Texas / Fort Worth

Roof Replacement Permit in Fort Worth, Texas

It depends

Sometimes, depending on the project

When the job replaces decking material, lathing boards, sheathing boards, rafters, or ridge boards, or changes the pitch of the roof (which also requires construction plans and elevation drawings). A shingles-only tear-off and replacement does not need a permit, though the code still limits how many shingle layers are allowed and requires crickets and drip edges to be added when reroofing even if they do not currently exist.

Confirmed on official page Verified City of Fort Worth Development Services Department

By Mario Bailey, verified against official sources

Quick answer

Fort Worth splits reroofing at the deck line. The Building Administrative Code exempts "Roof repairs on Group R-3 and their accessory structures," defining roof repairs as the repair and replacement of the material above, but not including, the decking material, lathing boards, or sheathing boards. So shingles alone are permit-free and anything structural underneath is not. The city's Residential Remodel packet says it plainly: if the scope involves changing out the decking/sheathing and shingles, submit a building permit application with a detailed scope of work; if the scope is shingle replacement only, no permit is required.

Typical threshold: whether any decking, sheathing, lathing boards, rafters, or ridge boards are replaced.

Who is pulling this permit?

Hire it out

Before you sign, ask the contractor:

  • Who pulls the permit, you or me, and is the permit fee included in the bid?
  • Which inspections will this job need, and who meets the inspector on site?
  • Is your contractor license active in this locality, and under which business name?

When a permit is usually needed

When the job replaces decking material, lathing boards, sheathing boards, rafters, or ridge boards, or changes the pitch of the roof (which also requires construction plans and elevation drawings). A shingles-only tear-off and replacement does not need a permit, though the code still limits how many shingle layers are allowed and requires crickets and drip edges to be added when reroofing even if they do not currently exist.

What a roof replacement permit costs in Fort Worth

Line item
roof replacement permitBy formulaA reroof that needs a permit is residential remodel work billed under Table 1-A-1 by number of trades, minimum permit fee $112.50 for 1 trade. Add the $31.50 permit application fee and the $16.87 technology fee. Per Ordinance No. 27191-09-2024, effective October 1, 2024. Accela files these under the record type "Residential Remodel Reroof Permit.".
Fee schedule in forceOfficial scheduleRead . Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Fort Worth compares in Texas

JurisdictionPermit needed?Threshold
ArlingtonIt dependsarea of roof covering material being replaced
AustinIt dependsasphalt shingle re-roofing is generally exempt unless property is in the Wildland-Urban Interface area and 50% or more of the roofing is being replaced
Corpus ChristiIt dependsThe 100 square feet measures the area of shingles replaced. A re-roof permit is triggered by replacing shingles in excess of 100 square feet, by changing the slope of the roof, by removing and replacing roof decking, or by changing the roof material; any one trigger alone requires the permit.
DallasIt dependsre-roofing of single-family or duplex valued at $500 or less does not require a permit; re-roofing valued over $500 or full replacement requires a permit
El PasoIt dependsThe 25 percent is a share of the residential roof covering being replaced, measured across the roof rather than as an area in square feet or a count of squares.
Fort Worththis pageIt dependswhether any decking, sheathing, lathing boards, rafters, or ridge boards are replaced
HoustonPermit requiredNot specified

How to apply in Fort Worth

A residential reroof permit application is lighter than for structural work: you state whether the scope is a full tear-off (roof replacement) or an overlay (roof recover), describe the covering material and its manufacturer instructions, and note the condition of the existing deck, since those facts determine which code path applies.

What most roof replacement permit applications include:

  • State on the application whether the job is a roof replacement, which strips all existing layers down to the bare deck, or a roof recover, which leaves the old covering in place under specific conditions, since the two scopes are governed differently (IRC R908.3).
  • A recover is only an option where the new covering follows the roof covering manufacturer's approved instructions or is a self-supporting system, such as standing-seam metal, that does not rely on the existing roof for support (IRC R908.3.1).
  • Full tear-off must be scoped on the application instead of a recover when the existing roof is water soaked or deteriorated, is slate, clay, cement, or asbestos-cement tile, or already carries two or more layers of roof covering (IRC R908.3.1.1).
  • The materials and installation methods described on the application must comply with the reroofing requirements of the roof-assemblies chapter (IRC R908.1).
  • If the scope reuses existing slate, clay, or cement tile, damaged or broken pieces cannot be listed for reinstallation, and any rusted or deteriorated flashings, edgings, outlets, or vents uncovered during tear-off must be scoped for replacement (IRC R908.5).

General submittal guidance from IRC Section R908 Reroofing (text as adopted in the 2020 Residential Code of New York State, based on the 2018 IRC). Source. City of Fort Worth Development Services Department sets the exact checklist for Fort Worth.

