Shed Permit in Fort Worth, Texas
Permit required
Yes, a permit is required
Before installing any storage building, including a shipping container used for storage. The permit must be applied for and approved before construction begins, and the city warns that failing to do so can result in a double fee.
By Mario Bailey, verified against official sources
Quick answer
Fort Worth requires a building permit for every storage building, with no size floor. The city's Residential Accessory Building Packet adds zoning limits that are separate from the permit trigger: accessory structures are not permitted in front yards, non-habitable accessory buildings are limited to one story, lot coverage maxes out at 50 percent, and the maximum accessory building size runs 120 square feet on lots of 5,000 square feet or less, 200 square feet on 5,001 to 9,999, 400 square feet on 10,000 to 43,559, and 2 percent of lot area at 43,560 and up. Setbacks scale with height, from 5 feet off the rear and side yards at up to 10 feet tall to 9 feet at the 12 foot maximum height without a variance.
Who is pulling this permit?
Apply yourself
Hire it out
Before you sign, ask the contractor:
- Who pulls the permit, you or me, and is the permit fee included in the bid?
- Which inspections will this job need, and who meets the inspector on site?
- Is your contractor license active in this locality, and under which business name?
When a permit is usually needed
Before installing any storage building, including a shipping container used for storage. The permit must be applied for and approved before construction begins, and the city warns that failing to do so can result in a double fee.
What a shed permit costs in Fort Worth
How Fort Worth compares in Texas
| Jurisdiction | Permit needed? | Threshold |
|---|---|---|
| Arlington | It depends | floor area of a one-story detached tool or storage shed |
| Corpus Christi | It depends | Detached storage buildings larger than 200 square feet need a building permit; accessory structures 200 square feet or less are on the city's published exemption list. |
| Dallas | It depends | one-story detached utility or storage buildings under 200 sq ft without utilities on single-family or duplex premises are exempt from a permit |
| El Paso | It depends | The exemption covers accessory storage buildings or structures of less than 200 square feet of floor area, and is limited to one such accessory structure per site. |
| Fort Worththis page | Permit required | Not specified |
| Houston | It depends | one-story detached accessory structure under 120 sq ft does not require a permit |
| Lubbock | It depends | The building permit threshold for a detached accessory building is 200 square feet of floor area. |
How to apply in Fort Worth
A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing.
What most shed permit applications include:
- A written permit application identifying the proposed work and describing the property by its address or legal description, filed with the building department before construction begins (IRC R105.3).
- A scaled site plan showing the shed's size and location and its dimensioned distances to all property lines so required setbacks can be verified before the permit is issued (IRC R106.2).
- Construction documents showing the shed's foundation: freestanding accessory structures at or under the code's small-structure size and eave-height limits (600 square feet and a 10 foot eave height in the model code) are exempt from continuous footings but must still be shown supported on undisturbed soil or engineered fill and anchored to resist wind-induced uplift and overturning (IRC R403.1).
- Where the shed does sit on a continuous foundation with a wood sill plate, anchor bolt or approved strap details tying the sill plate to the foundation (IRC R403.1.6).
- Roof framing details showing the rafter-to-wall or truss-to-wall connections, since even a shed exempt from continuous footings must be anchored to resist wind-induced uplift and overturning (IRC R403.1; R802.11).
General submittal guidance from IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC. Source. City of Fort Worth Development Services Department sets the exact checklist for Fort Worth.
Where to apply in Fort Worth:
City of Fort Worth Development Services Department
- New City Hall, 100 Fort Worth Trail, Fort Worth, TX 76102
- Phone: 817-392-2222
- Email: DevCustomerService@fortworthtexas.gov
Inspections and closing out your permit
A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
- Foundation or anchor inspection: called after any required footings, piers, or ground anchors are set and any forms or reinforcing steel are in place, but before concrete is placed, so the foundation or anchoring system can be verified before it is covered (IRC R109.1.1).
- Frame inspection: after the shed is framed, sheathed, and braced, the inspector checks the framing, bracing, fasteners, and the roof connections that resist wind uplift, before those elements are covered (IRC R109.1.4 frame inspection; R403.1 anchorage).
- Final inspection: made after the permitted work is complete and before the shed is used; work may not proceed past any inspection stage without the building official's approval (IRC R109.1.6 final inspection; R109.4 approval required).
- For a pre-fabricated or kit shed, the manufacturer's installation instructions must be on site at the time of inspection so the inspector can confirm the anchoring and assembly match the design (IRC R106.1.2).
Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Fort Worth permit portal or by phone at 817-392-2222.
Inspection sequence from IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC. Source. An open permit left un-inspected can surface later in a title search or home sale.
Your Shed Permit checklist for Fort Worth
- Confirm the requirement. Yes, a permit is required. Usually needed: Before installing any storage building, including a shipping container used for storage. The permit must be applied for and approved before construction begins, and the city warns that failing to do so can result in a double fee.
- Budget the fee. A shed is a Group U accessory structure billed on new square footage under Table 1-C-4: $96.84 for 0 to 175 square feet, reduced to $58.10 where the footnote applies ("New square footage for accessory Group U uses associated with existing R-3's shall be charged the fee in the parenthesis"), then $0.19 for each additional square foot to and including 2,500. Add the $31.50 permit application fee and the $16.87 technology fee. Per Ordinance No. 27191-09-2024, effective October 1, 2024. Official fee schedule.
