It depends

Sometimes, depending on the project

Before installing any in-ground pool, spa, or hot tub, and before installing an above-ground pool that holds more than 5,000 gallons or is not entirely above ground. Pool plans must be stamped and signed off by Oncor Electric before submittal, a Texas Excavation Safety System locate must be requested before plans are submitted, and private residential pools, spas, and hot tubs must submit an Entrapment Form.

Quick answer

Fort Worth's only pool exemption is narrow: a prefabricated pool accessory to a single-family (Group R-3) home that does not exceed 5,000 gallons and is installed entirely above ground. Everything else needs a permit, and the city's own permitting page lists swimming pools among the accessory structures that all require a building permit. The Residential Accessory Building Packet (Pools) states that all pools shall comply with the 2018 International Swimming Pool and Spa Code along with sections of the 2021 International Plumbing Code, the 2023 National Electrical Code, and Fort Worth's amendments to each.

Typical threshold
capacity of a prefabricated pool accessory to a single-family dwelling and installed entirely above ground
Issued by
City of Fort Worth Development Services Department
Confirmed on official page Verified

Who is pulling this permit?

Hire it out

Sponsored

Pool builders handle the permit and its safety requirements as part of the job. Comparing a few bids before you sign is the useful next step.

Compare pool builder quotes on Angi

Sponsored link. PermitNotebook may earn a fee if you request quotes through it. Partners never influence our permit data.

What a pool permit costs in Fort Worth

Fee schedule in force
Official scheduleRead .
  • The electrical fee schedule carries a flat "Swimming pools" line of $56.48.
  • The building side has no square footage, so no Table 1-C fee applies.
  • Add the $33.08 permit application fee and the $16.87 technology fee.
  • Per Ordinance No. 26-28781, effective October 1, 2026.

Fees are the jurisdiction’s; we do not mark them up or estimate them.

How Fort Worth compares in Texas

JurisdictionPermit needed?Threshold
ArlingtonIt dependsdepth of a prefabricated inflatable swimming pool
AustinIt dependsprefabricated pools less than 24 inches deep are exempt; all other residential pools require a permit
Corpus ChristiIt dependsEvery in-ground pool needs a permit; an above-ground pool needs one once it holds more than 5,000 gallons or is more than 24 inches deep, and prefabricated pools under both figures are on the city's published exemption list.
DallasIt dependsprefabricated pools accessory to single-family or duplex premises are exempt when the pool wall is completely above adjacent grade, the capacity does not exceed 5,000 gallons, and the pool depth is less than 24 inches
El PasoIt dependsPools and ponds over 24 inches of depth require a permit, as do above ground pools containing 5,000 gallons of water or more.
Fort Worththis pageIt dependscapacity of a prefabricated pool accessory to a single-family dwelling and installed entirely above ground
Harris CountyPermit requiredAny size

How to apply in Fort Worth

General guide, not specific to this office

What a pool permit application usually includes, and which inspections usually follow, is much the same from place to place, so we explain it once: how a pool permit works, from application to final inspection. That guide describes common practice under the model codes. The office on this page sets the actual checklist.

City of Fort Worth Development Services Department

Permitting activity in Fort Worth

In 2025, Fort Worth authorized permits for 9,437 new residential housing units (5,887 single-family, 3,550 in multi-family buildings), valued at $2.3B, down from 13,148 the year before. That works out to about 10.3 permits per 1,000 residents.

Source: U.S. Census Bureau, Building Permits Survey, 2025 annual data · population 918,105.

What else needs a permit in Fort Worth

Every other permit type we have verified for this jurisdiction, with the rule that applies here.

ProjectPermit needed?ThresholdTypical fee
Deck PermitIt dependsheight of the platform, walk or deck above grade, and whether it sits over a basement or story belowSee schedule
Electrical PermitPermit requiredAny sizeBilled per item on the electrical fee schedule: services and subpanels 60 amps to 100 amps $19.75, over 100 amps to 150 amps $29.17, over 150 amps $39.53
Fence PermitIt dependsheight of a solid fence, with open wire fences without slats exempt up to 8 feetEvery permit carries the Table 1-B fees: a $33.08 permit application fee (all permit types, excluding signs) and a $16.87 technology fee
HVAC PermitPermit requiredAny sizeSee schedule
Patio PermitIt dependsheight of the patio platform or walk above grade; a patio cover is a separate accessory structure regardless of the slab heightSee schedule
Plumbing PermitPermit requiredAny sizeBilled per fixture on the Schedule of Plumbing Fees, Table 1-I: first fixture or appliance $10.34; the schedule has the rest
Roof Replacement PermitIt dependswhether any decking, sheathing, lathing boards, rafters, or ridge boards are replacedA reroof that needs a permit is residential remodel work billed under Table 1A-1 by number of trades, minimum permit fee $119.00 for 1 trade
Shed PermitPermit requiredAny sizeA shed is a Group U accessory structure billed on new square footage under Table 1-C-4: $102.00 for 0 to 175 square feet; the schedule has the rest
Solar PermitPermit requiredAny sizeThe Schedule of Mechanical Fees, Table 1-H, carries a "Solar energy system" line of $62.14, which is the thermal/mechanical side

Frequently asked questions

Do you need a pool permit in Fort Worth?
It depends on the project. Capacity of a prefabricated pool accessory to a single-family dwelling and installed entirely above ground. If you are unsure how that applies to your project, call the City of Fort Worth Development Services Department at 817-392-2222 before you start.
How much does a pool permit cost in Fort Worth?
The fee wording from the official schedule is in the cost table on this page, as we read it on 16 Nov 2026. For the figure on your own project, call the City of Fort Worth Development Services Department at 817-392-2222.
How long does a pool permit take in Fort Worth?
In Fort Worth, a pool permit typically takes 7 business days for first review comments on a residential building permit. Times can vary by workload and project scope, so confirm with the office.
Where do you apply for a pool permit in Fort Worth?
You can apply through the Fort Worth permit portal or contact the City of Fort Worth Development Services Department directly. The links are listed on this page.
Can a homeowner pull a pool permit themselves in Fort Worth?
Under Texas law (Tex. Occupations Code 1305.003(a)(6), 1301.051; Tex. Local Government Code 233.157(c)): Texas licenses individual construction trades rather than general contractors, so no state statute requires a license to act as your own general contractor on your own house. For electrical work, the state licensing law does not apply to work performed in or on a dwelling by a person who owns and resides in it, but only where no municipal ordinance specifically regulates that work, so city electrical licensing and permit rules still control inside city limits (Occupations Code 1305.003(a)(6)). For plumbing, a property owner does not need a state license to perform plumbing in the owner's homestead (Occupations Code 1301.051). In opt-in counties' unincorporated areas, an individual who builds their own house or acts as their own contractor is exempt from the Class C misdemeanor penalty for inspection notice failures if they intend to use the home as their primary residence (Local Government Code 233.157(c)). None of these exemptions waive local permit or inspection requirements where they apply. Confirm how Fort Worth applies this before you apply.

From the Library

Pool Permit in other Texas localities

Everything above, sourced

How this pool permit page for Fort Worth was verified. 2 official sources: fortworthtexas.gov, fortworthtexas.gov; fee schedule: official document. Last checked by Mario Bailey, not confirmed with City of Fort Worth Development Services Department. Rules change; confirm before you build. How we verify.

Last checked: Report an error on this page

It depends
Check my project