in chapter 296-46B-901 WAC; in unincorporated Clark County electrical permits are issued by state Labor and Industries, not the county. Usually needed: Any electrical work; permit issued by Washington State L&I not the county.
- Budget the fee. No county fee; electrical permits in unincorporated Clark County are issued by the Washington State Department of Labor and Industries, so fees follow the state L&I electrical permit fee schedule.
- Apply. In most US jurisdictions, the property owner or a licensed electrician applies for an electrical permit before work starts, describing the scope of work and the property and typically attaching plans. Some minor, like-for-like electrical repairs are commonly exempt, and once issued the permit is kept on site until the job is finished. Start at the official Clark County permit page.
- Keep the office details handy. Washington State Department of Labor and Industries (Clark County does not issue electrical permits). Phone: 360.896.2300.
- Plan for inspections. Electrical work under a permit is inspected at least twice: a rough-in inspection of the wiring before it is covered by drywall or insulation, and a final inspection once all devices, panels, and labeling are complete. Inspectors also check specific safety items along the way, such as GFCI and AFCI protection, panel circuit directories, and the service disconnect location.
Compiled from the official sources on this page. Last checked 2026-07-19.
The checklist stays on this page either way. We may send occasional verified rule-change notes for your area; unsubscribe anytime. See our privacy policy.
Frequently asked questions
- Do you need a electrical permit in Clark County?
- Clark County does not issue electrical permits. Electrical permits, plan review and inspections in unincorporated Clark County are handled by the Washington State Department of Labor and Industries; the county directs applicants to lni.wa.gov or 360.896.2300. L&I states that electrical work in Washington requires a permit and inspection, with a few exceptions listed in chapter 296-46B-901 WAC. Always confirm with the Washington State Department of Labor and Industries (Clark County does not issue electrical permits) before starting.
- How much does a electrical permit cost in Clark County?
- No county fee; electrical permits in unincorporated Clark County are issued by the Washington State Department of Labor and Industries, so fees follow the state L&I electrical permit fee schedule. Contact the office for current amounts.
- Where do you apply for a electrical permit in Clark County?
- Apply through the Washington State Department of Labor and Industries (Clark County does not issue electrical permits). The official permit page and contact details are listed on this page.
From the Library
What else needs a permit in Clark County
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | Exempt only if the deck does not exceed 200 square feet, is not more than 30 inches above grade at any point, is not attached to a dwelling, does not serve a required exit door, and is not used for a hot tub or pool; all other decks require a permit. | Fees are established by county ordinance and calculated automatically during the applic... |
| Fence Permit | It depends | Fences seven feet or less in height do not require a permit; fences over 7 feet in height require a Fence/Retaining Wall (FRT) permit. | Fees are established by county ordinance and calculated automatically during the applic... |
| HVAC Permit | Permit required | Mechanical permits cover installation of heating and cooling equipment such as furnaces, heat pumps, A/C units, ductless mini splits and gas piping; for additions and new construction this work is included in the ADS or NHC permit. | Application rev 1.30.23: $94 issuance plus per-appliance fees including furnace or heat... |
| Patio Permit | It depends | Patio and concrete slabs on the ground grade are exempt from permit but may not be built on easements; adding a patio cover or enclosing a covered patio requires a building permit under the ADS permit type. | Fees are established by county ordinance and calculated automatically during the applic... |
| Plumbing Permit | Permit required | A plumbing permit is required for installation of any plumbing fixtures, including water heaters, toilets and sinks. | Application rev 9.2.25: $94 issuance plus per-item fees including plumbing fixture/trap... |
| Pool Permit | It depends | A permit is required for any structure intended for swimming or recreational bathing that contains water over 24 inches deep, including in-ground, aboveground and on-ground pools, hot tubs and spas. | Fees are established by county ordinance and calculated automatically during the applic... |
| Roof Replacement Permit | Permit required | Re-roofing permits are required for all buildings in Clark County; a separate permit may be required if structural work such as replacing roof sheathing is necessary. | County handout rev 7.16.18: residential re-roofing permit $220 plus $94 issuance and $6... |
| Shed Permit | It depends | Sheds over 200 square feet require a building permit; sheds of 200 square feet or less are exempt if they meet setbacks and easements, but any size shed in a mobile home park or multi-family zone requires a permit. | Fees are established by county ordinance and calculated automatically during the applic... |
| Solar Permit | Permit required | Separate SOL permits are required for ground mounted units or panels mounted on existing buildings; in new construction the solar panels are included in the NHC or ADS permit. | Fees for separate SOL permits are based on construction value; |
Electrical Permit in other Washington localities
Official sources
- https://clark.wa.gov/community-development/residential-permits
- https://lni.wa.gov/licensing-permits/electrical/electrical-permits-fees-and-inspections/
- https://clark.wa.gov/media/document/38762
- https://alpinecountyca.gov/DocumentCenter/View/6763/2022-CA-Residential-Codes-Section-R105---Permits
- https://www.parkcountyco.gov/DocumentCenter/View/2733/Residential-Inspection-Checklist
Verified by a person against the sources above on 2026-07-19, not confirmed with Washington State Department of Labor and Industries (Clark County does not issue electrical permits). Rules change; confirm before you build. How we verify.
Last checked: 2026-07-19Report an error on this page
Compare Electrical Permit requirements across Washington localities
Permit office
Washington State Department of Labor and Industries (Clark County does not issue electrical permits)
360.896.2300Washington rule changes
- Bellevue, WA sets a flat $290 re-roof permit fee (Ordinance 6879)
Ord. 6879 · 2026-07-25