- Apply. A residential shed permit application, once the shed is large enough to require one, is a set of construction documents that show what will be built and prove it meets the adopted residential code. In practice that means a written permit application, a scaled site plan locating the shed and its distances to the property lines, and construction documents covering the shed's foundation or anchoring system and its framing. Start at the Fort Worth permit portal.
- Keep the office details handy. City of Fort Worth Development Services Department. Phone: 817-392-2222. Address: New City Hall, 100 Fort Worth Trail, Fort Worth, TX 76102.
- Plan for inspections. A permitted shed is inspected in stages as it goes up: the foundation or the anchors that hold it down before they are covered, the framing before it is enclosed, and a final inspection once the shed is finished. Each stage checks the items that would be hidden or unsafe if skipped.
Compiled from the official sources on this page. Last checked .
Frequently asked questions
- Do you need a shed permit in Fort Worth?
- Fort Worth requires a building permit for every storage building, with no size floor. The city's Residential Accessory Building Packet adds zoning limits that are separate from the permit trigger: accessory structures are not permitted in front yards, non-habitable accessory buildings are limited to one story, lot coverage maxes out at 50 percent, and the maximum accessory building size runs 120 square feet on lots of 5,000 square feet or less, 200 square feet on 5,001 to 9,999, 400 square feet on 10,000 to 43,559, and 2 percent of lot area at 43,560 and up. Setbacks scale with height, from 5 feet off the rear and side yards at up to 10 feet tall to 9 feet at the 12 foot maximum height without a variance. Always confirm with the City of Fort Worth Development Services Department before starting.
- How much does a shed permit cost in Fort Worth?
- A shed is a Group U accessory structure billed on new square footage under Table 1-C-4: $96.84 for 0 to 175 square feet, reduced to $58.10 where the footnote applies ("New square footage for accessory Group U uses associated with existing R-3's shall be charged the fee in the parenthesis"), then $0.19 for each additional square foot to and including 2,500. Add the $31.50 permit application fee and the $16.87 technology fee. Per Ordinance No. 27191-09-2024, effective October 1, 2024. See the official fee schedule for current amounts.
- How long does a shed permit take in Fort Worth?
- In Fort Worth, a shed permit typically takes 7 business days for first review comments on a residential building permit. Times can vary by workload and project scope, so confirm with the office.
- Where do you apply for a shed permit in Fort Worth?
- You can apply through the Fort Worth permit portal or contact the City of Fort Worth Development Services Department directly. The links are listed on this page.
- Can a homeowner pull a shed permit themselves in Fort Worth?
- Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Fort Worth applies this before you apply.
From the Library
What else needs a permit in Fort Worth
Every other permit type we have verified for this jurisdiction, with the rule that applies here.
| Project | Permit needed? | Threshold | Typical fee |
|---|---|---|---|
| Deck Permit | It depends | height of the platform, walk or deck above grade, and whether it sits over a basement or story below | No deck-specific line item is published. |
| Electrical Permit | Permit required | Not specified | Billed per item on the Schedule of Electrical Fees, Table 1-J: services and subpanels 60... |
| Fence Permit | It depends | height of a solid fence, with open wire fences without slats exempt up to 8 feet | The Development Fee Schedule publishes no residential fence line item. |
| HVAC Permit | Permit required | Not specified | Billed per unit on the Schedule of Mechanical Fees, Table 1-H: forced air heating... |
| Patio Permit | It depends | height of the patio platform or walk above grade; a patio cover is a separate accessory structure regardless of the slab height | No patio-specific line item is published. |
| Plumbing Permit | Permit required | Not specified | Billed per fixture on the Schedule of Plumbing Fees, Table 1-I: first fixture or... |
| Pool Permit | It depends | capacity of a prefabricated pool accessory to a single-family dwelling and installed entirely above ground | The Schedule of Electrical Fees, Table 1-J, carries a flat "Swimming pools: $53.79" line. |
| Roof Replacement Permit | It depends | whether any decking, sheathing, lathing boards, rafters, or ridge boards are replaced | A reroof that needs a permit is residential remodel work billed under Table 1-A-1 by... |
| Solar Permit | Permit required | Not specified | The Schedule of Mechanical Fees, Table 1-H, carries a "Solar energy system: $59.18"... |
Shed Permit in other Texas localities
Everything above, sourced
Code references
National and state model-code sections the general guidance on this page is drawn from. They are not Fort Worth documents; the office above sets the local rules.
- IRC R105.3 (permit application), R106.2 (site plan), R403.1 (footings and anchorage for accessory structures), and R403.1.6 (sill anchorage), 2021 IRC
- IRC R109.1.1 (foundation inspection), R109.1.4 (frame inspection), R109.1.6 (final inspection), and R106.1.2 (manufacturer's instructions on site), 2021 IRC
Verified by a person against the sources above on , not confirmed with City of Fort Worth Development Services Department. Rules change; confirm before you build. How we verify.
Last checked: Report an error on this page
Compare
Shed Permit across Texas