Electrical Permit in Indianapolis, Indiana
It depends
Sometimes, depending on the project
Before any construction activity on an electrical power distribution system, including new circuits, service upgrades and rewiring, unless the work falls in one of the four published exceptions.
Quick answer
DBNS requires an electrical permit for any construction activity related to an electrical power distribution system, with four published exceptions: replacement of an attic fan, bathroom exhaust fan, range hood exhaust fan or whole house fan; installation of a single-phase circuit not exceeding 60 amperes at a nominal 120/240 volts that is part of installing, modernizing, replacing, servicing or repairing a heating system, space heating equipment, cooling system, space cooling equipment, a water heater or a food waste disposer for which a building permit has been issued; installation of household appliances such as window air conditioners, refrigerators, ranges, clothes washers, dryers, dishwashers, disposers and trash compactors when the installation does not include installing an electrical circuit; and connection, provision or use of temporary electrical power for on-site construction. The code adds that installing non-load-bearing walls is exempt from a structural permit but electrical permits are still required for the wiring. The permit must be pulled by an electrical contractor licensed in Marion County unless the homeowner passes the DBNS homeowner exam.
- Issued by
- City of Indianapolis Department of Business and Neighborhood Services (DBNS)
- Phone
- 317.327.8700
Who is pulling this permit?
Apply yourself
Hire it out
Sponsored
Electrical permits are usually pulled by the licensed electrician doing the job. If you are still choosing one, compare a few quotes first.
Compare electrician quotes on Angi
Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.
What an electrical permit costs in Indianapolis
- Fee schedule in force
- Official scheduleRead .
- Published in
- DBNS Fee Schedule (Permits, as of 1.5.2026), Electrical Permit (ELE):
- "Installation-New Structure or Commercial Addition" $202.00 for 2,500 sq ft or less plus $23.00 per additional 1,000 sq ft over 2,500 sq ft;
- "Repair to Existing Structure or Residential Addition" $169.00 for 1,000 sq ft or less plus $23.00 per additional 500 sq ft over 1,000 sq ft;
- "Install, Replace Space Heating Equipment" $146.00 for space heating, $146.00 for space cooling, $178.00 combined, for 10,000 sq ft or less;
- general service activity $89.00;
- self-certification tags $22.00.
- DBNS states craft permit fees did not change in the January 5, 2026 update.
Fees are the jurisdiction’s; we do not mark them up or estimate them.
How to apply in Indianapolis
General guide, not specific to this office
What an electrical permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how an electrical permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.
City of Indianapolis Department of Business and Neighborhood Services (DBNS)
- Department of Business and Neighborhood Services, 200 E. Washington St., Suite 107, Indianapolis, IN 46204
- Phone: 317.327.8700
- Email: permitquestions@indy.gov
Electrical Permit in Indianapolis compared with nearby Indiana localities
| Locality | Permit needed? | Threshold | What each Indiana schedule says | Verified |
|---|---|---|---|---|
| Indianapolis | It depends | Before any construction activity on an electrical power distribution system, including... | See schedule | |
| Fort Wayne | It depends | Before rewiring, changing or upgrading a service, adding circuits or outlets, or wiring... | See schedule |
Your Electrical Permit checklist for Indianapolis
- Confirm the requirement. Sometimes, depending on the project. Read the rule where we read it: indy.gov: residential development permits.
- Budget the fee. Price your project from the official fee schedule, which we read on .
- Apply. Start at the Indianapolis permit portal.
- Keep the office details handy. City of Indianapolis Department of Business and Neighborhood Services (DBNS). Phone: 317.327.8700. Email: permitquestions@indy.gov. Address: Department of Business and Neighborhood Services, 200 E. Washington St., Suite 107, Indianapolis, IN 46204.
Compiled from the official sources on this page. Last checked .
Permitting activity in Indianapolis
In 2025, Indianapolis authorized permits for 1,260 new residential housing units (959 single-family, 301 in multi-family buildings), valued at $400M, down from 1,823 the year before.
Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data.
What else needs a permit in Indianapolis
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | deck height above grade, excluding handrails, at which an improvement location permit becomes required | See schedule |
| Fence Permit | No permit needed | Exempt | No permit and therefore no permit fee is published for a residential fence |
| HVAC Permit | It depends | Before any construction activity on a heating, venting, air conditioning or... | See schedule |
| Patio Permit | It depends | patio height above grade at which an improvement location permit becomes required | See schedule |
| Plumbing Permit | It depends | share of a structure's piping replaced in kind with piping of the same performance specifications and capacity | See schedule |
| Pool Permit | It depends | above-ground pool or hot tub depth, for a pool 15 feet or less in diameter, at which an improvement location permit becomes required | See schedule |
| Roof Replacement Permit | It depends | Before a re-roof that changes the roof configuration, changes the covering type in a way... | See schedule |
| Shed Permit | It depends | shed base area, for a shed under 15 feet high, not on a permanent foundation and with no utility connection | See schedule |
| Solar Permit | Permit required | Any size | See schedule |
Frequently asked questions
- Do you need an electrical permit in Indianapolis?
- Sometimes: before any construction activity on an electrical power distribution system, including new circuits, service upgrades and rewiring, unless the work falls in one of the four published exceptions. If you are unsure how that applies to your project, call the permit office at 317.327.8700 before you start.
- How much does an electrical permit cost in Indianapolis?
- The fee wording from the official schedule is in the cost table on this page, as we read it on 15 Aug 2026. For the figure on your own project, call the permit office at 317.327.8700.
- Where do you apply for an electrical permit in Indianapolis?
- You can apply through the Indianapolis permit portal or contact the City of Indianapolis Department of Business and Neighborhood Services (DBNS) directly. The links are listed on this page.
- Can a homeowner pull an electrical permit themselves in Indianapolis?
- Under Indiana law (IC 36-7-8-3(a); IC 36-7-8-3(d); IC 25-28.5-1-11; IC 25-28.5-1-32(5)): Indiana is unusually permissive toward the homeowner doing the work. IC 36-7-8-3(d) provides that a county building standards ordinance adopted under that section does not apply to private homes that are built by individuals and used for their own occupancy, although the onsite sewage system still must comply with state law. That exemption is narrow: it reaches county ordinances for unincorporated areas under IC 36-7-8, not a city or town permit ordinance, so a homeowner inside municipal limits still answers to the local building department. On the trades, Indiana licenses plumbers at the state level but exempts the homeowner: IC 25-28.5-1-11 makes it unlawful to act as a plumbing contractor or journeyman plumber without a state license, while IC 25-28.5-1-32(5) excludes the owner occupant of a dwelling of eight or fewer residential units who is installing, altering, or repairing the plumbing system. Electricians are not licensed by the state at all: Indiana Code Title 25, which houses the professions and occupations licensing chapters, contains no electrician licensing chapter, and IC 36-7-8-3(a) instead lets a county adopt electrical standards by ordinance, so electrical licensing in Indiana is a local matter. Confirm how Indianapolis applies this before you apply.
From the Library
Electrical Permit in other Indiana localities
Everything above, sourced
How this electrical permit page for Indianapolis was verified. 1 official source: indy.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Indianapolis Department of Business and Neighborhood Services (DBNS). Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page