Solar Permit in Fort Worth, Texas

Permit required

Yes, a permit is required

Before installing rooftop or ground-mounted solar panels. The city's residential remodel submittal requirements for solar panels call for an engineered structural letter, a site plan showing the solar panel location, and an issued Electrical Standalone Permit.

Quick answer

Fort Worth treats solar panels as an accessory structure that requires a building permit, listing them by name alongside gazebos, wind turbines, and radio towers on its residential permitting page. The permit is not a single filing: the Residential Remodel checklist requires an engineered structural letter and a site plan showing panel location for the building side, plus a separately issued Electrical Standalone Permit for the electrical work. There is no size or capacity threshold below which a solar installation is exempt.

Issued by
City of Fort Worth Development Services Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?

Texas's owner-builder rule (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)) sets what you may do on your own home without hiring anyone. Read the statute.

What a solar permit costs in Fort Worth

Fee schedule in force
Official scheduleRead .
  • The Schedule of Mechanical Fees, Table 1-H, carries a "Solar energy system" line of $62.14, which is the thermal/mechanical side.
  • A photovoltaic array also requires an Electrical Standalone Permit billed on the electrical fee schedule.
  • Add the $33.08 permit application fee and the $16.87 technology fee.
  • Per Ordinance No. 26-28781, effective October 1, 2026.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Fort Worth compares in Texas

No Texas jurisdiction we have verified sets a size threshold for this permit, so what actually differs between them is the fee.

JurisdictionPermit needed?Typical fee
ArlingtonPermit requiredSee schedule
AustinPermit requiredSolar permits carry a $53.56 intake fee plus a $169.83 auxiliary power electrical permit base fee (an Austin Energy fee); the schedule has the rest
Corpus ChristiPermit requiredResidential construction is $0.461 per square foot with a $146.41 minimum (excluding mechanical, electrical and plumbing); the schedule has the rest
DallasPermit requiredSee schedule
El PasoPermit requiredSee schedule
Fort Worththis pagePermit requiredThe Schedule of Mechanical Fees, Table 1-H, carries a "Solar energy system" line of $62.14, which is the thermal/mechanical side
HoustonPermit requiredSolar panel permit fee is $91.06 plus the $33.56 administrative fee; the schedule has the rest

How to apply in Fort Worth

General guide, not specific to this office

What a solar permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a solar permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Fort Worth Development Services Department

Permitting activity in Fort Worth

In 2025, Fort Worth authorized permits for 9,437 new residential housing units (5,887 single-family, 3,550 in multi-family buildings), valued at $2.3B, down from 13,148 the year before. That works out to about 10.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 918,105.

What else needs a permit in Fort Worth

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the platform, walk or deck above grade, and whether it sits over a basement or story belowSee schedule
Electrical PermitPermit requiredAny sizeBilled per item on the electrical fee schedule: services and subpanels 60 amps to 100 amps $19.75, over 100 amps to 150 amps $29.17, over 150 amps $39.53
Fence PermitIt dependsheight of a solid fence, with open wire fences without slats exempt up to 8 feetEvery permit carries the Table 1-B fees: a $33.08 permit application fee (all permit types, excluding signs) and a $16.87 technology fee
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsheight of the patio platform or walk above grade; a patio cover is a separate accessory structure regardless of the slab heightSee schedule
Plumbing PermitPermit requiredAny sizeBilled per fixture on the Schedule of Plumbing Fees, Table 1-I: first fixture or appliance $10.34; the schedule has the rest
Pool PermitIt dependscapacity of a prefabricated pool accessory to a single-family dwelling and installed entirely above groundThe electrical fee schedule carries a flat "Swimming pools" line of $56.48
Roof Replacement PermitIt dependswhether any decking, sheathing, lathing boards, rafters, or ridge boards are replacedA reroof that needs a permit is residential remodel work billed under Table 1A-1 by number of trades, minimum permit fee $119.00 for 1 trade
Shed PermitPermit requiredAny sizeA shed is a Group U accessory structure billed on new square footage under Table 1-C-4: $102.00 for 0 to 175 square feet; the schedule has the rest

Frequently asked questions

Do you need a solar permit in Fort Worth?
Yes, before installing rooftop or ground-mounted solar panels. The city's residential remodel submittal requirements for solar panels call for an engineered structural letter, a site plan showing the solar panel location, and an issued Electrical Standalone Permit. If you are unsure how that applies to your project, call the City of Fort Worth Development Services Department at 817-392-2222 before you start.
How much does a solar permit cost in Fort Worth?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Fort Worth Development Services Department at 817-392-2222.
How long does a solar permit take in Fort Worth?
In Fort Worth, a solar permit typically takes 7 business days for first review comments on a residential building permit. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a solar permit in Fort Worth?
You can apply through the Fort Worth permit portal or contact the City of Fort Worth Development Services Department directly. The links are listed on this page.
Can a homeowner pull a solar permit themselves in Fort Worth?
Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Fort Worth applies this before you apply.

From the Library

Solar Permit in other Texas localities

Everything above, sourced

How this solar permit page for Fort Worth was verified. 1 official source: fortworthtexas.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Fort Worth Development Services Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page