Where to apply in Fort Worth:

City of Fort Worth Development Services Department

Inspections and closing out your permit

Most residential reroofs get two to three field inspections keyed to the scope of work: a deck or nailing check when sheathing is exposed or replaced, a final on the completed covering and flashings, and in some high-wind regions a dedicated check of mitigation measures added during tear-off.

  1. Where the covering is fully removed and the sheathing is exposed, replaced, or added, inspectors check the deck and its nailing before any new roofing goes down, since the structural framework must be able to carry the new covering's loads (IRC R908.2).
  2. An overlay is only approved where it meets one of the code's listed recover conditions, such as installation in accordance with the covering manufacturer's approved instructions (IRC R908.3.1).
  3. Flashings disturbed or replaced during the job are checked against the approved manufacturer's installation instructions, and metal flashing that will receive bituminous material must be primed before installation (IRC R908.6).
  4. A final inspection confirms the completed roof covering and its fasteners were installed as required for that material and per manufacturer instructions before the permit is closed (IRC R905).
  5. In some regions with strengthened wind provisions, reroofing an older single-family home also triggers inspection of supplemental deck-nailing and a secondary water barrier added during tear-off, on top of the base reroofing requirements (Florida Building Code, Residential R908.7 Mitigation).
  6. Reinstalled existing slate, clay, or cement tile is checked against reuse limits at inspection, and any rusted, damaged, or deteriorated flashings, edgings, outlets, or vents found during tear-off must be replaced rather than reinstalled (IRC R908.5).

Schedule each inspection in advance and pass the final before you use the work or close the permit. Request inspections through the Fort Worth permit portal or by phone at 817-392-2222.

Inspection sequence from IRC Section R908 Reroofing and Section R905 Roof Coverings (2021 International Residential Code). Source. An open permit left un-inspected can surface later in a title search or home sale.

Frequently asked questions

Do you need a roof replacement permit in Fort Worth?
Fort Worth splits reroofing at the deck line. The Building Administrative Code exempts "Roof repairs on Group R-3 and their accessory structures," defining roof repairs as the repair and replacement of the material above, but not including, the decking material, lathing boards, or sheathing boards. So shingles alone are permit-free and anything structural underneath is not. The city's Residential Remodel packet says it plainly: if the scope involves changing out the decking/sheathing and shingles, submit a building permit application with a detailed scope of work; if the scope is shingle replacement only, no permit is required. Whether any decking, sheathing, lathing boards, rafters, or ridge boards are replaced. Always confirm with the office before starting.
How much does a roof replacement permit cost in Fort Worth?
A reroof that needs a permit is residential remodel work billed under Table 1-A-1 by number of trades, minimum permit fee $112.50 for 1 trade. Add the $31.50 permit application fee and the $16.87 technology fee. Per Ordinance No. 27191-09-2024, effective October 1, 2024. Accela files these under the record type "Residential Remodel Reroof Permit.". See the official fee schedule for current amounts.
How long does a roof replacement permit take in Fort Worth?
In Fort Worth, a roof replacement permit typically takes 7 business days for first review comments on a residential building permit. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a roof replacement permit in Fort Worth?
You can apply through the Fort Worth permit portal or contact the City of Fort Worth Development Services Department directly. The links are listed on this page.
Can a homeowner pull a roof replacement permit themselves in Fort Worth?
Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Fort Worth applies this before you apply.

From the Library

What else needs a permit in Fort Worth

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the platform, walk or deck above grade, and whether it sits over a basement or story belowNo deck-specific line item is published.
Electrical PermitPermit requiredNot specifiedBilled per item on the Schedule of Electrical Fees, Table 1-J: services and subpanels 60...
Fence PermitIt dependsheight of a solid fence, with open wire fences without slats exempt up to 8 feetThe Development Fee Schedule publishes no residential fence line item.
HVAC PermitPermit requiredNot specifiedBilled per unit on the Schedule of Mechanical Fees, Table 1-H: forced air heating...
Patio PermitIt dependsheight of the patio platform or walk above grade; a patio cover is a separate accessory structure regardless of the slab heightNo patio-specific line item is published.
Plumbing PermitPermit requiredNot specifiedBilled per fixture on the Schedule of Plumbing Fees, Table 1-I: first fixture or...
Pool PermitIt dependscapacity of a prefabricated pool accessory to a single-family dwelling and installed entirely above groundThe Schedule of Electrical Fees, Table 1-J, carries a flat "Swimming pools: $53.79" line.
Shed PermitPermit requiredNot specifiedA shed is a Group U accessory structure billed on new square footage under Table 1-C-4:...
Solar PermitPermit requiredNot specifiedThe Schedule of Mechanical Fees, Table 1-H, carries a "Solar energy system: $59.18"...

Roof Replacement Permit in other Texas localities

Everything above, sourced

Code references

National and state model-code sections the general guidance on this page is drawn from. They are not Fort Worth documents; the office above sets the local rules.

Verified by a person against the sources above on , not confirmed with City of Fort Worth Development Services Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page